g Commonwealth litiwn Company

/

~#,

1400 0 pus Place d

I) owners Grove, IL 60515 December 7,1995 U.S. Nuclear Regulatory Commission Office of Nuclear Reactor Regulation Washington, DC 20555 Attn:

Document Control Desk i

Reference:

D. Saccomando letter to the Nuclear Regulatory Commission j

dated November 9,1995 l

Subject:

Additional Information Pertaining to November 4,1995 letter.

Braidwood Station Unit 1 i

NRC Docket Number 50-456 l

The referenced letter transmitted a summary of the steam generator inspection results for Braidwood Unit 1 AIR 05. Attached is Table 1, which was omitted 1

from our November 9,1995 letter. I sincerely hope this has not caused you any inconvenience.

If you have any questions, please contact this office.

Sincerely,

<~

Denise M. Sacco do Senior Nuclear Licensing Administrator Attachment cc:

D. Lynch, Senior Project Manager,-NRR R. Assa, Braidwood Project Manager-NRR C. Phillips, Senior Resident Inspector-Braidwood H. Miller, Regional Administrator-Rill Office of Nuclear Safety-IDNS kAnlaibraldwood\\119 add.wpf EBA22A8saasia!86 1i

_ Q.,,

PDR g

4 onia,m Company

Table 1

~

Braidwood Unit 1 I

A1R05 l

Tube Support Plate Integrity Program Tubes Tested With Intersections Tested SG Bobbin Coil Probe With Plus Point Probe A

95 24 B

75 45 l

C 75 57 D

75 254 i