Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20101A038 + (ML20101A038)
- ML20101A040 + (ML20101A040)
- ML20101A042 + (ML20101A042)
- ML20101A043 + (ML20101A043)
- ML20101A046 + (ML20101A046)
- ML20101A053 + (ML20101A053)
- RBG-19557, Interim Deficiency Rept DR-239 Re Incorrect Wiring of Isolation Signal to Two Isolation Valves Supplied by GE for RHR Sys.Next Rept Will Be Submitted by 850221 + (ML20101A066)
- RBG-19558, Interim Deficiency Rept DR-237 Re Bore Size of Orifice Plates Supplied by Daniel Industries.Next Rept Will Be Submitted by 850213 + (ML20101A069)
- ML20101A070 + (ML20101A070)
- ML20101A071 + (ML20101A071)
- ML20101A072 + (ML20101A072)
- ML20101A073 + (ML20101A073)
- ML20101A074 + (ML20101A074)
- TXX-9217, Forwards Evaluation of Indication Discovered in Nozzle to Channel Head Weld on Tube Side Outlet Nozzle of RHR HX (TBX-RHAHRS-01) During First Refueling Outage ASME Section XI ISI Exam.Weld Will Be Reexam During Next Insp Period + (ML20101A078)
- PY-CEI-NRR-1469, Advises That Util Implemented Executive Reorganization on 920301.RJ Farling Appointed to Suceed RA Miller as Current President & Chief Operating Officer.Fj Lange Appointed to Position of Senior vice-president Legal & Corporate Affair + (ML20101A081)
- 1CAN049205, Withdraws 920313 Request for Approval to Use Alternative to Requirements of 10CFR50.55a (Codes & Stds) to Install Welded Plug Utilizing Automatic Welding Process + (ML20101A086)
- L-84-363, Responds to NRC Re Violations Noted in Insp Repts 50-335/84-30 & 50-389/84-36.Corrective Actions Withheld + (ML20101A092)
- ML20101A097 + (ML20101A097)
- BECO-92-044, Forwards Rev to 910226 Response to Suppl 3 to Generic Ltr 89-10 Per motor-operated Valve Insp Conducted on 920309-11. Valve Will Operate Under Design Basis Conditions,Based on Review of Inel Test Results + (ML20101A099)
- ML20101A104 + (ML20101A104)
- ML20101A107 + (ML20101A107)
- ML20101A114 + (ML20101A114)
- ML20101A116 + (ML20101A116)
- ML20101A122 + (ML20101A122)
- ML20101A123 + (ML20101A123)
- ML20101A128 + (ML20101A128)
- ML20101A130 + (ML20101A130)
- ML20101A133 + (ML20101A133)
- ML20101A134 + (ML20101A134)
- ML20101A135 + (ML20101A135)
- W3P84-3496, Advises That Review of Files Requested for Release Under FOIA Completed.No Documents to Be Withheld (Ref 10CFR2.790) Assuming NRC Will Delete Info That Would Be Invasion of Personal Privacy + (ML20101A144)
- ML20101A146 + (ML20101A146)
- ML20101A150 + (ML20101A150)
- ML20101A151 + (ML20101A151)
- ML20101A156 + (ML20101A156)
- ML20101A165 + (ML20101A165)
- ML20101A170 + (ML20101A170)
- ML20101A177 + (ML20101A177)
- W3P84-3491, Forwards Summary Rept on Operability of Shutdown Cooling Sys Relief Valves for Waterford Unit 3, in Response to 841109 Discussion Re Valve Reliability + (ML20101A186)
- ML20101A192 + (ML20101A192)
- 05000370/LER-1996-001-03, :on 960208,unit 2 RWST Level Instrumentation Inoperable Due to Cold Water Condition.Caused by Insufficient Monitoring.Fw Level Transmitter Panel Will Be Verified + (ML20101A197)
- 3F0396-06, Monthly Operating Rept for Feb 1996 for Crystal River Unit 3 + (ML20101A207)
- ML20101A208 + (ML20101A208)
- ML20101A214 + (ML20101A214)
- ML20101A219 + (ML20101A219)
- ML20101A222 + (ML20101A222)
- ML20101A226 + (ML20101A226)
- ML20101A229 + (ML20101A229)
- ML20101A236 + (ML20101A236)
- ML20101A242 + (ML20101A242)
- W3P84-3506, Advises of Commitment to Have Operable Toxic Gas Detection Sys Indicating Presence of Toxic Gases at Control Room Air Intakes by 850701,per Sser 6 + (ML20101A244)