Revised Units Shutdowns & Power Reductions Sheet for May 1992 Monthly Operating Rept for SONGS Unit 3
ML20105B886
Person / Time
Site: San Onofre  Southern California Edison icon.png
Issue date: 05/31/1992
From: Darling J
SOUTHERN CALIFORNIA EDISON CO.
To:
Shared Package
ML20105B707 List:
References
NUDOCS 9209210266
Download: ML20105B886 (1)


Text

_ _ _ _ _ _ _ _ _ _ - _ _ - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

i

~

, ?

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET 940: 50-362 I

UNIT EtAME: SONGS - 3 REPORT MON 1H:

May 1992 DATE:

9-15-92

. i C)MPLETED BY:

1. L. Darling i

TELEPHONE:

(714) 368-6223

[

Method o' Shutting Cause & Corrective

[

Duration Down LER System Ccmpenent Action to l

2 3

No.

Date Type *

(Hours)

Reason Reactor No.

Code' Code' Prevent Recurrence i

65-920419

  • F 108.98 A

1 NA AS BAF Continued from previous month's c

outage.

i S

120.62 B

1 NA TA TRB Resumed turbine balancing from

[

previous month.

l I '66

  • 920515 F

101.60 A

3 3-92-003 AB CAP See note below.

[

Note:

On May 15, at 1006, with Unit 3 at 100% reactor power, RCP P003 tripped on neutral ground overcurrent. This

}

caused a reactor trip signal to be generated. A short circuit failure of the RCP P003 motor phsse "C" surge 4

protection capacitor occurs ad due to long term vibration-induced abrasion damage to the mylar plastic l

insulation within the capacitor assembly. The surge capacitors for all four Unit 3 RCPs were replaced with l

in-kind parts and the surge capacitors for the Unit 2 RCPs will be replaced during the next outage of

[

sufficient duration. The RCP motor preventative maintenance program will be modified to include an i

appropriate periodic examination, including testing, of the surge capacitors. Periodic replacement of the L

capacitors will be required as appropriate.

' Data corrected since previous submittal.

i 1

i k

2 2

3 j

F-Forced Reason:

Method:

'IEEE Std 805-1984 l

3 5-Scheduled A-Equipment Failure (Explain) 1-Manual l

j.

B-Maintenance or Test 2-Manual Scrac.

'IEEE Std 8034-1983 l

C-Refueling 3-Automatic Scram.

D-Regulatory Restriction 4-Continuation from f

E-Operator Training & License Examination Previaus Month F-Administrative 5-Reduction in the Average G-Operational Error (Explain)

Daily Power Level of more H-Other (Explain) than 20t from the previous day 3

6-Other (Explain) j mor.aug/18 9209210266 920915 PDR ADOCK EP:Ropyyt