b At 8 ConEmers Power 3,,,,,c,,,
O Vice President - Projects, Engineenng and Construction General offices: 1945 West Parnall Road, Jackson, MI 49201-e (517) 788 0453 March 23, 1984 83-12 #2 Mr J G Keppler, Regional Administrator US Nuclear Regulatory Commission Region III 799 Roosevelt Road Glen Ellyn, IL 60137 MIDLAND ENERGY CENTER PROJECT DOCKET NOS 50-329 AND 50-330 ITT GRINNELL MECHANICAL SNUBBER ASSEMBLIES FILE:
0.4.9.84 SERIAL:
28048
Reference:
J W Cook letter to J G Keppler, Same' Subject, Serial 26652, dated January 6, 1984 This letter, as was the referenced letter, is an interim report of a potential 10CFR50.55(e) condition involving interference problems associated with ITT Grinnell mechanical snubber assemblies.
The attachment to this letter describes the concern and summarizes the' investigation and corrective action taking place.
Another report, either interim or final, will be sent on or before August 10, 1984.
bar &L L
JWC/AHB/1r
Attachment:
(1) MCAR-76, Interim Report 2, dated March 5, 1984 CC: Document Control Desk, NRC Washington, DC s
RJCook, NRC Resident Enspector Midland Nuclear Plant DHood, USNRC Office of NRR INPO Records Center 8404030471 840323 PDR ADOCK 05000329 S
PDR OC0384-0017A-MP01
,.gR 2 6 con-M9
- 'i 2
Serial 28048 83-12 #2 OM/0L SERVICE LIST Mr Frank J Kelley Atomic Safety & Licensing
. Attorney General of'the
-Appeal Board State of Michigan-U S Nuclear Rcgulatory Commission Ms Carole Steinberg Washington, DC 20555 Assistant Attorney General
. Environmental ~ Protection Division Mr C R Stephens (3) 720-Law Building Chief, Docketing & Services
. Lansing, MI 48913 U S Nuclear Regulatory Commission Office of the Secretary Washington, DC 20555 Mr Myron M Cherry, Esq
. Suite 3700 Ms Mary Sinclair Three First National Plaza 5711 Summerset Street Chicago, IL 60602 Midland, MI 48640 Mr Wendell H Marshall Mr William D Paton, Esq ERFD 10 Counsel for the NRC Staff Midland, MI 48640 U S Nuclear Regulatory Commission Washington, DC 20555
.Mr Charles Eechhoefer, Esq Atomic Safety & Licensing Atomic Safety & Licensing
-Board Panel Board Panel U S Nuclear Regulatory Commission U S Nuclear Regulatory Commission East-West Towers, Room E-413 Washington, DC 20555 Bethesda, MD 20014-Ms Barbara Stamaris
-Dr Frederick P Cowan 5795 North River Road 6152 N Verde Trail Rt 3 Apt B-125 Freeland, MI 48623 Boca Raton, FL 33433 Dr Jerry Harbour ihr Fred C Williams Atomic Safety & Licensing
.Isham, Lincoln & Beale Board Panel 1120 Connecticut. Ave, NW, Suite 840 U S Nuclear Regulatory Commission Washington, DC 20036 East-West Towers, Room E-454 Bethesda, MD 20014 EMr; James E Brunner, Esq Consumers Power Company Mr M I Miller, Esq
.212 West. Michigan Avenue Isham, Lincoln & Beale Jackson, MI 49201 Three First National Plaza 52nd Floor Mr D F.Judd Chicago, IL 60602
. Babcock & Wilcox 1PO Box 1260-Mr-John Demeester, Esq Lynchburg, VA 24505 Dow Chemical Building
~~
Michigan Division Mr Steve Gadler, Esq-Midland MI 48640-2120. Carter Avenue St Paul, MN.55108 Ms Lynne Bernabei
'~
Government Accountability Project 1901 Q Street, NW Washington, DC 20009-3/8/84' oC0384-0017A-MP01
i l
Serial 280h8 83-12 ea
. Bechtel Associates Professional Corporation 144319 144354 8UBJECT: MCAR 76 ITT Grinnell Figures 306 and 307 Mechanical snubber Attachment Interference INTERIM REPORT 2 DATE:
March 5, 1984 PROJECT: Consumers Power Company i
Midland plant Units 1 and 2 Sechtel Job 7220
REFERENCE:
ITT Grinnell letter to Bechtel, 11/16/82 (com 095537)
Introduction This report addresses ITT Grinnell Figures 306 and 307 mechanical snubbers supplied to the Midland project with potential interference problems. Interference may occur at the pipe clamp and/or between the shock arrestor pivot mount and rear bracket.
Description of Concern ITT Grinnell Figures 306 and 307 mechanical snubbers require an included angle cone of action to the pipe clamp axis to accommodate anticipated piping movements relative to the supporting structure.
Grinnell has informed Bechtel that for Figures 306 and 307 enubbers manufactured before April 1980, the included angle of the cone of action l
may be less than the design angle, gu_mmary of Investimation and Historical Backaround As discussed in the reference, ITT Grinnell has investigated the subject concern and determined the following.
1.
All mechanical snubbers produced and shipped by ITT Grinnell before October 1978 should be reviewed to assure sufficient clearance.
l' 2.
All mechanical snubbers produced and shipped by ITT Grinnell after Apell 1980 are acceptable based on design changes incorporated at that time.
0506u
- 14435g Bechtel Associates Professional Corporation McAn n i443l9 Interim Report 2 Page 2 3.
Mechanical snubbers produced and shipped by ITT Grinnell between October 1978 and April 1980 may exhibit a reduction of the included angle come of action, particularly:
a.
All mechanical snubbers that incorporate welded rear brackets; and
- b. ' size 3 and 35 pipe clamps t
Analysis of Safety Implication The potential interference (s) could restrict the pipe movement more than that considered by analysis. This could lead to piping stresses beyond Code limits and possible impairment of system safety function.
Probable Cause The probable cause of the interference (s) has been traced to two sources:
1.
Oversize shop weld (s) between the lugs of the ITT Grinnell rear bracket 2.
Excessive edge distance on the ITT Grinnell-manufactured pipe clamps Project engineering shall obtain from ITT Grinnell an explanation of the l
l' root cause and a plan for corrective action to preclude recurrence of the subject deficiency before the next report is issued.
Corrective Action Bechtel engineering has initiated a nonconformance report (NCR) to identify and track this deficiency. All mechanical snubbers (including ITT Grinnell Figures 306 and 307 snubbers) with potential interference problems furnished to the Midland plant will be inspected during the construction Completion Program (CCP) for pipe supports. Project engineering has provided appropriate inspection criteria for this inspection. Nonconforming snubbers found during inspection will be documented on the hCR, and appropriate corrective action will be taken.
0506ue
Bechtel Associates Professional Corporation i
144354 MCAR 76
,443,g Interim Report 2 Page 3
~Reportability Based on safety implications, this deficiency was reported to the NRC as potentially reportable in accordance with Title 10 of the Code of Federal Regulations, Part 50.55(e) on December 9, 1983.
/d__._
Submitted by-E.B. Poser Project Engineering Manager
.g.
... Approved by-
- /L' B.R. glein Plant Design Chief Engineer r
L N
Approved by:
l E.H. Smith Engineering Manager l
l Concurrence by:
I
/W M.A. DietricT1 Pr0 ject Quality Assurance Engineer RFT/MS/j sh*(PD) l l
!=
l l
l l
l l -.
0506u
-