Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20105B721 + (ML20105B721)
- ML20105B723 + (ML20105B723)
- 2CAN099201, Responds to NRC 920820 Telcon Request for Util to Upgrade SBLOCA to Reflect Quantitative Evaluation of Spectrum of Break Sizes If Future Mods Made to Facility Which Would Impact Existing SBLOCA Model + (ML20105B737)
- NG-92-4048, Suppls 911223 Response to Suppl 4 to GL 88-20 Re Proposed Programs for Completing IPEEE for plant-specific Severe Accident Vulnerabilities & GL-87-02,Suppl 1.Response Will Be Submitted No Later than 920921 + (ML20105B750)
- ML20105B757 + (ML20105B757)
- ML20105B758 + (ML20105B758)
- ML20105B762 + (ML20105B762)
- 05000458/LER-1991-020, :on 911024,discrepancy Discovered Between TS Section 3/4.6.6.3 Re Primary Containment/Drywell Hydrogen Ignition Sys & Applicable Surveillance Test Procedure.Caused by Inadequate Review.Procedures Revised + (ML20105B765)
- RBG-37484, Clarifies 920122 Response to Violations Noted in Insp Rept 50-458/91-27 on 911023-1203.Corrective Actions:Formal Training Course on 10CFR50.59 Evaluation Process Developed + (ML20105B766)
- 05000333/LER-1992-041, :on 920817,technician Found Both Stack Sample Pumps Off.Caused by Loss of Stack Gas Sampling Due to Missed Low Flow Indication by Operator.Stack Monitor Sample Flow Reestablished & Work Request Written + (ML20105B768)
- ML20105B769 + (ML20105B769)
- ML20105B777 + (ML20105B777)
- ML20105B778 + (ML20105B778)
- ML20105B780 + (ML20105B780)
- ML20105B782 + (ML20105B782)
- 2CAN099208, Forwards Completed Notarized Page Re Response to NRC Bulletin 88-011,inadvertently Omitted from + (ML20105B792)
- ML20105B798 + (ML20105B798)
- ML20105B803 + (ML20105B803)
- ML20105B805 + (ML20105B805)
- ML20105B806 + (ML20105B806)
- ML20105B813 + (ML20105B813)
- ML20105B814 + (ML20105B814)
- ML20105B818 + (ML20105B818)
- ML20105B819 + (ML20105B819)
- ML20105B821 + (ML20105B821)
- ML20105B824 + (ML20105B824)
- 05000455/LER-1992-005-10, :on 920814,discovered That LCO Action Requirement for Instrumentation,Turbine Overspeed Protection Never Entered During Work on Check Valve on 920813.Caused by Personnel Error.Surveillance Performed + (ML20105B826)
- ML20105B827 + (ML20105B827)
- ML20105B828 + (ML20105B828)
- ML20105B833 + (ML20105B833)
- ML20105B841 + (ML20105B841)
- ML20105B845 + (ML20105B845)
- ML20105B846 + (ML20105B846)
- ML20105B847 + (ML20105B847)
- ML20105B848 + (ML20105B848)
- ML20105B855 + (ML20105B855)
- ML20105B863 + (ML20105B863)
- 2CAN099207, Forwards Addl Info Re Instrument Error Calculations for Containment Bldg & Pressurizer Pressure Transmitters. Calculations 91-EQ-2002-02,Rev 0 & 92-EQ-0002-01,Rev 0(2) Encl.Info Submitted to Support 920709 TS Change Request + (ML20105B864)
- ML20105B868 + (ML20105B868)
- ML20105B876 + (ML20105B876)
- ML20105B877 + (ML20105B877)
- ML20105B879 + (ML20105B879)
- ML20105B882 + (ML20105B882)
- ML20105B883 + (ML20105B883)
- ML20105B886 + (ML20105B886)
- ML20105B888 + (ML20105B888)
- ML20105B891 + (ML20105B891)
- ML20105B894 + (ML20105B894)
- ML20105B895 + (ML20105B895)
- ML20105B897 + (ML20105B897)
- ML20105B899 + (ML20105B899)