Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- 0CAN038411, Ack Receipt of Re Revised Proposed Tech Specs on Waste Gas Sys.Tech Specs Unsatisfactory to Util & Nrc. Discussions Continuing.Schedule for Submittal to Be Provided + (ML20087N383)
- ML20087N386 + (ML20087N386)
- 05000362/LER-1984-007-01, :on 840305,spurious Reactor Protection Sys Trip Occurred.Cause Undetermined.No Restrictions Placed on Plant Operations as Result of Trip + (ML20087N387)
- ML20087N392 + (ML20087N392)
- ML20087N393 + (ML20087N393)
- B11093, Forwards Response to Radiological Assessment Branch SER Open Items Discussed at 840301 Meeting.Encl Formalizes Responses Given Orally at Meeting.Info Will Be Included in FSAR Amend 8,scheduled for Submittal in May 1984 + (ML20087N395)
- ML20087N400 + (ML20087N400)
- 05000321/LER-1984-002-01, :on 840224,while Preparing to Close Out Design Change Request,Records for Previous Local Leak Rate Test on Loop a Core Spray Min Flow Valve 1E21-F031A Not Available. Leak Test Failed.Valve Replaced + (ML20087N402)
- B11090, Forwards Status of Chemical Engineering Branch Draft SER Open Items Re Fire Protection,Discussed at 840307 Meeting. Responses Formalize Commitments & Will Be Incorporated Into Next FSAR Amend + (ML20087N403)
- ML20087N411 + (ML20087N411)
- ML20087N417 + (ML20087N417)
- ML20087N423 + (ML20087N423)
- W3P84-0836, Forwards C-E Preservice Shop Insp Rept,Per 840301 Request. W/O Encl + (ML20087N424)
- ML20087N428 + (ML20087N428)
- 05000259/LER-1984-016-01, :on 840229,while at 95% Power,During Installation of Ground Connector on Reactor Protection Panel 25-6B,w/common Leg to Panel 25-183,unit Scrammed. Caused by Vibration During Installation + (ML20087N430)
- ST-HL-AE-1076, Documents Util Understanding of Items Discussed in 840301 Meeting in Houston,Tx Re Engineering Assurance Program. Engineering Assurance Procedure Manual Encl + (ML20087N433)
- ML20087N435 + (ML20087N435)
- ML20087N438 + (ML20087N438)
- ML20087N440 + (ML20087N440)
- PLA-2074, Third Interim Deficiency Rept Re Electrical Separation Inside Multiple Division Junction & Pull Box.Initially Reported on 830721.Design Basis Criteria & Barrier Configuration Established.Also Reported Per Part 21 + (ML20087N442)
- ML20087N443 + (ML20087N443)
- ML20087N444 + (ML20087N444)
- 05000244/LER-1984-001, :on 840218 & 19,accumulator Pressure Decreased to Below Tech Spec Limit.Safety Injection Accumulator B Declared Inoperable.Caused by Valve Leaking Nitrogen by Seat.Manual Valve Downstream Closed + (ML20087N445)
- ML20087N446 + (ML20087N446)
- ML20087N447 + (ML20087N447)
- ML20087N449 + (ML20087N449)
- ML20087N450 + (ML20087N450)
- ML20087N453 + (ML20087N453)
- ML20087N454 + (ML20087N454)
- ML20087N458 + (ML20087N458)
- ML20087N460 + (ML20087N460)
- ML20087N462 + (ML20087N462)
- AECM-84-0208, Forwards Payment for 840329 Proposed License Amend. Remittance Inadvertently Omitted from 840329 Submittal + (ML20087N467)
- ML20087N471 + (ML20087N471)
- 3F0384-12, Requests Permanent Withdrawal from Consideration of 790321 Tech Spec Change Request 37 Re HPI Cycles & Credit for Unused Portion of Licensing Fee + (ML20087N473)
- ML20087N486 + (ML20087N486)
- ML20087N489 + (ML20087N489)
- 0CAN018420, Advises That Based on 840113 Meeting,Position Reevaluated on Reactor & Senior Reactor Operator Exams Conducted on 830920.No Action Requested on .Waivers Requested for Candidates Affected by Sections 4 & 7 of Exam + (ML20087N490)
- 05000293/LER-1980-041-03, Isolation Valves 5065-17 & 5065-22 Declared Inoperable.Caused by Valve Limits Being Out of Adjustment.Valve Items Adjusted & Exercised to Provide Correct Operation + (ML20087N491)
- AECM-84-0180, Rev 1 to Procedure 14-S-01-4, Training & Administrative Section Procedure + (ML20087N496)
- ML20087N499 + (ML20087N499)
- B11027, Forwards Response to Encl 4,Item 1 of NRC Re safety-related Structures,Sys & Components Controlled by QA Program & Draft SER Open Item Re Q-list + (ML20087N500)
- 1CAN118311, Requests That 20-day Appeal Period Begin from Date Ltrs of Denial Signed & Mailed & Not from Date on Denial Ltr,Per 831123 Telcon Re Ltrs of Denial Issued to Reactor & Senior Reactor Operator Candidates + (ML20087N501)
- RBG-17-339, Forwards Supplemental Responses to Draft SER Open Items Identified by Radiological Assessment Branch & Addressed in Util 831122 & s.Summary Listing of Each Item Encl. Responses Will Be Provided in Future FSAR Amend + (ML20087N506)
- 2CAN038401, Application to Amend License NPF-6,deleting Tech Spec Section 4.8.1.1.2.c.7 Re Diesel Generator Surveillance Requirements + (ML20087N508)
- ML20087N511 + (ML20087N511)
- ML20087N512 + (ML20087N512)
- ML20087N516 + (ML20087N516)
- ML20087N518 + (ML20087N518)
- ML20087N521 + (ML20087N521)
- ML20087N522 + (ML20087N522)