Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20115E892 + (ML20115E892)
- BECO-92-119, Forwards Anticipated Operator Licensing Exam Schedule,Per GL 92-06, Operator Licensing Natl Exam Schedule + (ML20115E894)
- ST-HL-AE-1225, Forwards Effective Page Listing to FSAR Through Amend 45. Listing Not Formal Addition & Will Be Updated Periodically + (ML20115E899)
- 05000325/LER-1992-024, :on 920919,relay Failure Resulted in RPS B Power Loss Causing ESF Actuation Signals.Caused by Broken T-Bar in Relay 1-C71B-K1B.Relay Repaired,Fuse Replaced & RPS Bus B Restored + (ML20115E900)
- ML20115E902 + (ML20115E902)
- ML20115E915 + (ML20115E915)
- ST-HL-AE-5425, Submits Change to Distribution List for Transmittals Re Facility + (ML20115E921)
- 1CAN048503, Discusses Inspectability of Sleeved once-through Steam Generator Tubes,Per 850228 Request.Addl Time Necessary for Complete Response.Info Will Be Provided by 850510 + (ML20115E932)
- 3F0485-05, Forwards Rev 4 to Modified Amended Security Plan.Rev Withheld (Ref 10CFR73.21) + (ML20115E947)
- ML20115E971 + (ML20115E971)
- JAFP-96-0275, Monthly Operating Rept for June 1996 for Ja FitzPatrick Nuclear Power Plant + (ML20115E972)
- ML20115E973 + (ML20115E973)
- ML20115E974 + (ML20115E974)
- ML20115E982 + (ML20115E982)
- ML20115E995 + (ML20115E995)
- ML20115E999 + (ML20115E999)
- 05000324/LER-1992-005, :on 920528,MCC 2-2XB-2 Declared Inoperable Due to Seismic Support & Anchorage Deficiencies.Root Cause Analysis in Progress.Subj MCC Repaired & Engineering Evaluation Procedure ENP-12 Will Be Revised + (ML20115F007)
- ML20115F011 + (ML20115F011)
- ML20115F024 + (ML20115F024)
- ML20115F030 + (ML20115F030)
- ML20115F042 + (ML20115F042)
- 05000289/LER-1992-002-01, :on 920918,reactor Tripped as Result of Inadequate Review for Removal of Circulation Water Pump Trip on High Condenser Inlet Water Box Pressure.Procedures Will Be Revised to Provide Addl Guidance + (ML20115F046)
- ML20115F047 + (ML20115F047)
- ML20115F062 + (ML20115F062)
- 05000293/LER-1992-012, :on 920916,noted That Recirculation Flow Converters May Not Have Been Calibr During Period 900724- 920916.Caused by Personnel Error.Recirculation Flow Converters Calibr Completed on 920916 + (ML20115F084)
- ML20115F099 + (ML20115F099)
- ML20115F102 + (ML20115F102)
- ML20115F103 + (ML20115F103)
- ML20115F104 + (ML20115F104)
- ML20115F110 + (ML20115F110)
- ML20115F111 + (ML20115F111)
- ML20115F115 + (ML20115F115)
- RBG-20643, Informs of Delay in Submission of Addl Info Re IE Bulletin 84-02,per Util 850201 Commitment.Interim or Final Status Rept Will Be Submitted by 850531,upon Obtaining List of Hfa Relays Discussed in + (ML20115F117)
- ST-HL-AE-1232, Forwards Colorado River Entrainment & Impingement Monitoring Program Phase Two Studies - Jul-Dec 1984, Rept 2.Rept Describes Progress of Entrainment & Impingement Programs During Cooling Reservoir Filling Operations + (ML20115F118)
- ML20115F121 + (ML20115F121)
- ML20115F125 + (ML20115F125)
- ML20115F131 + (ML20115F131)
- ML20115F139 + (ML20115F139)
- ML20115F140 + (ML20115F140)
- ML20115F143 + (ML20115F143)
- ML20115F144 + (ML20115F144)
- ML20115F159 + (ML20115F159)
- ML20115F167 + (ML20115F167)
- ML20115F178 + (ML20115F178)
- ML20115F191 + (ML20115F191)
- L-85-155, Responds to Notice of Violation & Proposed Imposition of Civil Penalty Identified in Insp Repts 50-250/84-29 & 50-251/84-30.Corrective Actions:Min Equipment List Posted at Each Operating Station + (ML20115F200)
- ML20115F214 + (ML20115F214)
- ML20115F221 + (ML20115F221)
- ML20115F227 + (ML20115F227)
- ML20115F228 + (ML20115F228)
- ML20115F229 + (ML20115F229)