Category:TECHNICAL SPECIFICATIONS & TEST REPORTS
MONTHYEARNOC-AE-000661, Rev 4 to Severe Weather Plan, Including Summary of Changes.With1999-10-0404 October 1999 Rev 4 to Severe Weather Plan, Including Summary of Changes.With ML20217A2421999-09-30030 September 1999 Proposed Tech Specs Removing Parameters No Longer Applicable & Adding Tdf Value for Model 94 SGs in Place of Reactor Coolant Sys Flow ML20211Q8071999-09-0808 September 1999 Proposed Tech Specs & Associated Bases for Specification 3/4.8.1, AC Sources, to Eliminate Requirement for Accelerated Testing of Standby DGs & Associated NRC Reporting Requirements ML20211Q2361999-09-0808 September 1999 Proposed Tech Specs 3/4.8.1,revised by Relocating 18-month Surveillance to Subject Sdg to Insps IAW Procedures Prepared in Conjunction with Mfg Recommendations to Section 3.8.1.1.4.8 of UFSAR ML20211G2281999-08-24024 August 1999 Proposed Tech Specs Pages,Relocating Cycle Specific Operating Parameters from TSs to Colr,Including Moving Location of Insert 6 from Page 6-21 to Page 6-22 of Administrative Control Section & Renumbering Methods List ML20211C0371999-08-18018 August 1999 Proposed Tech Specs 3.4.9.3 Re Cold Overpressure Mitigation Curve Associated with Replacement SGs ML20210J0481999-07-28028 July 1999 STP Unit 1,Cycle 9 Startup Testing Summary Rept ML20209G9351999-07-15015 July 1999 Proposed Tech Specs 3.7.1.6 Re Atmospheric Steam Relief Valves ML20209H2131999-07-13013 July 1999 Rev 4,revised Pages 29 & 30 of 102 to Procedure 0ERP01-ZV-IN01, Emergency Classification ML20209H3371999-07-13013 July 1999 Rev 0 to 0PGP02-ZA-0004, Station Performance Data Collection,Categorization & Reporting ML20209G4461999-07-13013 July 1999 Proposed Tech Specs,Modifying 3.6.3 Action B,Clarifyin Use of Check Valve with Flow Through Valve Secured as Means to Isolated Affected Containment Penetrations ML20209C1511999-07-0101 July 1999 Proposed Tech Specs Pages Re Amend to License NPF-80, Changing TSs 3.3.2 & 3.7.8 Allowing All Fuel Handling Bldg Exhaust Air Sys Components to Be Inoperable for Period of 8 Hours to Facilitate Repair of Train B Exhaust Booster Fan ML20209B5341999-06-24024 June 1999 Proposed Tech Specs Section 6.9.1.6.a,adding Min Measured RCS Flow,Which Lists Parameters Included in COLR ML20209H3151999-06-23023 June 1999 Rev 4 to 0PGP02-ZA-0003, Comprehensive Risk Management ML20195E4211999-06-0707 June 1999 Proposed Tech Specs,Relocating cycle-specific RCS-related TS Parameter Limits to COLR ML20195E4701999-06-0707 June 1999 Proposed Tech Specs Pages Re Proposed Amend to Licenses NPF-76 & NPF-80,deleting Total Allowance,Sensor Error & Z Terms from ESFAS & RTS Instrumentation Trip Setpoint Tables of TS 2.2.1 & 3.3.2 ML20209H3081999-06-0101 June 1999 Rev 3 to 0PGP04-ZA-0604, Probabilistic Risk Assessment Program ML20205S3511999-04-19019 April 1999 Proposed Tech Specs Bases Page 3/4 8-3 Removing Reference to Fast Transfer Capability That Is Inconsistent with STP Design Bases as Described in UFSAR Chapters 8.2 & 8.3 ML20205G8081999-03-30030 March 1999 Proposed Tech Specs,Relocating Section 3/4.3.3.4, Meteorological Instrumentation & Associated Bases Description to STP Trm,Per NUREG-1431 ML20204J9681999-03-22022 March 1999 Proposed Tech Specs Incorporating New TS for Atmospheric Steam Relief