UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET 940: 50-362 I
UNIT EtAME: SONGS - 3 REPORT MON 1H:
May 1992 DATE:
9-15-92
. i C)MPLETED BY:
- 1. L. Darling i
TELEPHONE:
(714) 368-6223
[
Method o' Shutting Cause & Corrective
[
Duration Down LER System Ccmpenent Action to l
2 3
No.
Date Type *
(Hours)
Reason Reactor No.
Code' Code' Prevent Recurrence i
65-920419
- F 108.98 A
1 NA AS BAF Continued from previous month's c
outage.
i S
120.62 B
1 NA TA TRB Resumed turbine balancing from
[
previous month.
l I '66
- 920515 F
101.60 A
3 3-92-003 AB CAP See note below.
[
Note:
On May 15, at 1006, with Unit 3 at 100% reactor power, RCP P003 tripped on neutral ground overcurrent. This
}
caused a reactor trip signal to be generated. A short circuit failure of the RCP P003 motor phsse "C" surge 4
protection capacitor occurs ad due to long term vibration-induced abrasion damage to the mylar plastic l
insulation within the capacitor assembly. The surge capacitors for all four Unit 3 RCPs were replaced with l
in-kind parts and the surge capacitors for the Unit 2 RCPs will be replaced during the next outage of
[
sufficient duration. The RCP motor preventative maintenance program will be modified to include an i
appropriate periodic examination, including testing, of the surge capacitors. Periodic replacement of the L
capacitors will be required as appropriate.
' Data corrected since previous submittal.
i 1
i k
2 2
3 j
F-Forced Reason:
Method:
3 5-Scheduled A-Equipment Failure (Explain) 1-Manual l
j.
B-Maintenance or Test 2-Manual Scrac.
C-Refueling 3-Automatic Scram.
D-Regulatory Restriction 4-Continuation from f
E-Operator Training & License Examination Previaus Month F-Administrative 5-Reduction in the Average G-Operational Error (Explain)
Daily Power Level of more H-Other (Explain) than 20t from the previous day 3
6-Other (Explain) j mor.aug/18 9209210266 920915 PDR ADOCK EP:Ropyyt
_ _...,, __.