Public Version of Revised Emergency Plan Implementing Procedures,Including EP-105, General Emergency Response & EP-304, Partial Plant Evacuation
ML20095C372
Person / Time
Site: Limerick  Constellation icon.png
Issue date: 08/07/1984
From:
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
To:
Shared Package
ML20095C363 List:
References
PROC-840807-01, NUDOCS 8408220501
Download: ML20095C372 (25)


Text

- l 3842102760 EP_105, aty. 3 I Paga 1 of 17 VA' MPG /mla PHILADELPHIA ELECTRIC CCMPANY LIMERICK GENERATING STATION

  • EMERGENCY PLAN IMPLEMENTING PROCEDURE EP-105 GENERAL EMERGENCY RESPONSE 1.0 PURPOSE The purpose of this procedure is to provide guidelines for the site response to a General Emergency.

2.0 RESPONSIBILITIES 2.1 "-

Shift Supervision shall assume the role of Interim Emergency Director when a General Emergency occurs unless the Emergency Director is present and I performs the necessary steps ~in this procedure.

2.2 The Station Superintendent or alternate shall assume the role of the Emergency Director, report to the Technical Support Center or control room and relieve the Interim Emergency Director.

2.3

' The Site Emergency Coordinator shall report to the Emergency Operations Facility and perform the necessary steps in this procedure.

3.0 APPENDICES 3.1 EP-105-1 General Emergency Notification Message j 3.2 EP-105-2 Emergency Exposure Guidelines >l l

3.3 EP-105-3 General Emergency De-escalation ~

Notification Message I i

1 3.4 EP-105-4 General Emergency Phone List l (Initial Notification) il

' ll I 3.5 EP-105-5 General Emergency Phone,. I ist.m n - pg i

j l

(Escalation or De Qsda,lation), .' ? y=g; , 3 {,

_i

(; y., :'t_; -

. u:

sh :e ;

., w r%  :. 1- ' ':

h y. r ' f. -

y

e. .. b f:- r

> s

,V a 7',*,- .

i. -l

. v f I e40s220 sol e4oso7 PDR ADOCK 05oo0352

'I id " '

F pop

,:l

- EP-105, Rev. 3-

. l Page 2 of 17 VAW/ MPG /mla 4.0 PREREQUISITES -

-1 4.1 EP-101 Classification of Emergencies,' completed 5.0 SPECIAL EQUIPMENT

. None 6.0 SYMPTCMS None s 7.0 ACTION LEVEL 7.1 This procedure shall be implemented when an event .

occurs that is classified as a General Emergency per EP-101 Classification of Emergencies.

, 8.0 PRECAUTIONS 8.1 Planned radiat an exposures should be limited to the administrative guide levels in Appendix EP-105-2, Emergency Exposure Guidelines.

9.0 PROCEDURE 9.1 ACTIONS 9.1.1 (Interim) Emergency Director shall:

9.1.1.1 verify the emergency classification as determined in EP-101, Classification of

' Emergencies unless determination has just been made.

l 9.1.1.2 Fill out Appendix EP-105-1, General

' Emergency Notification Message, and give it to the ccmmunicator.

M

r

. I' -

EP-105, Rsv. 3

'..* l- Pcgo 3 of 17 j- ,

VAW/ MPG /mla

! 9.1.1.3 Direct communicator to complete ,

notification of the appropria.te parties as specified in Appendix EP-105-4, I General Emergency Phone List (Initial l Notification) or Appendix EP-105-5, l General Emergency Phone List (Escalation I or De-escalation). The Communicator i shall man the NRC RED telephone on a I

l continuous basis until the NRC disconnects.

9.1.1.4 contact the Station Superintendent and the Shift Technical Advisor, inform them I of the situation, if not already done.

I 9.1.1.5 Implement EP-306, Evacuation of the Information Center, if not already done.

Inform the staf f of the vind direction, if there is an airborne release.

I 9.1.1.6 If there is a radiological release, =.

I implement EP-305, Site Evacuation.

I I

9 .' l .1. 7 If there has not been a radiological release, 1 A. Evacuate all construction per I

by contacting Bechtel Safety i

i Direct them to call for a "To Project Evacuation" in accordance I with Bechtel procedures.

