Forwards Rev 1 to TS Change Request 193 to License DPR-50, Revising Inservice Insp Program for once-through SG Tubes & Deleting Ref to Temporary Change to License Condition 2(c)(8)(2) to Increase primary-to-secondary Leak Rate
ML20101A122
Person / Time
Site: Crane Constellation icon.png
Issue date: 04/13/1992
From: Broughton T
GENERAL PUBLIC UTILITIES CORP.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20101A125 List:
References
C311-92-2022, NUDOCS 9204200227
Download: ML20101A122 (2)


Text

- _ _ - _ - _ _ _ -

L' GPU Nuclear Corporation D,1D hsMClear

s',c9';rstm "

d e

Middletown, Pennsylvania 17057 0191 717 944 7621 TELEX 84 2385 Writer's Direct Dial Number:

(717) 948-8005 April 13, 1592 C311-92-2022 U. S. Nuclear Regulatary Commission Attn: Document Control Desk Washington, DC 20555

Dear Sir:

Subject:

Three Mile Island Nuclear Station, Unit 1 (TMI-1)

Operating License No. DPR-50 Docket No. 50-289 Technical Specification Change Request No.193, Revision 1, and Response to NRC Comments in accordance with 10 CFR 50.4(b)(1), Technical Specification Change Request (TSCR) No.193, Revision No.1 is forwarded for your approval.

Additionally, a response to NRC comments on the original TSCR 193, provided via NP.C letter dated March 20, 1991, is enclosed.

TSCR 193, Revision 1 incorporates changes requested by the NRC in the above referenced comment letter and accepted by GPU Nuclear.

Also enclosed is one signed copy of the Certificate of Service for this request to the chief executives of the township and county in which the facility is located, as well as the Commonwealth of Pennsylvania, Bureau of Radiation Protection.

Pursuant to 10 CFR 50.91(a)(1), enclosed is an analyses in support of a determination of no significant hazards considerations.

Pursuant to

'O CFR 50.91(b), a copy of this letter, the proposed change in Technical Specifications, the response to the NRC comments, and the no significant hazards considerations analysis have been provided to Mr. William P. Dornsife, the designated representative of the Commonwealth of Pennsylvania.

0\\

0 9204200227 920413 Dh ADOCK 05000289 I

I\\

PDR l

GPU Numear Corporahon is a subud.aq o! General Puboc L!!i d es Comoration

C311-92-2022 Page 2 NRC approval is requested by December 31, 1992 so that the requested change may be implemanted during the plant refueling cycle 10R beginning in September 1993. Otherwise, implementatiors will be scheduled t'aring plant refueling cycle llR.

Sincerely, Si'3h lA T. G. Broughton Vice President and Director, TMI-l EP/ pip

Enclosures:

1) TSCR No. 193, Revision No. 1
2) Certificate of Service for TSCR 193, Revision No. 1
3) Response to NRC Comments Related to TSCR No. 193 cc: Administrator, Region 1 TM1 Senior Resident inspector TMI-l Senior Project Manager

\\$

_ _ _ - _ _