NUCLEAR ENGINEERING & CONSTRUCTION PROCEDURES MANUAL
SUMMARY
OF REVISIONS
- moc no I owsetet Planning and Scheduling of Design Process Reviews IAD-2 I
and Technical Assessments
- 8;'[0*
asvisiow onsca.eteo w Training Required ye,s no 0
Original issuance 1
Changes " design process technical audit" to " design
[
process review" 2
Provides for review and comment by Manager STP Engi-neering, and lianager, STP Licensing, on topics of f
Engineering Assurance reviews / assessments; includes
/
additional guidelines for selecting and establishing priorities for review / assessment topics; updates flow chart; adds review / assessment scope and schedule cover sheet as visio% avvaoninaview asvs o=
wwweea 0-1 2
- ~.-
+s i w/
+
m.
av J,Y M_V f C Y
&#P Aov8 3,
. w M r/
Mm
. fMA 8404030468 840329 PDR ADOCK 05000498
~
., 6).
W1.
souston usatas o coata cowav
- a o c. co-a s v. we.
NUCLEAR ENGINEERING & CONSTRUCTION EAD-2 2
j PROCEDURES MANUAL 5.n o
..ca e,
Engineering Assurance Department Procedure I
7 2
suesa ct c.va.ssus e Planning and Scheduling of Design Process Reviews 2-1-84 and Technical Assessments
" t"'!S5-84 f
1.0 Purpose This procedure provides guidance and establishes criteria for developing the plan and schedule of design process reviews and technical assessments to be performed by the Engineering Assurance Department.
2.0 Scope This procedure applies to all design process reviews and technical assess-ments perfonned by the Engineering Assurance Department.
Engineering Assur-ance functions related to third-party design assessments are specified in Engineering Assurance Department Procedure EAD-6, Contracting and Administer-
{
ing Third-party Design Assessments.
3.0 References 3.1 Engineering Assurance Program Policy 3.2 Engineering Assurance Department Procedure EAD-3, Design Process Reviews j
and Independent Technical Assessments i
3.3 Engineering Assurance Department Procedure EAD-6, Contracting and Admin-(
istering Third-party Design Assessments L
4.0 Definitions 4.1 Annual schedule - A list of subjects to be reviewed or assessed during a j
calendar year and the time frame during which these reviews / assessments l
are scheduled 4.2 Engineering Assurance Department engineer - A person in the Engineering Assurance Department having extensive engineering and design experience in his or her assigned discipline 5.0 Responsibilities 5.1 Manager, Engineering Assurance Department Approves the plans and schedules for design process reviews and techni-cal assessments
8905T0e UGr47QC 6 P0 vet 0 C0eiseas,y PA oc. arc.
na v. ave.
v NUCLEAR ENGINEERING & CONSTRUCTION PROCEDURES MANUAL EAD-2 2
T WL t past on Engineering Assurance Department Procedure 2
7 SUSst CT Catt essgg D Planning and Scheduling of Design Process Reviews
'-l-64 and Technical Assessments
" E""$-84 5.2 Engineering Assurance Department engineer Provides input to the list of topics deserving a comprehensive review, prepares plans and schedules for design process reviews and technical assessments, and resolves coments from South Texas Project Engineering R2 and Licensing Departments on the list of topics selected 6.0 Procedure 6.1 Preparation of a list of review / assessment topics The Manager, Engineering Assurance Department, or his designee shall prepare and maintain a list of topics deserving a comprehensive review.
Every six months this list shall be sent to the Manager, STP Engi-R2 neering, and the Manager, STP Licensing, for review and comment. To establish the review topics and priorities for review, the following guidelines can be used:
6.1.1 Select areas of review that represent the known technical problem areas in the industry.
6.1.2 Select areas that represent critical and complex analysis and design features and areas of known or suspected HL&P and/or con-tractor problems.
6.1.3 Select areas affecting safety, operability, and availability.
6.1.4 Select activities that require significant interfacing with NSSS vendor and other vendors supplying important equipment.
3.1.5 Select areas of analysis and design that provide input to subse-quent design of many systems and components (e.g., seismic analy-sis, sub-compartment and containment pressurization analysis followingapostulatedaccident).
6.1.6 Select representative samples of systems, the design and engi-R2 neering of which are essentially complete, to determine that system design from conception to construction has been carried l
out in a controlled manner.