I B. act Yoh Construc ' n Security I

I

'nd inform

. em t a ocaA Pr ect Evacuation i

of Bechtel Construction personnel is i being implemented.

l l

THIS WILL CALL FOR THE ASSEMBLY OF l

PERSONNEL AT THE' UPPER PARKING LOT AND POST #3. IF IT IS DESIRED THAT l THEY LEAVE THE SITE, INFORM SECHTEL l

COMMAND POSTS AT THE UPPER PARKING l LOT.

I I

C. Select the type of accountability desired for personnel in the I

protected area and implement the

! I required actions below:

l l

\

~,

  • I

~

l .

EP-105, Rav. 3 l' Pago 4 of 17 VAW/ MPG /mla I 1. Emergency Assembly Without -

I Accountability. .

I - Make the following announcement I

l "THIS (IS) (IS NOT) A DRILL.

DESIGNATED EMERGENCY PERSONNEL l

REPORT TO ASSIGNED EMERGENCY l RESPONSE FACILITIES. ALL OTHER l

PERSONNEL STAND BY FOR FURTHER l

l ANNOUNCEMENT. THIS (IS) (IS NOT)

A DRILL."

l 2. Emergency Assembly With 1 Accountability I a. Select Unit lL exit points as

) I follows:

1 Day Shift - TSC and l

Administration Building  %

i Afternoon Shift -

l Administration Building Night i

Shift - Administration l

Building. . . . . .

b. Contact the (Interim)

Security Team Leader. Inform him of the selected exit-point (s), that emergency assembly with accountability is going to be implementid, and to activate the Security Team (EP-208) and to perform personnel accountability in accordance with EP-110,

' Personnel Assembly-and Accountability.

I c. Contact Yoh Construction i Security and inform them that I

personnel leaving Unit I will I

be reassembling at the l

Personnel Processing Center I (PPC).

4W i

l .

l EP-105, R2v. 3

~

. ~ 'l - Page 5 of 17 VAW/ MPG /mle l "THIS (IS)-(IS NOT) A DRILL, - I l THIS (IS) (IS NOT) A DRILL.

I DESIGNATED EMERGENCY l PERSONNEL REPORT TO ASSIGNED ,

l EMERGENCY RESPONSE-1 FACILITIES. ALL OTHER l PERSONNEL LEAVE THE PROTECTED I AREA IMMEDIATELY THROUGH THE-l (NAME OF EXIT AREA OR AREAS) l AND REASSEMBLE AT THE I PERSONNEL PROCESSING CENTER. <

l THIS (IS) (IS NOT) A DRILL.

i l THIS (IS) (IS NOT) A DRILL."

9.1.1.8 If not already accomplished during an Alert or. Site Emergency Response I procedure, direct the Shift Clerk to activate the 60 minute call list using l EP-291, Staffing Augmentation. If Shift I Clerk is not available, this function may be assigned to any.available individual..  ; -

l 9.1.1.9 Direct the activation of the Technical Support Center in accordance with EP-201, Technical Support Center-(TSC)

Activation, if not already activated.

1 l 9.1.1.10 Direct activation of the Emergency Operations Facility in accordance-vith EP-203, Emergency Operations Facility (EOF) Activation, if not already activated.

I 9.1.1.11 If the EOF has not been activated earlier, during an Alert or Site Emergency Response procedure, direct a communicator to call EOF personnel (directing them to report to the EOF) using EP-279, EOF Group Phone List.

I 9.1.1.12 Assign an Operations Support Center j Coordinator (PO), if not already done, to 1

direct available personnel to report to  !

the Operations Support Center and to activate it in accordance with EP-202, Operations Support Center (OSC)

Activation. '

i

?

4 i

k a

__ .,, _ _ . ~ _ - - - _ _ , , - - - - - - - - --

---w -w- - ' - - - ' - - ' - " - " '

- ,I -

EP-105, Rsv. 3'

  • Pege-6 of 17

. ., VAW/ MPG /mla l 9.'l.1.13 For samoles, direct the Shift Chemistry -

Technician or Chemistry Sampling And

. Analysis. Team Leader to implement EP-230

. Chemistry Sampling And Analysis Team Activation.

9.1.1.14 For in-clant surveys, direct a Shift HP-Technician or Personnel Safety Team-Leader to implement EP-250, Personnel Safety Team Activation.