Valve Instrumentation & Revising TS 3.7.1.6 Re Atmospheric Steam Relief Valves ML20204D1581999-03-15015 March 1999 Proposed Tech Specs 3/4.7.9 for Snubbers to TRM ML20207D9651999-03-0202 March 1999 Proposed Tech Specs Change Clarifies Use of Check Valve with Flow Through Valve Secured as Means to Isolate Containment Penetration in TS 3.6.3 Action B ML20207C4721999-02-24024 February 1999 Proposed Tech Specs Bases 3/4.2.5,clarifying That Averaging of Only Three Channels Is Min Expected When Verifying DNB Parameter Compliance ML20202G6871999-01-26026 January 1999 Proposed Tech Spec Page 3/4 4-39,revising TS 4.4.10 for Alternate ISI of RCP Flywheels ML20199K5681999-01-20020 January 1999 Proposed Tech Specs Surveillance Requirement 4.7.1.2.1.a Re AFW Pump Performance Testing ML20198A2181998-12-10010 December 1998 Revised TS Pages,Adding Ref to TS Figure 2.1-2 to Bases Section 2.1.1 as Figure Provides DNBR Curves Appropriate to Alternate DNB Operating Criteria ML20198A1951998-12-0909 December 1998 Corrected TS Bases Pages B 3/4 8-15,-16 & -17,as Discussed During 981103 Telcon ML20196B8121998-11-23023 November 1998 Proposed Tech Specs Pages for Proposed Amends to Licenses NPF-76 & NPF-80,relocating Descriptive Design Info from TS 3/4.7.1.1 (Table 3.7-2) Re Orifice Sizes for Main Steam Line Code Safety Valves,To Bases Section ML20155J9031998-11-0303 November 1998 Proposed Corrected Tech Specs Bases 3/4 9-3 Re Water level- Refueling Cavity & Storage Pools ML20155D5441998-10-29029 October 1998 Proposed Tech Specs Pages for Proposed Amend to Relocate Turbine Overspeed Protection TS 3/4.3.4 to TRM ML20155D5561998-10-29029 October 1998 Proposed Tech Specs Pages for Proposed Amends to Relocate Snubber TS 3/4.7.9 to TRM ML20155D5801998-10-29029 October 1998 Proposed Tech Specs Pages for Amends to Relocate Portion of TS Surveillance Requirement for DG Fuel Oil Storage Tank to TRM ML20154M1621998-10-12012 October 1998 Revised Tech Specs Bases Pages B3/4 8-14 Through -17 ML20154C0051998-09-30030 September 1998 Proposed Tech Specs Reflecting Replacement SG Tube Insp Surveillance Differences & Deleting Provision Allowing Use of F* Alternate Repair Criteria ML20154C5071998-09-30030 September 1998 Proposed Tech Specs Bases Page B 3/4 9-2,removing Wording Re 10% Value for Clad Gap Iodine Isotopics ML20154A4281998-09-28028 September 1998 Proposed Tech Specs Re Requirements Associated with Control Room & Fuel Handling Bldg Ventilation Sys ML20151T1621998-08-31031 August 1998 Proposed Tech Specs 3.4.9.3 Re Cold Overpressure Mitigation Curve Associated W/Replacement SGs ML20238F0841998-08-28028 August 1998 Proposed Tech Specs Section 4.0.5,excluding Specified Containment Isolation Valves from ISI & Testing Requirements as Stated in Section XI of ASME Boiler & Pressure Vessel Code ML20236T5141998-07-22022 July 1998 Proposed Tech Specs Re Replacement SG Water Level Setpoint Differences ML20236R1461998-07-15015 July 1998 Proposed Changes to Current Tech Specs Bases ML20236L6311998-07-0707 July 1998 Proposed Tech Specs,Reflecting Rev of Criticality Analyses & Rack Utilization Schemes for Regions 1 & 2 of Spent Fuel Racks as Described in STP UFSAR & TSs ML20236K3481998-07-0606 July 1998 Proposed Tech Specs,Relocating 3/4.7.13 Requirements for Area Temp Monitoring Sys to