Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20095C145 + (ML20095C145)
- ML20095C148 + (ML20095C148)
- L-95-029, Monthly Operating Repts for Nov 1995 for Point Beach Nuclear Plant Units 1 & 2 + (ML20095C156)
- ML20095C159 + (ML20095C159)
- JAFP-95-0535, Monthly Operating Rept for Nov 1995 for Jafnpp + (ML20095C166)
- ML20095C168 + (ML20095C168)
- ML20095C169 + (ML20095C169)
- NRC-95-4602, Forwards Nonproprietary & Proprietary Responses to NRC RAIs on AP600 Design Certification Test Program,Notrump Computer Code & Wgothic Computer Code.Proprietary Responses Withheld (Ref 10CFR2.790) + (ML20095C176)
- ML20095C179 + (ML20095C179)
- ML20095C180 + (ML20095C180)
- TXX-4201, Forwards Responses to 840518 & 23 Ltrs Re 60 Allegations Concerning Protective Coating Practices at Facility. Responses Based on Technical Knowledge & Review of Existing Documentation.Supporting Documentation Encl + (ML20095C187)
- HL-5082, Special Rept I-95-003:on 951117,fire Door 1L-48-1C50 Remained Inoperable for Longer than 14 Days.Caused by Component Failure Resulting from High Usage.Appropriate Fire Detectors Verified + (ML20095C188)
- ML20095C191 + (ML20095C191)
- ML20095C195 + (ML20095C195)
- ML20095C196 + (ML20095C196)
- HL-5080, Forwards Response to Violations Noted in Insp Rept 50-366/95-21.Corrective Actions:Calibr Blocks Painted Using Paint Used on Surface to Be Examed + (ML20095C197)
- ML20095C199 + (ML20095C199)
- ML20095C212 + (ML20095C212)
- U-601948, 1991 Annual Radiological Environ Monitoring Rept + (ML20095C219)
- ML20095C225 + (ML20095C225)
- 2CAN129501, Forwards ANO Unit 2 Simulator Performance Testing Rept. Discrepancies Identified During Initial Simulator Performance Test Corrected in Accordance W/Simulator Mod Control Guideline Included in Section 1 of Encl Rept + (ML20095C227)
- PLA-2640, Comment on Proposed Rules 10CFR2,19,20,30,31,32,34,35,39,40, 50,61 & 70 Re Stds for Protection Against Radiation + (ML20095C232)
- ML20095C243 + (ML20095C243)
- 05000461/LER-1992-005, :on 920320,failure to Maintain Containment Instrument Air Isolation Valve Operable Occurred Per TS 3/4.6.4.Caused by Inadequate Procedure.Tech Spec Requirements Reviewed & Revised + (ML20095C256)
- ML20095C295 + (ML20095C295)
- ML20095C299 + (ML20095C299)
- ML20095C308 + (ML20095C308)
- ML20095C324 + (ML20095C324)
- ML20095C329 + (ML20095C329)
- ML20095C341 + (ML20095C341)
- 05000315/LER-1984-014-01, :on 840716,nonlicensed Operator Mistakenly Isolated North Low Head Safety Injection Pump.Caused by Personnel Error.Procedure Revised + (ML20095C354)
- 05000366/LER-1984-006-01, :on 840716,control Rod Hoist Operation Performed W/O Demonstration Operation of Hoist Interlock.All Hoist Use Suspended.Procedure Revised + (ML20095C355)
- ML20095C361 + (ML20095C361)
- RBG-42259, Special Rept:On 951109,EDG Unit Tripped on Invalid High Lube Oil.Failure Determined to Be Isolated Failure & Switch Replaced + (ML20095C365)
- ML20095C366 + (ML20095C366)
- ML20095C372 + (ML20095C372)
- ML20095C381 + (ML20095C381)
- RBG-18371, Corrected Final Deficiency Rept DR-139 Re Potentially Defective Springs in Pacific Scientific PSA-1 & PSA-3 Mechanical Shock Arrestors.Snubbers Rotated & Requalified by Vendor.Condition Not Reportable Under 10CFR50.55(e) + (ML20095C383)
- RBG-18559, Interim Deficiency Rept DR-168 Re Interpretation of W3 Welding Procedure.Next Rept Will Be Submitted by 841018 + (ML20095C385)
- RBG-18527, Interim Deficiency Rept DR-218 Re Piston Rods in Brown Boveri Electric Type 5HK Circuit Breakers.Next Rept Will Be Submitted by 841024 + (ML20095C387)
- ML20095C389 + (ML20095C389)
- ML20095C393 + (ML20095C393)
- ML20095C410 + (ML20095C410)
- DCL-95-264, Forwards Change 6 to Rev 18 to Physical Security Plan.Encl Withheld (Ref 10CFR73.55(d)(5)) + (ML20095C413)
- 3F1295-02, Monthly Operating Rept for Nov 1995 for Crystal River Unit 3 + (ML20095C415)
- BVY-95-131, Monthly Operating Rept for Nov 1995 for Vermont Yankee Nuclear Power Station + (ML20095C417)
- U-602529, Monthly Operating Rept for Nov 1995 for Clinton Power Station + (ML20095C424)
- ML20095C425 + (ML20095C425)
- ML20095C433 + (ML20095C433)
- 05000348/LER-1995-011, :on 951114,unplanned Manual Actuation of ESF Occurred Due to Personnel Error.Coached Personnel Re Simulation of Activities Associated W/Emergency Drills.W/ + (ML20095C442)
- ML20095C469 + (ML20095C469)