9.1.1.15 For field surveys when a release of gaseous radioactive material has occurred I or is suspected, direct Dose Assessment l Team Leader to implement EP-210, Dose l Assessment Team Activation.

, 9.1.1.16 For'a release at13r greater than the Alert level in EP-101, Classification of Emergencies, or at the' discretion of-the Emergency Director, direct the Dose =,

Assessment Team Leader to implement EP-210, Dose Assessment Team Activation. On an interim bases, direct the Shift Technical Advisor to perform dose proj ections using- EP-316, Cumulat.ive .

Population Dose Calculations for Airborne Releases-Manual Method or RMMS Computer and implement EP-317, Determination of Protective Action Recommendations.

l 9.1.1.17 For fire / damage recair direct the l Maintenance Shift Assistant Foreman or i Fire and Damage Team Leader to implement i EP-260, Fire and Damage Team Activation and/or EP-261 Damage Repair Group.

9.1.1.18 For a liquid release, implement EP-312, Radioactive Liquid Release, if required.

l 9.1.1.19 For Security matters, contact Security l Shift Supervision and direct I implementation of EP-208, Security Team i Activation, unless previously done.

)

e

.l ,

EP-105, Rsv. 3

- - I- Paga 7 of 17

. ,, VAW/ MPG /mla. ,

1 l

9.2 FOLLCW-UP , )

9.2.1 (Interim) Emergency Director shall:

^

9.2.1.1 Verify that the Technical Support Center, Emergency operations Facility and the

^ Operations Support Center have been activated.

9.2.1.2 Periodically evaluate the event

  • classification in accordance with EP-103, Classification of Emergencies. -If the conditions change, deescalate to an appropriate classification.

4 9.2.1.3 If classification i.s de-escalated, fill i

out Appendix EP-105-3, General Emergency De-escalation Notification Message, and give it to the communicator and direct the communicator to perform notification of the appropriate parties listed in .

I Appendix EP-105-5, General Emergency l

Phone List (Escalation or De-escalation).

9.2.1.4 Obtain the following information as necessary to formulate further actions:

A. Security Status from Security Team Leader B. Sample analysis from Shift Chemistry Technician or Chemistry Sampling and Analysis Team Leader C. In-plant surveys f rom Shif t HP Technician or Personnel Safety Team-Leader d

D. Field surveys from Shift EP '

i Technician or Dose Assessment Team Leader

  • E. Dose projections and protective action recommendations from Shift Technical Advisor or Dose Assessment Team Leader s

. , , 'l' .

EP-105, Rgv. 3 1 Pcgo 8 of 17 VAW/ MPG /mla i F. Fire / Damage Repair status from the -

1 Maintenance Shift' Assistant Foreman or_ Fire and Damage Team Leader G. Notification results from Communicator 9.2.1.5 Discuss protective action recommendations with the Site Emergency Coordinator.

9.2.~1.6 If not already performed, determine which additional support personnel are necessary for emergency functions and I direct the Shift Clerk or.other assigned J . person to contact those personnel.

I 9.2.1.7 Provide site personnel with public I address (PA) speaker announcements for any major changes in plant emergency status, such as changing emergency action levels. .

9.2.1.8 Evaluate the need and order evacuation of effected areas as necessary.

Refer to the following procedures:

EP-303 Local Evacuation EP-305 Site Evacuation EP 306 Evacuation cf the Information Center 9.2.1.9 Perform the following until relieved by the Site Emergency. Coordinator:

A. Discuss protective action I recommendations with the Dose l Assessment Team Leader.

B. Provide protective action recommendations to the Pennsylvania Bureau of Radiation Protection.

C. Inform the various emergency response  :

groups if the recovery phase '

organization is to be implemented. -

I A '

i

l 6 L I EP-105, Rav. 3

. I- Pago 9 of 17 VAW/ MPG /mla 9.2.2 The Communicator shall: .

i

[L , 9.2.2.1 Inform the Emergency Director. when appropriate notifications have been made.

t-and submit completed copy of Appendix EP-105-4 General Emergency Phone List l- (Initial Notification) or Appendix EP-l 105-5 (Escalation or De-escalation) for Emergency Director's signature.