Technical Requirements Manual ML20236M6381998-07-0606 July 1998 Proposed Tech Specs,Relocating 3/4.3.3.3 Requirements for Seismic Instrumentation to Technical Requirements Manual ML20236N0001998-07-0606 July 1998 Proposed Tech Specs,Relocating RCS Design Features from TS Section 5.4 to UFSAR ML20247F3321998-05-0707 May 1998 Proposed Tech Specs Pages,Reflecting Replacement SG Reactor Coolant Flow Differences ML20217P1441998-04-0202 April 1998 Proposed Tech Specs 3.4.5 Re voltage-based Repair Criteria ML20202H9771998-02-16016 February 1998 Proposed Tech Specs Pages,Implementing 1-volt voltage-based Repair Criteria for SG Tube Support plate-to-tube Intersections ML20198C3741997-12-31031 December 1997 Proposed Tech Specs 2.1,2.2 & 3/4.2.5 for Alternate Operation W/Reduced Measured RCS Flow ML20197A7211997-12-17017 December 1997 Proposed Tech Specs Pages,Revising TS 4.6.2.1 to Extend Surveillance Interval of Containment Spray Sys Nozzle Air Flow Test from Five Years to Ten Years ML20199H2081997-11-20020 November 1997 Revised TS Bases Page B 3/4 4-15 1999-09-08
[Table view] Category:TEST/INSPECTION/OPERATING PROCEDURES
MONTHYEARNOC-AE-000661, Rev 4 to Severe Weather Plan, Including Summary of Changes.With1999-10-0404 October 1999 Rev 4 to Severe Weather Plan, Including Summary of Changes.With ML20209H3371999-07-13013 July 1999 Rev 0 to 0PGP02-ZA-0004, Station Performance Data Collection,Categorization & Reporting ML20209H2131999-07-13013 July 1999 Rev 4,revised Pages 29 & 30 of 102 to Procedure 0ERP01-ZV-IN01, Emergency Classification ML20209H3151999-06-23023 June 1999 Rev 4 to 0PGP02-ZA-0003, Comprehensive Risk Management ML20209H3081999-06-0101 June 1999 Rev 3 to 0PGP04-ZA-0604, Probabilistic Risk Assessment Program ML20212G0031997-10-21021 October 1997 Rev 2 to OPGP-04-ZA-0002, Condition Rept Engineering Evaluation Program ML20209H3321997-07-31031 July 1997 Rev 2 to 0PGP01-ZA-0304, Probabilistic Safety Assessment Risk Ranking ML20198E8411997-05-22022 May 1997 Rev 4 to 0PGP05-ZA-0002, 10CFR50.59 Evaluations ML20217G8191997-02-15015 February 1997 Rev 16 to 0POP03-ZG-0009, Mid Loop Operation ML20198E8511996-10-28028 October 1996 Rev 5 to 0PGP05-ZA-0002, 10CFR50.59 Evaluations ML20134J9951996-09-11011 September 1996 South Tx 1 Fuel Assembly Insp Program ML20148C9531996-07-15015 July 1996 Rev 0 to 0PGP04-ZA-0604, Probabilistic Safety Assessment Program ML20217F0001996-04-0101 April 1996 Rev 0 to Usqe 96-0101, Control Room Envelope HVAC Emergency Makeup Flow Control Damper B2HEFCV9585 Temporary Mod ML20097D4021996-02-0202 February 1996 Rev 0 to 0PGP02-ZA-0004, Station Performance Data Collection,Categorization & Reporting ML20097D3751996-02-0202 February 1996 Rev 0 to 0PGP02-ZA-003, Comprehensive Risk Mgt ML20097D3821996-01-0202 January 1996 Rev 0 to 0PGP02-ZA-XXXX, Probabilistic Safety Assessment Program ML20097D3881995-10-30030 October 1995 Rev 0 to 0AAA00-AA-0000, Configuration Control of Probabilistic Safety Assessment ML20149E0061995-10-20020 October 1995 Rev 1 to Procedure Usqe 92-0022, Proposed Change Evaluates Doses from Leakage of Sump Water Into Rwst ML20149E0561995-10-20020 October 1995 Rev 2 to OPGP05-ZA-0002, 10CFR50.59 Evaluations, Form 2 ML20093E7361995-10-0202 October 1995 Rev 0,Suppl 1 to ISI Plan for First Insp Interval of South