.. - . _ . . .

e .. l James A. FitzPatrick )

M ,~ ~  ;

Lycomang, New York '13093

. 315 342.3840

  1. > New Yo.rk Power Harry P. Salmon, Jr.

W Authonty sii executive Omcer l l

December.6, 1995 JAFP-95-0535 e

E U.S. Nuclear Regulatory Commission Mail Station P1-137 Washington, D.C. 20555 l

Attention: Document Control Desk

SUBJECT:

OPERATING STATUS REPORT

Reference:

DOCKET NO. 50-333

Dear Sir:

Enclosed please find the James A. FitzPatrick Nuclear Power Plant Operating Status Report for the month of November 1995.

If there are any questions concerning this report, please contact

. Russ Flagg, Performance Engineering, at (315) 349-6768.

Very truly yours, 4

/

RRY . SALMON, J.

HPS G :rfh Enclosure CC: F. Edler /tC JAF Department Heads White Plains Office TS File RMS, JAF 120013 9512110391 951130 PDR R.. ..,

ADOCK 05000333

_ _ . PDR _

[l k i g

NEW YORK POWER AUTHORITY JAMES A. FIT 5 PATRICK NUCLEAR POWER PLANT OPERATING DATA REPORT DOCKET NO. 50-333 UNIT NAME: FIFEPAFRICK DATE: Dar mmmm8 1995 r COMPLETED BY: RD85 ELL FI.AGG TELEPHONEt (315)349-6768 t

OPERATING STATUS

1. Unit Names FITZPATRICK
2. Reporting Period 951101 - 951130 NOTES:
3. Licensed Thermal Power (MWT): 2436
4. Nameplate Rating (Gross MWE): 863.0
5. Design Electricai Rating (Net MWE): 816.0
6. Maximum Dependable Capacity (Gross MWE) 808.7
7. Maximum Dependable Capacity (Not MWE) 779.7
8. If changes occur in capacity ratings (Items 3-7) since last report, give reasons:
9. Power level to which restricted, if any (Net MWE): 797 MWE
10. Reasons for restrictions, if any: MVAR LOADING (SEE PAGE 5)

THIS MONTE YR-TO-DATE CUNULATIVE

11. Hours in Reporting Period 720.0 8016.0 178345.0
12. Number of Hours Reactor was critical 720.0 5784.8 .

125065.6

13. Reactor Reserve Shutdown Hours: 0 0 0
14. Hours Generator On-Lines 720.0 5595.4 120855.0
15. Unit Reserve Shutdown Hours: O O O
16. Gross Thermal Energy Generated (MWH): 1752336.0 13183173.0 267391840.0
17. Gross Electrical Energy Generated (MWH): 591630.0 4389900.0 90782710.0
18. Not Electrical Energy Generated (MWH): 572680.0 4247885.0 87235760.0
19. Unit Service Factor: 100.0 69.8 67.8
20. Unit Availability Factors 100.0 69.8 67.8
21. Unit capacity Factor (using MDC Net): 102.1 68.0 69.8
22. Unit Capacity Factor (using DER Net): 97.4 642 2 59.9
23. Unit Forced Outage Rate: 0.0 6.6 11.2
24. Shutdowns scheduled over next 6 months (type, date, and duration of each):
25. If shutdown at and of report period, estimated date of startup:
26. Units in Test Status (prior to commercial operation): FORECAST ACHIEVED Initial Criticality Initial Electricity ,

Commercial Operation i

l 1

I 1

l

i i

  • NEW YORK POWER AUTHORITY JAMES A. PIT 5 PATRICK NUCLEAR POWER PLANT AVERAGE DAILY UNIT POWER LEVEL REPORT MONTHS NOVEMBER 1995 DOCKET NO.s 50-333 UNIT NAME: FIFEPATRICK  ;

DATE: Deman 1995 COMPLETED BY: RDSSELL ELAGE TELEPliONE: (315)3d9-6768 DAY NET AVERAGE DAILY POWER LEVEL DAY NET AVERAGE DAILY POWER LEVEL 1 794 17 797 2 793 18 797 3 794 19 797 4 795 20 796 5' 795 21 797 6 795 22 797 7 793 23 796 8 795 24 796 9 795 25 795 10 795 26 796 11 794 27 795 l i

12 795 28 796 i 13 792 29 795 2

14 796 30 796 15 798 l 16 797 f 1

I

.}

~

NEW YORE POWER AUTEORITY JAMES A. FIT 5PATRICE NUCLEAR POWER PLANT UNIT SEUTDOWNS REPORT .

REPORT NORTH: MOVERBER 1995' DOCKET No.: 50-333 .

UNIT NAME: FITEFATRICK .

DATE: DEWEEER 1995  !

COMPLETED.BY MPSEELL N -

TELEPHONE: (325)347-6768 D C UH R MI:THOD S O .

RO E OF YC MC NO. DATE TYPE 'AU A SifUTTING LICENSEE SO .PO CAUSE AND CORRECTIVE ACTION '!

TR S DOWN EVENT TD 0D TO PREVENT RECURRENCE  ;

IS 'O THE REPORT- EE NE t O N REACTOR M E i N N T I i

1 2 3 4

' F: FORCED REASON: NETROD: EKBIBIT G -INSTRUCTIONS S SCHEDULED A. EQUIPMENT FAILURE (EXPLAIN) 1. MANUAL FOR PREPARATION OF DATA ENTRY j B. MAINTENANCE OR TEST 2. MANUAL SCRAM SHEETS FOR LICENSEE EVENT l C. REFUELING 3. AUTOMATIC SCRAM REPORT (LER) FILE (NUREG-0161)

D. REGULATORY RESTRICTION- 4. CONTINUED E. OPERATOR TRAINING AND LICENSE EXAMINATION 5. REDUCID LOAD F. ADMINISTRATIVE 9. OTHER G. OPERATIONAL ERROR (EXPLAIN)

H. OTHER (EXPLAIN) i

. - , , . ~ . . _ _ _ , _ . - _. . .- . . _ . . . . . , , . - . _ - . ~ _ . . . . . , _ _ . .,, . . _ - . . - . . , , . . _ . _ _ . . . - . _._. . . _ , . - , . ~ . -

  • NEW YORK POWER AUTEORITY JAMES A. FITEPATRICK NUCLEAR POWER PLANT MARRATIVE

SUMMARY

OF OPERATING EXPERIENCE ,

REPORT NONTHt NOVEMBER 1995 DOCKET NO.s 50-333 UNIT NAME: IITEPATJtICK DATE: Danmars 1995 COMPLETED BY: Rgmarr.r yLaag TELEPHONES (315)349-6768 Th3 FitzPatrick Plant remained in service throughout the reporting period. Unit output is

, reduced by approximately 5 MWE due to MVAR loading because of the possibility of transmission line instabilities.

4 i

s t

4

't k

e i