10.0 REFERENCES

10.1 Limerick Generating Station Emergency Plan 10.2 NUREG 0654, Criteria for Preparation and Evaluation of Radiological Emergency Response Plans in Support of Nuclear Power Plants 10.3 EP-101 Classification of Emergencies =,

10.4 EP-201 Technical Support Center (TSC) Activation l 10.5 EP-202 Operations Support Center (OSC) Activation

___ 10.6 EP-203 Emergency Operation's Facility (EOF)

Activation 10.7 EP-291 Staffing Augmentation 10.8 -EP-305 Site Evacuation 10.9 EP-306 Evacuation of the Information Center 10.10 EP-317 Determination of Protective Action Recommendations 10.11 EP-316 Cumulative Population Dose Calculations For Airborne Releases - Manual Method 10.12 EP-110 Personnel Assembly and Accountability 10.13 EP-208 Security Team Activation 10.14 EP-210 Dose Assessment Team Activation i 10.15 EP-230 Chemistry Sampling and Analysis Team Activation 10.16 EP-250 Personnel Safety Team Activation O

-- - - . , *'l '

--- EP-105,'Rev. 3--

- - l

  • Pago 10 of 17

' ' *i

. . VAW/ MPG /mla

~l 10.17 EP-260 Fire and Damage Team Activation ~

I' 10.18 EP-261. Damage Repair Group I - 10.19 EP-312 Radioactive Liquid Release i 10.20- EP-279 Emergency Operations Facility (EOF) Group l -Phone List' S

f 4

9

+ , e g- r -g - -,

e-- - , e , .~-w -, e

I EP-105 Rev. 3 Page 11 of 17 VAW/ MPG /mla APPENDIX EP-105-1 GENERAL EMERGENCY NOTIFICATION MESSAGE MESSAGE: This (is)(is rot) a drill. This (is)(is not) a drill'.

l This is the Limerick Generating Station calling to report a General l Emergency. 'My name is , telephone

! . Limerick Generating Station is reporting a General l Emergency declared at Unit No. . Time and date of General l Emergency classification are I , .

l (24 Mr Clock Time) (Date) l The basic problem is .

I There (has been) (has not been) an (airborne) (liquid) radioactive ~

l release from the plant. The plant status is (stable) (improving) l (degrading) (not known). The protective action recommended is I.* . The affected area is . This I (is) (is not) a drill. This (is) (is not) a drill.

If a General Emergency has been declared without prior emergency classification provide.the recommendation to shelter within the 2 mile radius and 5 miles downwind of the plant. If PEMA & BRP are not available, make the recommendation directly to the counties.

4 .

4 m

1

__ _ _. __ ___ , ,_ _ . . _ _ ~_ _ . _ _ _ _ ~_

'i

+

r- -

)

. *- EP-105 Rsv. 3 i

.I

, Page 12 of 17 VAW/ MPG /mla APPENDIX EP-105-2 EMERGENCY EXPCSURE GUIDELINES

  • Projected Whole Body Thyroid Authorized Function Dose Dose By
1. Life Saving and (Interim)

Reduction of Injury 75 REM

  • 375 REM Emergency **

Director

2. Operation of Equipment to Mitigate an (Interim)

Emergency 25 REM

  • 125 REM Emergency **

Director

3. Protection of Health (Interim) and Safety of the Public 5 REM 25 REM Emergency ** ,

Director -

4. Other Emergency 10 CFR 20 10 CFR 20 (Interim)

Activities limits limits Emergency Director

5. Re-entry / Recovery Station Station Activities Administra- Adminis-tive Guide- trative lines Guide lines N/A

Reference:

EPA-520/1-75-001 Table 2.1

    • Such exposure shall be on a voluntary basis l

1 4

D

. . l

.' s .

FP-105 Rav. 3 l Page 13 of 17 l

VAW/ MPG /mla APPENDIX EP-105-3 GENERAL EMERGENCY DE-ESCALATION NOTIFICATION MESSAGE Message: This (is) (is not) a drill. This (is) (is not) a drill. This is Limerick Generating Station calling to report a change in emergency action level. The General Emergency has been (de-escalated to) (An Unusual Event) (An Alert) (An Site Emergency) (Terminated). Time and date are

, . The plant status is (stable)

(24 Mr Clock Time) (Date)

(improving). My name is .