Tx Project Electric Generating Station Unit 1 ML20149E0321995-06-0404 June 1995 Rev 2 to Procedure OPGP05-ZA-0002, 10CFR50.59 Evaluations, Form 1 ML20080G9091994-12-31031 December 1994 1999 Business Plan ML20217G8141994-11-22022 November 1994 Rev 2 to 0PGP03-ZA-0101, Shutdown Risk Assessment ML20078Q2561994-11-0707 November 1994 Rev 6 to OPMP04-JC-0002, Polar Crane Insp ML20078C5971994-10-26026 October 1994 Rev 4,Suppl 2 to STP Electric Generating Station Unit 2 Pump & Valve IST Plan ML20078C5961994-10-26026 October 1994 Rev 6,Suppl 2 to STP Electric Generating Station Unit 1 Pump & Valve IST Plan ML20078Q5651994-10-17017 October 1994 Rev 6 to OPGP03-ZX-0002, Condition Reporting Process ML20078Q7291994-10-17017 October 1994 Rev 10 to OPGP03-ZA-0090, Work Process Program ML20078Q8051994-10-17017 October 1994 Rev 2 to OPGP04-ZE-0310, Plant Mods ML20078Q5081994-08-29029 August 1994 Rev 7 to OPMP02-ZG-0011, Alternative Valve Packing & Live- Load Valve Packing ML20078Q5581994-06-24024 June 1994 Rev 5 to OPGP03-ZX-0002, Corrective Action Program ML20078Q7801994-06-0101 June 1994 Rev 2 to OPEP07-ZE-0007, MOV Tracking & Trending Program ML20078Q4021994-05-24024 May 1994 Rev 7 to OPOP01-ZA-0001, Plant Operations Dept Administrative Guidelines ML20064N4561994-03-21021 March 1994 South Tx Project Electric Generating Station Operational Readiness Plan Unit 2 ML20078Q5521994-03-0808 March 1994 Rev 2 to OPOP02-AF-0001, Auxiliary Feedwater ML20078Q2581994-02-14014 February 1994 Rev 5 to OPGP03-ZM-0021, Control of Configuration Changes ML20078Q5671994-01-25025 January 1994 Rev 8 to OPGP03-ZA-0090, Work Process Program ML20063K3251993-12-23023 December 1993 300 Ton Essential Chiller Bypass Mod Verification Test ML20058C4771993-10-25025 October 1993 Rev 0 to STP Restart Action Plan ML20083P6821993-10-19019 October 1993 Rev 1 to Dept Procedure 0POP05-EO-EC00, Loss of All AC Power ML20078Q7851993-10-15015 October 1993 Rev 0 to, Equipment History Program ML20058N7821993-10-14014 October 1993 STP 1994-98 Business Plan ML20083P6831993-09-15015 September 1993 Rev 2 to Dept Procedure 0POP04-AE-0001, Loss of Any 13.8 Kv or 4.16 Kv Bus ML20046A2161993-07-15015 July 1993 Field Change 93-1163 to Rev 0 to Procedure 0PGP05-ZV-0008, Siren Sys Activation,Testing & Documentation, Adding Caution to Conducting Manual Growl Test ML20062L1461993-07-0606 July 1993 Rev 3 to Speakout Program Instruction SPI-02, Classification of Concerns ML20045E9781993-06-29029 June 1993 Rev 4 to Pump & Valve IST Plan, for Stp,Unit 2 ML20045E9901993-06-29029 June 1993 Rev 6 to Pump & Valve IST Plan, for Stp,Unit 1 ML20078Q2751993-06-28028 June 1993 Rev 5 to ISEG-01, Independent Safety Engineering Group Organization & Responsibilities ML20062L2301993-03-0202 March 1993 Rev 2 to Speakout Program Instruction SPI-08, Speakout Review Committee ML20062L2101993-03-0202 March 1993 Rev 2 to Speakout Program Instruction SPI-07, Speakout Repts 1999-07-13
[Table view] |
Text
' eenustow u2wtes a powsa cou..wv
['s NUCLEAR ENGINEERING & CONSTRUCTION PROCEDURES MANUAL l
SUMMARY
OF REVISIONS l
' .noe no l essssc, EAD-7 l Reporting and Disposition of Action Items
",' ' ' * ;*, " as visio= on sca..tio~
Training Required i
yes no 0 Original issuance l 1 Changes " design process technical audit" to " design /
