ML20105B876

From kanterella
Jump to navigation Jump to search
Forwards Monthly Operating Repts for Aug 1992 for SONGS, Units 2 & 3 & Revised Unit 3 Unit Shutdowns & Power Reductions Sheets for Apr,May & Jul 1992 MORs & Revised Unit 3 Summary of Operating Experience Sheet for Apr 1992
ML20105B876
Person / Time
Site: San Onofre  Southern California Edison icon.png
Issue date: 09/15/1992
From: Marsh W
SOUTHERN CALIFORNIA EDISON CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20105B707 List:
References
NUDOCS 9209210258
Download: ML20105B876 (3)


Text

-

't 4

=

Southern California Edison Company 23 PA84KE R ST REET s Fs 'IP40, CAL IFORN6 A 927' t)

W AM E R C M ms.,

September 15, 1992 u, r ~,om AL.4 S I AN1 MA*4 Auf T4

( 71 di 4 54 44D 3 M.)Cc h A9 6*( GtX AT O(4v A6 Ava 7 U. S. Nuclear Regulatory Commission Document Control Desk Washington, D.C.

20555

Subject:

Docket Nos. 50-361 and 50-362 Monthly Operating Reports for August 1992 San Onofre Nuclear Generating Station, Units 2 and 3 Technical Specification 6.9.1.10 to facility Operating Licenses NPF-10 and NPF-15 for the San Onofre Nuclear Generating Station, Units 2 and 3 respectively, requires SCE provide a Monthly 09erating Repart for each Unit, which includes: routine operating statistics and shutdown experience; all challenges to safety valves; any changes to the Offsite Do e Calculation Manual (0DCM); and any major changes to the radioactive waste treatment system. All covered activities are reported monthly, except for ODCM changes, which are reported within 90 days from the time the changes were made effective.

This letter transmits the August 1992 Monthly Operating Reports for Units 2 and 3, respectively. There were no challenges to safety valves, no changes to the ODCM, and no major changes to the Units 2 and 3 radioactive waste treatment tystems during the reporting period.

Attachment A to the enclosure provides revised Unit 3 " Unit Shutdowns and Power Reductions" sheets for the April, May, and July 1992 Monthly Operating Reports to correct the number'of unit shutdowns that occurred in April 1992 and.to revise accordingly, the sequential shutdown numbe. for subsequent unit shutdowns.

Attachment B to the enclosure provides a revised Unit 3 " Summary of Operating Experier.cc for the Month" sheet for the April 1992 Monthly Operating Report to correct a typographical error.

If you require any additional information, please let me knaw.

/ery truly yours, Y

hV Enclosures J. B. Martin (Regional Administrator, USNRC Region V) cc:

M. B. Fields (NRC Project Manager, Units 2 and 3)

C. W. Caldwell (USNRC Senior Resident Inspector, Units 1, 2 and 3) 9209210258 920915 PDR ADOCK 05000361 R

PDR

(, J. U U r. (

((M lji

e si f

1 i

i-7 t

N s

4 4

1 1

k I

r 4

i t

b

+

i 1

1 i

ATTACHMENT A i

j Revised Unit -3 April, May, June, and July 1992 i

Unit Shutdowns and Power Reductions SONGS Unit 2 and 3 Monthly Operating Report, August 1992 4

1 l

i e

i t

i

-u s

f a

i s

d Y

4 9

R mor.aug/16-i i

e 9

i 4

3.;

1

.i i

d

)

I g

t a

1 3

t

\\

l 4

4 i

i 1

l f

f E

6

-i 3

t i

h 4

1

?

ATTACHMENT B i.

1 j

Revised Unit 3 April 1992 j

i 8

{

Sumary of Operating Experience'for the Month l

l SONGS Unit 2 and 3 Honthly Operating Report,-August 1992

?

l t

i i

1 e

i i

i i

i s

h i

f j.

m i

t,

.h a

I i

i mor.aug/20 i

i -

,, -.