This (is) (is not) a drill. This (is) (is not) a drill.

h i

>+

t - , -, ., , _ , , . , . -

l l ~ , ' .,

I EP-105, Rey,3.

Page 14, o f 17 VAW/ MPG /rgs 1 APPENDIX EP-105-3 l GENERAL. EMERGENCY PilONE LIST

~

! Ti ime initiated (INITIAL NOTIFICATION) l hy g.puie l / Agency To Be Not i fied Phone Number Time Person Responding l a. l..uergency Director llome

i. . H. Leitch Offic i

i i Ait.ernate llome l .1 . P. Franz Offict

l. aund Dispatcher Offic l

l l c. thentgomery County Emergency l llan ement A enc

d. Pennsylvania Emergency Ha ement A en
e. Pennsylvania Bureau of -

Radiation Protection ,

lla r r isbu rg PA l f. Manager - Public Information Ronald liar r

g. Di rector - Emergency llome Preparedness Office Roberta Kankus ...

7 _ . . . _

l C' l

' I S

k

37s _ _

1 g _ _

.- . r ,

. .yf/

  • eoG P g R n 5

0eA 5M

,1 /

W i

d n

o 1 gV p

- a s '

PP e E R

  • n o .

s r

e P

e m

i T

T)

S N I O _

3E L I T

A hg-

- N C yg 5O I 0l i F e 1P I PY O EC N N

XE L T

b r

e m

u meg _-.

t D

/

a e

m I G A N DR I NE T EH P L' N I

e n u- R N' Q__

P o O I h T AL ( P C A E R R E I N D E

G Y C

N E

n e G o v R d s a E e nt e rh M i i c b e E f ae t s y i

mn t f e y

c )

t en s ai n M o r ro u c c e I N e c m dn n g R t ds ee e r E e n ni C t g g e T B e ad R ca r m N C N a/ ec E .I o

s tC tl mn ,(

T sR gr ne E y n aN no on t  :

y oD l it cn yA n y  :

c iM l ta o t u B y d n t li cr es nt o B e e a , lt ae br un C d t g t a an t p ed oe s e d ,

a A ed cu no ope Cm re t e i / ps o t f ec e l t l Oe se cd ei s ti l f i e h in e svt k a sv p i n n Ct ho ns eoon rn er m r I n Re th on i l ea h aj o e o ND p se ca i t M Cy C v e s ee r c n n .

m r kl ei eee -

i e .

ae PL gh e, . .

T P h Ht

  • At I i j l l

-  ?- JE; ,7

_ _f _s :e EI-  : <' r 5 [  : - .,

EP-105, Rev. 3 Page 16.of 17 VAW/ MPG /rgs

-- APPENDIX EP-105-5 GENERA!. Et1ERGEllCY PIIONE LIST Time Initiated (ESCALATION OR DE-ESCALATION) m l Pe rsonne1/ Agency To Be Notified Phone Number Time Person Res pond i ng

) a. Emergency Director IIcme G. M. Leitch Office l . _

1 i A1 ternate llome '

J. P. Franz Office -

r-

h. Ioad Dispatcher office
c. Pennsylvania Bureau of Radiation Protection lla r r i sbu rg , PA
d. NHC Operations Center
  • Ilethesda, MD t1ake this call last and remain on telept.one until NRC disconnects
  • Person contacting NRC must be I.i censed Op_ra to r -

hl 1

I

l-I EP-105, Rev 3 i Page 17.of 17 VAH/ MPG /rgs '

i APPENDIX EP-105-5 Tline initiated GENEHAL EM ERGENCY PilONE LIST .I (ESCALATION OR DE-ESCALATION) _

l  ;

Pe r sonne t/ Agency To Be Notitled Phone Number Time Person Hespondin -

?.gencias to be contacted af ter .

the al42ve personnel / agencies have I

i DS$D_81otifed _ _,

e. Montgomety County Office  !

of t'mergency Prepa rednesc ,

j ,u.(t tiedical Services

__ l 1

) '

t. l'..nnsylvania Emerqcncy

, H a..a g nie e n t Agenc.