process review" <
2 Provides additional guidance for resolving action items !
generated by Engineering Assurance reviews / assessments e l
l l
[
[
l l
l l
ma visio= autaomizaview asvisnow
=vuesa O' 1 2
- s...so
..ov.o g, w #
es , ,
8404030513 840329 PDR ADOCK 05000498 A _ . P DR _ ,,__ _ _ _.. . _ . .
s ',
nouse uname o rowsa coww moc ao- n * * ~ o-NUCLEAR ENGINEERING & CONSTRUCTION EAD-7 2 PROCEDURES MANUAL 1eTLE PAGE OF 1 8 Engineering Assurance Department Procedure swea cv o^85N-84 Reporting and Disposition of Action Items o.s. tn.co 2-1-84 1.0 Purpose This procedure identified establishes as a result the method of Engineering Assurance for reporting)
(EA problems and concernsdesign independent technical assessments as well as third-party design assessments.
It also describes the process for tracking and verifying resolution of all action items identified by the Engineering Assurance Department (EAD) or its consultants.
2.0 Scope This procedure applies to design process reviews and assessments performed by and for the Engineering Assurance Department.
3.0 References 3.1 Engineering Assurance Department Procedure EAD-5, Control of Design Process Review and Assessment Records l
3.2 Nuclear Engineering & Construction Project Li. censing Procedure PLP-02, Reporting Design & Construction Deficiencies to NRC
[ 4.0 Definition Action items - any concerns identified as a result of design process reviews / assessments and requiring disposition 5.0 Responsibilities 5.1 k nager, Engineering Assurance Department EAD engineer (s) and Reviews the initiated forwards these action item to the Manager, South list Texasdeveloped by(STP) Engineering, Project for resolution; forwards action item list to the Vice President, Nuclear Engineerin ment (QA) for ginformation; & Construction assures(NE&C), and pertaining that concerns to the Quality Assurance De to design l
process reviews / technical assessments performed by and for the Engineer-ing Assurance Department are adequately resolved l
5.2 Manager, South Texas Project Engineering Assesses the significance of the action items, determines any necessary actions, infoms EA of the proposed actions, and directs implementation l
of the necessary actions for resolving the concerns l
-- -- - _ , ~ . _ _ _ . _ _ _ , _ , _
.s ,
PR oc. eco. F.e v. avo.
SEDUSTON LIGestatC S Posvtc C0488Ansv NUCLEAR ENGINEERING & CONSTRUCTION EAD-7 2 PROCEDURES MANUAL T WL t PAGE 08 Engineering Assurance Department Procedure 2 8 swea cv o.se .ss 2- '[-84 Reporting and Disposition of Action Items n s. m ..si,,
2-1-84 __
5.3 Engineering Assurance Department engineer Initiates and/or reviews a list containing the action items identified as a result of design process reviews and technical assessments per-formed by and for the EAD; also reviews the technical adequacy of the resolutions or dispositions of action items 6.0 Procedure 6.1 Initiation of Action Item Fom(s)
For design process reviews / assessments performed by the Engineering Assurance Department, the EAD engineer shall initiate the Action Item Fom(s) (Attachment 7.2) by providing a brief description of concerns,
, shall sign the Action Item Cover Sheet (Attachment 7.1) as the initia-l tor, and shall submit both to the Manager, Engineering Assurance Depart-I ment, for his review and submittal to STP..
For third-party design assessments, the EAD engineer shall review the final report prepared by the consultant, determine the action items, I prepare the Action Item Fom(s), sign the Action Item Cover Sheet, and forward both to the Manager, Engineering Assurance Department.
If while initiating or reviewing the action items the EAD engineer judges the concerns to be potentially reportable in accordance with the Code of Federal Regulations, he or she is required to initiate a Defi-ciency Evaluation Form in conformity with NE&C Project Licensing Proce-dure PLP-02, Reporting Design and Construction Deficiencies to NRC.
6.2 Review, distribution, and disposition of action items 6.2.1 Review and distribution The Manager, Engineering Assurance Department, shall review the action items developed by EA to assure their consistency with the review / assessment report and shall sign the Action Item Cover Sheet as a reviewer. The Engineering Assurance Department shall then transmit the action items, together with the review /
assessment report, to the Manager, STP Engineering, with copies to QA, to the Vice President, NE&C, and to other organizations in accordance with Engineering Assurance Department Procedure EAD-5, Control of Design Process Review and Assessment Records.
l u
06UST0as LelesTitC & POwt2 COe8Pt.suv PA oc. tio. ma v. wc.
NUCLEAR ENGINEERING & CONSTRUCTION EAD-7 2 PROCEDURES MANUAL
, TeTLE PAGE OF Engineering Assurance Department Procedure 3 8
- Lea ce o*st iss 2-'I-84 Reporting and Disposition of Action Items n, pr.m
. 2-1-84 1
6.2.2 Resolution of Engineering Assurance action items The Manager, STP Engineering, shall evaluate the action items, determine the actions necessary to resolve the concerns, and direct and coordinate the implementation of these actions with the affected organizations. By completing the Action Item Reply
. Form (s) (Attachment 7.3), the Manager, STP Engineering, shall inform the Manager, Engineering Assurance Department, regarding the actions being taken to resolve the concerns and the expected completion dates.
- Each response shall contain the following:
- specific identification of the cause of the action item
- assurance that the proposed action is sufficient to eliminate o the cause R2
- a statement that the immediate effect has been corrected
- confirmation that the possibility has been analyzed and addressed that other work might be affected
- a reasonable schedule for corrective work Upon completion of implementation of all actions required to resolve the concerns, the Manager, STP Engineering, shall sign the Action Item Cover Sheet and notify the Manager, Engineering Assurance Department, the QA Department, and other organizations as appropriate. '
6.2.3 Engineering Assurance verification of the resolution of action l items For design process reviews / assessments performed by the Engineer-ing Assurance Department, the responsible EAD engineer shall review the implemented actions and perform any necessary follow-up to close out the action item. If the concerns are lR2 adequately resolved, he or she shall sign the Action Item Cover Sheet as verifier and forward this to the Manager, Engineering Assurance Department, for'his approval and final disposition.
For third-party design assessments, the responsible EAD engineer shall review the implemented actions and perfom reassessments to ascertain that the concerns raised by the outside consultant are
- adequately addressed. If the resolutions are adequate,the responsible EAD engineer shall sign the Action Item Cover Sheet L -, - - . _ . . - . - . . - . - - _ . - . . ..-. .
- . - ..__ _
l %
espuST04 UINTshC & Powt2 COwANY PA cc. N3. AE v. NO.
NUCLEAR ENGINEERING & CONSTRUCTION EAD-7 2 PROCEDURES MANUAL
, .n e ca e, 4 8 Engineering Assurance Department Procedure susse cv Cats iss Reporting and Disposition of Action Items ,,s, g,,,, o ,,
2-1-84 as verifier and shall draft a letter containing the resolutions of the action items for the signature of the Manager, Engineering Assurance Department, and subsequent transmittal to the outside consultant.
The Manager, Engineering Assurance Department, shall, by signing the Action Item Cover Sheet, assure that the concerns identified as a result of EA design process reviews / independent technical assessments, as well as third-party design assessments, have been properly resolved. He shall also transmit a copy of the resolu-tions or disposition of third-party design assessment action items to the outside consultant.
6.2.4 Distribution The Engineering Assurance Department shall distribute the com-pleted Action Item Cover Sheet to the Vice President, NE&C, to STP, to QA, and to any other organizations in accordance with Engineering Assurance Department Procedure EAD-5, Control of Design Process Review and Assessment Records.
