OPERATING DATA REPORT DOCKET NO.
50-364 DATE l -' 7 -M COMPLETED BY J.D. Woodard TELEPHONE (205) 899-5156 s
OPERATING STATUS
. I Unit Nam.
Joseph M. Farley - Unit 2 Notes December, 1984 O C& lathe data sir, e
- 2. rep rting Penod:
7-30-81, date of
- 3. Licensed Thermal Power (MWt):
?^97 commercial operation.
- 4. Nameplate Rating (Gross MWe):
860 829
- 5. Dengn Electncal Rating (Net MWe):
852.5
- 6. Maximum Dependable Capacity (Gross MWe):
- 7. Maxunum Dependable Capacity (Net MW4):
809 1 8.~ If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report. Give Reasons:
N/A 9.- Power Level To Which Restricted. If Any Net MWe):
N/A A
- 10. Reasons For Restrictions. If Any:
This Month Yr..to.Date Cudiulative
- 11. Hours In Reporting Period 744 8,784 30,025
- 12. Number Of Hours Reactor Was Critical 728.9
~8.375.7 9A ota s 0.0 0.0 138.0
- 13. Reactor Reserve Shutdown Hours
- 14. Hours Generator On.Line 716_p 8,279.3 26,578.I
- 15. Unit Reserve Shutdown Hours 0.0
.0.0 0.0
- 16. Gross Thermal Energy Generated (MWH) 1,771.677 21.sia 9na 66 Rs? 769 577,374 6.959.406' 21.946.282
- 17. Gross Electrical Energy Generated (MWH) 548,136 6,618,896 20.818,922'
- 18. Ne+ Electrical Energy Generated (MWH) 96*3 94.3 88.5
- 19. Unit Service Factor
- 20. Unit Availability Factor 96.3 94.3 88.5 91 I 9L1 RS 7
- 21. Unit Capacity Factor (Using MDC Net) 88.9 90.9 83,6
. 22. Unit Capacity Factor (Using DER Net)
- 23. Unit Forced Outage Rate
'4 ' 7 5.7 5.5
- _24. Shutdowns Scheduled Over Next 6 Months (Type. Date.and Duration of Eacht:
Refueling / maintenance outane I /4 /85. nnnrnvf me.h. s25 mo o tr o N/A
-25. If Shur Down At End Of Report Period. Estimated Date of Startup:
26.'. Units in Test Status iPrior to Commercial Operation):
Forecast Achieved r
05-06-81 05-08-81 INITIAL CRITICALITY ilNITIAL ELECTRICITY 05-24-R1 ns ?s ni
. COMMERCIAL OPERATION 08-01-81 07-30-81g NoMh q
__.._.__,_u..__._.__.___.._
^
-[.
JOSEPH M. FARLEY NUCLEAR PLANT UNIT 2 KARRATIVE
SUMMARY
OF OPERATIONS DECEMBER E uring the month of December, there was one (1) manually initiated D
automatic shutdown _which occurred on 12-20-84.
A significant power reduction occurred on 12-8-84.
Power was reduced to approximately 34% of rated thermal power to facilitate a containment entry to repair
. a level control valve on the letdown line.
The following major safety-related maintenance was performed in the month of December:
1.
Performed miscellaneous corrective and preventive maintenance.
on diesel generators.
'2.
Repaired LCV-460, a level control valve on the letdown line.
4 5y l --. --
... - ~ -
DOCKET NO.
50-364 UNIT 2
1-7-85 DATI i
COMPLETED BY J. D. Woodard TELEPHONE
(?ns3 goo _siss s
3IONTl!
Decernbe r.
1984 DAY.
' AVERAGE DAILY FOWER !.EVEi DAY AVERAGE DAILY POWER !.EVEL plwe-Net)
(SIWE Net) 833 825 g,
g.7 U9 2
Jg 828 823 3
832
[9 840 4
gg 659 0
836 3
21 838 311
-6 g
840 7
23 574 823 24
- A16 8
824 9
315 gg-10 26 829 828
[,
lg 7
825' 32 828-g 822 824 l
13
- 9 825 I4 30 815 15 826 33 825
- 16'
- INSTRUCriONS -
f On this form::. list the. 2ve:1p daily unit powe !cvelin MWe Net for each d:y in the reporting month. Campute tu
, the neare:t whole mepwatt.
l l
(9p7) 0
~
,_e
._. - ~~,
,-_f.~3,
,-.,,,-9,,,_y.,,,,.y
,.., - -..,,m,%.w_-p_-,,_.w.w.y
,,,,,..,w,,,_,,,m.,y_.gm,
,y..,
r_.