4 I

i g. Is.:s ks County Emergency 6 l ti.. nag emen t A i

i

h. t.i. ester County Emergency

__ __ h ! Y I . _ . . .

' l .mpleted By* Time /l)ata ,

u,.iifjed ny:

(INTERIM) EMEPGENCY DIRECTCR d

l L _

i I .

d

3842102770 PHILADELP!!IA ELECTRIC COMPANY ELECTRIC PRODUCTION DEPARTMENT

  • LIMERICK GENERATING STATION

. May 14, 1984 FROM: P. J. Duca TO: G. M. Leitch

SUBJECT:

CANCELLATION MEMORANDUM FOR EP-232

Reference:

Limerick Administrative Procedure A-21 EP-232 should be cancelled because the samples which vculd be '

taken, are from another sampling station. For this procedure to be useable it would require an engineering modification. ,

P. J. Duca 05/14/84 FROM: G. M. Leitch TO: Holders of EP Procedures This Cancellation Memorandum has been reviewed by PORC and is approved. All holders of EP procedures should discard EP-232.

In accordance with Administrative Proce yli -21, procedure number EP-232 will not be re-used. /

[

APPROVEtt: A ATION SUPERINTENDENT

n. . L.,. W. P:,nT :. $, h. 4:

1 3

v g j'.,'; v #

  • 1u j g , y L 4.i..a C 1T)

(dLJ[s J

Wn .1 r @Y $$ f10 r - , -

.I -

EP-304 R;v. 2 3842102780 Peg 2 1 of 4

  • VAW MPG /rgs

)

PHILADELPHIA ELECTRIC COMPANY .-

LIMERICK GENERATING STATION ".

EMERGENCY PLAN IMPLEMENTING PROCEDURE EP-304 PARTIAL PLANT EVACUATION 1.0 PURPOSE The purpose of this procedure is to define the actions to be performed in the event that a partial plant evacuation is required.

2.0 RESPONSIBILITIES '

2.1 Personnel in affected areas requiring evacuation shall ,

evacuate the area and notify the control room.

2.2 The (Interim) Emergency Director shall direct the partial plant evacuation by performing the appropriate steps in this procedure.

3.0 APPENDICES None l 4.0 PREREQUISITES None # '

" U;iS./.__:. .i:I!

i kjh[. !!Uh!. $;Nl'4J  !

,q 5.0 SPECIAL EQUIPMENT f ~ *p1

. '.j ,' ,qd. 'y y

b None (Hb' d3 - "

Vili0 ?!LY El ED e;~ ..

? !V .n. -

!f?ni; 7f 8 K y. -

L

.l '

.. EP-304 R&v. 2 Pcgs ' of 4 VAW/ MPG /rgs 6.0 SYMPTOMS

  • 6.1 An increase in the area radiation monitors or continuous air monitor indications to' greater _than

~

alarm levels in two or more large operating areas.

6.2 Radiation' levels greater than 100 mR/hr within two or more large operating areas which normally experience less than 10 mR/hr.

6.3 uCi/cc for an Airborne-radioactivity unidentified isotope, (greater except than 3N8 for noble gas activity) or 10 MPC for identified isotopes in restricted areas in two or more large operating. areas.

6.4 Release, leakage or spill of a toxic reagent such that the concentration of chemical vapors-makes the areas uninhabitable in two or more large operating areas.

6.5 other hazards such as flood or fire affecting two cr more large operating areas 7 . 'O ACTION LEVEL This procedure shall be implemented by the (Interim)

Emergency Director when the symptoms of section 6.0 of this procedure occur. Two or more large operating areas is defined as two or more elevations in a single enclosure or one elevation in two or more enclosures. ,

8.0 PRECAUTIONS None 9.0 PROCEDURE 9.1 Actions 9.1.1 Personnel in the affected area not directly involved in controlling the hazard shall evacuate to a safe area. Notify the control roca of the type and location of the hazard.

M

.I

.I '

EP-304 Rav. 2

    • Pcgo 3 of 4 VAW/ MPG /rgs 9.1.2 The (Interim) Emergency Director or Shift ~

Supervision shall:

, 9.1.2.1 Upon receiving information from personnel in the field about a hazardous condition or from Control Room indications, evacuate the affected areas by making the following announcement:

"This (is) (is not) a drill. This (is) (is not) a drill. This is a Partial Plant Evacuation . Evacuate (locations of hazard) 1

nd assemble at (location of assembly area).

This (is) (is not) a drill. This (is) (is not) a drill."