7.0 Attachments 7.1 Action Item Cover Sheet 7.2 Action Item Form 7.3 Action Item Reply form 7.4 Procedure flow chart
PJtOC 880- # E ' "C-OEDUSTOsv LignisseC G POWWEQ C0a#ANY NUCLEAR ENGINEERING & CONSTRUCTION EAD-7 2 PROCEDURES MANUAL TeTLE PAGE Of 5 8 Engineering Assurance Department Procedure SuSJE CT C ATE ellut D 2-1-84 Reporting and Disposition of Action Items mate g,,e tive 2-1-84 Attachment 7.1 Action Item Cover Sheet i
i Action item Cover Sheet Review / assessment subject title:
Document no.: Review / assessment no.:
- 1. Action items prepared by f Engineering Assurance Department Date i engineer l I
t Engineering Assurance Department Date engineer
- 2. Action items reviewed by Renager, Date Engineering Assurance Department ,
- 3. Actions pertaining to review /
. assessmer.t have been
! foplemented.
Manager ETP Engineering Date 4 Isolementation of actions has been verified.
Engineering Assurance Department Date engineer ,.
Engineering Assurance Department Date engineer
- 5. All concerns pertaining to review / assessment no, have been resolved.
Renager. Date Engineering Assurance Department l
_ .. . _ J
DeDUSTON LIGHTINC O P0vvtQ C0***aNy P3CC ND- EE *. NC-NUCLEAR ENGINEERING & CONSTRUCTION EAD-7 2 PROCEDURES MANUAL tetts Pact ce 6 8 Engineering Assurance Department Procedure SW8st CT C ATE '55ut D 2-1-04 Reporting and Disposition of Action Items use g,,est,,e 2-1-84 Attachment 7.2 Action Item Fonn l
Action Item Form ,
Page of
, Review / assessment subject title:
- Review / assessment no.
- Prepared by item no. descriptionofcondition(s)
I l
l i
i i 8
l e
- - - - - - ~ - - - -
a c "o. c.: v. wo.
esousto= usatswc a Powan cows =v NUCLEAR ENGINEERING & CONSTRUCTION EAD-7 2 PROCEDURES MANUAL
, ne eson ou 7 8 Engineering Assurance Department Procedure SusstCT DATE'S$vtD 2-1-84 Reporting and Disposition of Action Items o.se cerectiv.
2-1-84 Attachment 7.3 Action Item Reply Form Action M M Form e
' Page of Review / assessment subject title:
Review / assessment no:
l Describe cause(s) and extent of adverse condition (s) and Cafine itse no. proposed actions to resolve and prevent recurrence of adverse I condition (s). Use additional sheets as necessary, t
l l
e
! l l
l l 3 l i t
E
! Date action (s) scheduled to be complete:
f Manager 5TP Engineering Date .
l e
I i
I-l L_. -. _
,. *e 00DVSTgas LtGeqTlasc Q P0wt0 C0t**ANy exoc.esa ne v. wo.
NUCLEAR ENGINEERING & CONSTRUCTION EAD-7 2 PROCEDURES MANUAL T JL t Pa G E 08 8 8 Engineering Assurance Department Procedure Sussl et caTt istuto 2-1-84 Reporting and Disposition of Action Items oste effective 2-1-84 Attachment 7.4 Procedure Flow Chart i
%::e..e ,, e 1 Form, si ns " Mt4C Procedure reporta61e --- PLP-02 Al Cover Sheet 0
49 o
,,o' O Mgr. EAD:
. reviews action items
- signs Al Cover Sheet
. sends to Ngr. STP Engg:
. Al Fom
. Al Cover Sheet
- report t
Mgr. STP Engg:
. determines corrective actions
- . implements corrective actions j . completes Al Reply Fore
- signs Al Cover Sheet
- nctifian Moe. EAD i'
EAD engr reviews actions.
" ' - reassesses for adequate resolution yes a
EAD engr signs Al Cover Sheet, drafts letter to consultant (for 3rd party desian assessments) ir Mer. [AD. assures resolution of concerns, for 3rd.oarty__ 1etter to signs Al Cover Sheet, sesign assessmentis consultant closes file it Al Cover Sheet to:
- VP. NESC
- Mgr. STP tagg
- QA
. Records ,
.- , - -.