Forwards Amend 9 to Updated Fsar,Reflecting as-constructed Condition of Plant as of 911015.W/o Encl
ML20101A040
Person / Time
Site: Sequoyah  Tennessee Valley Authority icon.png
Issue date: 04/14/1992
From: Joshua Wilson
TENNESSEE VALLEY AUTHORITY
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 9204200013
Download: ML20101A040 (2)


Text

_..... _ _. _..__ ___._. _ _

e.

3 I

(^h;.

I N

t c a w,.

,er o

c4a April 14, 1992 I

U.S. Nuclear Regulatory Commission ATTN Document Control Desk Washington, D.C. 20555 Centlement in the Matter of

)

Docket Nos. 50-327 Tennessee Valley Authority

)

50-328 SEQUOYAll NUCLE /R PLANT (SQN) - UPDATED FINAL SAFETY ANALYSIS REPORT (UFSAR), AMENDMENT 9 As required by 10 CFR 50.71, I am providing you ten copies of Amendment 9 of the SQN UFSAR. This amendment is intended to reflect the as-constructed condition of the plant as of October 15, 1991.

Accordingly, plant modifications-associated with SQN's Unit 1 Cycle 5 refueling outage, which began October 5 and ended December 20, 1991, are not included in Amendment 9.

The changes reflected by Amendment 9 are the result of modifications to the facility and procedure changes.

Organization chang a and descriptions are now being submitted to you under TVA's Nuclear Power Organization Topical Report (TVA-NPODS9-A). Consequently, Section 13.1

-of SQN's UFSAR has been revised to reference TVA's organization topical report.

Please direct questions concerning this issue to D. V. Goodin at (615) 843-7734.

I certify that I am a duly authorized officer of TVA and that, to the best of my knowledge and belief, the information contained herein

$a 4

I

,,e.eeee,e,=eA s PDR ADOCK e5eO 7

K

--y e-w-evww--,y,--,-w-r-=--

me.en

-e-v e.res-t-ve n.s m tr--e--

- re e n, 4-.

,-t*Cn v p,warw~wi-r w ar e re-e as

-w~t-g w<

m

-5m.--

ia e =-*

s e-

=

w e w its e +,--tr--rm+r+see-*

n.

i U.S. Nuclear kegulatory Commission Page 2 April 14 1992 accurately presents changes made since the previous submittal, necessary to reflect intornation ar.d analyses submitted to the Comrnission or prepared pursuant to Connission requirement.

Sincerely, jf&

3 *%%.

L. Wilson Enclosures cc (Enclosures):

Mr. D. E. LaBarge, Project Manager U.S. Nuclear Reg.ilatory Cocnission One White Flint, North 11555 Rockville Pike Rockville, Maryland 20852 NRC Resident Inspector Sequoyah Nuclear Plant 2600 Igou Ferry Road Soddy Daisy, Tennessee 37379 Mr, B. A. Wilson, Project Cblef U.S. Nuclear Regulatory Commission Region 11 101 Marietta Street, NW, Suite 2900 Atlanta, Georgia 30323

-