9.1.2.2 If necessary, account for personnel in the affected area using means such as security computer, RWP's, etc.

9.1.2.3 If the hazard has a potential to spread to

  • Unit 2, evacuate constru *' n eersonnel by notifyi. 1 Safety r Bechtel Security Direct t em to call for either:

PARTIAL EVACUATION - ASSEMBLY AREA between the Main Construction Office and the Change House.

TOTAL PROJECT EVACUATION - ASSEMBLY AREAS at the upper parking lot and Post 43.

9.2 Follow-Up 9.2.1 The (Interim) Emergency Director shall:

9.2.1.1 Evaluate the situation and if conditions worsen call for an evacuation of the site in accordance with procedure EP-305 Site Evacuation.

l l 9.2.1.2 If the hazard can be contained and when ,

conditions permit,. perform recovery / cleanup ^

operations in accordance with EP-401 Entry l for Emergency Repair and Operations.

6

' l ' ,,

.

  • Ptg3 4 of 4 VAW/ MPG /rgs

10.0 REFERENCES

10.1 Limerick Generating Station Emergency Plan 10.2 NUREG 0654 Criteria fpr Preparation and Rev. 1 Evaluation of Radiological Emergency Response Plans and Preparedness in Support of Nuclear Power Plants 10.3 EP-110 Personnel Assembly and Accountability 10.4 EP-305 Site Evacuation 10.5 Bechtel Evacuation Procedures 10.6 EP-401 Entry for Emergency Repair and Operations 4'

\

_ - _ ---- --- ---- _ - A

3842102750 Pcga 1 of 4 f Revision 6

. t 07/09/84 EMERGENCY PLAN PRCCEDURE INDEX - l l ..

. PROCEDURE REV. DATE SIGNED DATE OF LAST NUMBER NO. TITLE BY SUPER. PERIODIC REVIEW r

EP-101 1 Classification of Emergencies 06/08/84 EP-102 3 Unusual Event Resconse 06/08/84 J

EP-103 3 Alert Resconse 06/08/84 EP-104 3 Site Emergency Response 06/08/84 EP-105 3 General Emergency Response 07/09/84 EP-106 1 Written Summary Notification 06/08/84 EP-110 2 Personnel Assemoly and Accountability 06/08/84

, EP-120 1 Site Emergency Coordinator 06/08/94 cP-201 1 Tecnnical Support Center i (TSC) Activation 06/08/84

, EP-202 1 Operations Support, Center

  • (OSC) Activation -

06/08/84 EP-203 1 Emergency Operations Facility (EOF) Activation 06/08/84 a

EP-208 2 Security Team Activation 06/08/84 1

I EP-210 1 Dose Assessment Team 06/08/84 i

t EP-220 CANCELLED i EP-221 1 Personnel Dosimetry, Sioassay, i and Respiratory Protection l Group 06/08/84 J

EP-222 1 Field Survey Group 06/08/84 EP-230 2 Chemistry Sampling and Analysis Team Activation 06/08/84 -

EP-231 2 Operation of Post- ,

j Accident sampling Systems '

t (PASS) 06/08/84 i

i l EP-232 CANCELLED  !

j EP-233 2 Retrieving and Changing i Sample Filters and

.i

! Cartridges from the .. r p3)9yf5'/

,"['k  : rgysp3p5 d'ety3

  • 1 Containment Leak Detector r v G ' i; =

5 l'

i During Emergencies 76'/08/34'

' ' . d .:' ' * **

X it 4

)

's. =. . <"Y f : ,b, 'a!!

4 CSI Ib x

ii t.a 4

v m ._ i e

.m i 1

i

._.._.__.-__.L.