Y&
m
\\-
.~
i
~
....t
+:
UNIT SilU1 DOWNS ANI) POWER REpijCHONS IM)CKET NO. 50 '464 i
UNIT NAME T
M n r1ov - Unit 2 DA1E l-7-85 REIN)RT hlONill December COntPLETEli sY
_J.D. Woodard TEl.El*llONE (205) 899-5156
%E y
c c.
S k
3gg Lkensee gv,,
gg c,,,, g p,,,,,,,,,
~
$I N. i.
04:e K
Evens U
-Sja:
f.3 3
Acti.usto O *@
5Mh
- E'"I #
y PitvculHecusssance 6
i 008 841208 F
0 A
4 N/A CB LCV Pressuriser level transmitter spiked low causing letdown LCV to isolate.
i Valve failed to reopen and reactor power was reduced to facilitate con-tainment entry to rdpair valve, 009 841220 F
27.2 A
2 84-016-00 SD M
Unit manually tripped upon loss of l
both steam generator feed pumps on low suction pressure. Occurred when 2A condensate pump was started to main-tain fe'ed pump suction pressure.during a transient, but was secured due to high bearing temperature.
i I
2 3
4 F: l'os cd Reas.ni:
Method:
Exhit,it G - lasisucci.ms S: S*heiluted A-l'aluipment Failuse (Explain) 1 Manual fos Pscrasasiini of pasa H Maintenmce e,iTest 2 Manual Scsam.
Esissy Sheets (os I kesisce C Rcfucting 3 Automatic Scsam.
Ercus Repius (I.ER) File INUHl:C.-
4 D Hegulatiny Reuskiiosi 4 Othes (Emplain) 0861) 1 Opcianos Tsaining & licenu: Examinaison IL Adminosisalive 5
G Opciais.uial 1:s sies (0 aplain) 1%Iolais ! Same Sousee (9/17) li ushes (E mplain)
Z I
4,
__(
Maihng Addross Alatama Power Company 600 Ncrth 18tn Street Post Office Box 2641 Berrmngham. Alabama 35291 Telepnene 205 783-6090 R. P. Mcdonald b
sen.or vice President unir.eae seno AlabamaPower January 8,1985 9
Docket No. 50-364 Director, Office of Resource Management U. S. Nuclear Regulatory Commission Washington, D.C.
20555
Dear Sir:
RE: Joseph M. Farley Nuclear Plant Unit 2 Monthly Operating Data Report Attached are two (2) copies of the December 1984 Monthly Operating Report for Joseph M. Farley Nuclear Plant, Unit 2, reouired by Section 6.9.1.10 of Appendix A of the Technical Specifications. As renuested by letter from Mr. John F. Stolz to Mr. Alan R. Rarton, dated October 21, 1977, a " Narrative Summary of Operating Experience" is included in the attached report.
If you have any ouestions, please advise.
l Yours ve t
J. y, l
0 } ~ r&,.&
da i
~
R. P. Mcdonald RPM /KWM: sam Enclosures xc: Director, IE (10 copies)
Director, RII (1 copy)
Y h
bc:
Mr. J. M. Farley Mr. W. O. Whitt Mr. R. P. Mcdonald Mr. H. O. Thrash Mr. W. G. Hairston, III Mr. L. S. Williams Mr. J. D. Woodard Mr. A. E. Hammett Mr. M. L. Stoltz Ms. S. N. Knight Mr. J. M. Elliott Mr. J. R. Crane Mr. B. E. Hunt Mr. L. B. Long Mr. N. M. Horsley Ms. Sylvia Schoel Mr. J. C. Miller Mr. Jim Brantley Mr. Mike Galle INPO Records Center ANI Library File: