M6 si ii<r-t-T: 'i.
r > hi, <r',
c r.ic-Tri,b u
Tst c Pe F ' ' L. i - n n
I L L ; N '1 ::5 a, 3 n u
.L; b i6 ot.
t i m.
P.o. box 5000 - CLEVELAND oHlo 44101 - TELEPHONE (216) 622-9800 - ILLUMINATING BLDG. - 55 PUBLIC SoVARE Serving The Best Location in the Nation E"*
MURRAY R. EDELMAN VICE PRESIDENT NUCUAR Mr. James G. Keppler Regional Administrator, Region III
' Office of Inspection and Enforcement U.S. Nuclear Regulatory Commission 799 Roosevelt Road Glen Ellyn, Illinois 60137 RE:
Perry Nuclear Power Plant Docket Nos. 50-440; 50-441 HPCS Local Panels E22-S001
[RDC 75(83)]
Dear Mr. Keppler:
In a letter to your office dated April 5, 1984, we transmitted our final report pursuant to 10CFR50.55(e) concerning a number of nonconforming condi-tions attributed to poor workmanship identified in the two High Pressure Core Spray (HPCS) Diesel Generator Local Panels. The purpose of this letter is to convey additional information relevant to a delay in closecut of the referenced nonconformance documentation as discussed with representatives from your office.
During the Project Organization document review and final field verification of corrective action which precedes our sign-of f of our Nonconformance Reports, several incomplete items were identified which were determined to require correction prior to closure of the Nonconformance Reports. It is now projected that these discrepancies will be resolved and both Nonconformance Reports will be closed by August 30, 1984.
Please call if there are any additional questions.
Sincerely, Mtu
/(
C Murray R]. Edelman B408220502 840809 PDR ADOCK 05000440 S
PDR Vice President Nuclear Group MRE:pab cc:
Mr. J. A. Grobe NRC Site Office Director Office of Inspection and Enforcement U.S. Nuclear Regulatory Commission Washington, D.C.
20555 U.S. Nuclear Regulatory Commission c/o Document Management Branch Washington, D.C.
20555 Records Center, SEE-IN Institute of Nuclear Power Operations 406 1 3 $84 g,f, j(
1100 Circle 75 Parkway, Suite 1500 Atlanta, Georgia 30339
/
' d)