Page 2 of 4

,. Revision 6 07/09/84 EMERGENCY PLAN PRCCEDURE INDEX **

PROCEDURE REV. DATE SIGNED DATE OF LAST NUMBER NO. TITLE BY SUPER. PERIODIC REVIEW EP-234 2 . Obtaining Containment Gas Samples from the Containment Leak Detector During Emergencies 06/08/84 EP-235 2 Obtaining Reactor Water Samples from Sample Sinks Following Accident Conditions 06/08/84 EP-236 1 Obtaining Cooling Tower Blowdown Line Water Samples Following Radioactive Liquid Release after Accident Conditions 06/08/84 EP-237 2 Obtaining the Iodine / 5 Particulate and/or Gas Samples from the North Vent Wide Range Gas Monitor (WRGM) 06/08/84 '

EP-23d 2 Obtaining Liquid Radvaste '

Samples from Radwaste Sample Sink Following 4

Accident Conditiens 06/08/84 EP-240 2 Obtatning Otf-Gas Samples from the Air o' 1

Ejector / Holdup Pipe Discharge Sample Station 06/08/84 EP-241 2 Sample Preparation and Handling of Highly Radioactive Liquid Samples 06/08/84 EP-242 2 Sample Preparation and Handling of Highly Radioactive Particulate Filters and Iodine Cartridges 06/08/84 EP-243 2 Sample Preparation and Handling of Highly i

Radioactive Gas Samples 06/08/84 i EP-244 0 Offsite Analysis of

High Activity Samples 06/08/84 EP-250 1 Personnel Safety Team Activation 06/08/84

) EP-251 1 Plant Survey Group 06/08/84

'{

y-

+

' * ' Pege 3 of 4 ,

.- ..* Revision 6 l

. p 07/09/84

. s I

EMERGENCY PLAN PROCEDURE INDEX '

PROCEDURE REV. DATE SIGNED DATE OF LAST NUMBER NO. TITLE BY SUPER. PERIODIC REVIEW EP-252 1 . Search and Rescue /First Aid 06/08/84 EP-254 1 Vchicle and Evacuee Control Group 06/08/84 EP-255 1 Vehicle Decontamination 06/08/84 EP-260 1 Fire and Damage  ;

Team Activation 06/08/84 EP-261 1 Damage Repair Group 06/08/84 e EP-272 1 Philadelphia Electric '

Company Officials 06/08/84 EP-273 1 Limerick Station Supervision Call List 06/08/84 s

EP-275 CANCILLED EP-276 1 Fire and Damage Team Phone List 06/08/84 EP-277 1- Personnel Safety -

Team Phone List

  • 06/08/84 EP-278 0 Security Team Phone List 12/27/83 EP-279 1 Emergency Operations Facility (EOF) Group Phone List 06/08/84 EP-280 1 Technical Support Center Phone List 06/08/84 EP-282 1 Government and Emergency Management Agencies 06/08/84 EP-284 1 Company Consultants and Contractors 06/08/84 EP-287 1 Nearby Public and Industrial Users of Downstream Water 06/08/84 EP-291 1 Staffing Augmentation 06/08/84 EP-292 1 Chemistry Sampling and Analysis Team Phone List 06/08/84 5 294 1 . Dose Assessment Team Phone List 06/08/84 EP-301 0 Operating the Evacuation Alarm and River Warning System *1, 11,32 EP-103 2 Local Evacuation 04/02/84 4

l

.,* Pago 4 of 4

,,', Revision 6 07/09/84 EMERGENCY PLAN PRCCEDURE INDEX

  • PROCEDURE. REV. DATE SIGNED DATE OF LAST NUMBER NO. TITLE SY SUPER. PERIODIC REVIEW EP-304 2 Partial Plant Evacuation 07/09/84 EP-305 1 Site Evacuation 06/08/84 EP-306 0 Evacuation of tne Information Center 12/27/83 EP-307 1 Reception and Orientation of Support Personnel 06/08/84 EP-312 0 Radioactive Liquid Release 11/30/83 EP-313 1 Distribution of Thyroid  !

Blocking Tablets 06/08/84 EP-316 0 Cumulative Population Dose Calculations for Airborne Releases -  %

Manual Method 12/23/61 EP-317 0 Determination of Protective Action ,

Recommendations 12/27/83 EP-318 0 Liquid Release Dose Calculations Method for Drinking Water 11/30/83 EP-319 0 Fish Ingestion Pathway Dose Calculation 11/3C/83 EP-325 0 use of Containment .-

Radiation Monitors to Estimate Release Source Term 12/29/83 EP-330 1 Emergency Response Facility Mabitability 06/08/84 EP-401 1 Entry for Emergency Repair and Operations 06/08/8%

EP-410 1 Recovery Pnase Implementation 06/08/84 EP-500 1 Review and Revision of Emergency Plan 06/08/84 .

I' I

1