6.1.7 Select topics for design process review in a manner that ad-dresses the various aspects of the design process (i.e., design input, interface, process, output, and changes) and provides a reasonable assurance of the adequacy of the design process.
I
esputt04 U 2=T c C & Powto ccew awv Pa c c. eco.
c.s v. ve.
NUCLEAR ENGINEERING & CONSTRUCTION PROCEDURES MANUAL EAD-2 2
$me e.ci e,
Engineering Assurance Department Procedure 3
7 SUS 4E CT Catt eBlut D Planning and Scheduling of Design Process Reviews 2-1-84 and Technical Assessments 8"' 1""y,'l-84 6.1.8 Select other topics of management concern.
6.2 Development of an annual schedule The Engineering Assurance Department staff shall develop an annual schedule for design process reviews and independent technical assess-ments and shall submit the schedule to the Manager, Engineering Assur-ance Department, for approval. Emphasis shall be placed on the topics of importance, and consideration shall also be given to project schedule and effective utilization of the Engineering Assurance staff. The annual schedule shall contain a description of the review subjects, extent of assessment, anticipated man-hours, and start and completion dates for the assessments.
6.3 Review, approval, and distribution of annual schedule The annual schedule shall be reviewed by the Vice President. Nuclear Engineering & Construction, and by other departments or reviewers deter-mined by the Manager, Engineering Assurance Department. After the annual schedule has been reviewed by the Vice President, Nuclear Engineering &
Construction, and approved by the Manager, Engineering Assurance Depart-ment, Engineering Assurance shall distribute the annual schedule to interested or affected organizations, including the South Texas Project
(
Engineering Department.
6.4 Preparation of detailed review / assessment plan and schedule 6.4.1 Design process reviews Design process reviews shall be scheduled and performed by Engi-neering Assurance Department engineers assigned by the Manager, Engineering Assurance Department. The objective of these reviews shall be to develop information by which to judge the adequacy of design controls on the basis of whether the results of the design activities of HL&P and its major contractors are correct and consistent with licensing comitments and represent good engi-neering practice.
In preparing a detailed plan and schedule for l
a review, the following items, as a minimum, shall be addressed:
6.4.1.1 Scope, duration, and detailed breakdown of the review activities 6.4.1.2 Start date and duration of review activities, identiff-cation and collection of documents to be reviewed prior to review, schedule of pre-review meetings, and prepara-l tion of review checklist e-
-.--w
,kw w,-e-,--e-..me..-m...-
e-,
.iv,
.r-+-,-,-
m..,-
,-,.----,.--e.w-,-r,,,.-
-.----w-.-ewe-<-
ve-rr..,.,,---,--
souston usata=c a powan cowasy en o c. =o.
ne. :.
NUCLEAR ENGINEERING & CONSTRUCTION EAD-2 2
PROCEDURES MANUAL 9 768 pagg og Engineering Assurance Department Procedure 4
7 SWSet C T DATE 'S&ut D Planning and Scheduling of Design Process Reviews E-1-84 and Technical Assessments
- t "*c u a 2-1-64 i
6.4.1.3 Schedule of post-review meeting and preparation, review.
j and approval of the review report 6.4.1.4 Projected man-hour requirements 6.4.2 Independent technical assessments Independent technical assessments shall be perfonned by Engineer-ing Assurance Department engineers assigned by the Manager, Engi-neering Assurance Department. The objective of these assessments shall be to provide independent verifications of designs. The Manager, Engineering Assurance Department, shall select the sys-tem or subject to be assessed and assign the most applicable Engineering Assurance Department discipline engineer (s) responsi-bility for developing a plan and schedule of assessment activi-ties with necessary inputs from the Engineering Assurance Department discipline engineers. The schedule of assessment activities shall be consistent with the completion dates speci-fied in the annual schedule. As a minimum, a detailed assessment plan shall include the following items:
6.4.2.1 Purpose, scope, special concerns, and areas to cover in the assessment 6.4.2.2 Detailed breakdown of the assessment activities indicat-ing extent of assessments and the verification method (i.e., independent analysis or review of existing engi-neeringcalculations) 6.4.2.3 List of documents required for assessment and the sched-ule for obtaining the documents 6.4.2.4 Preparation of assessment checklists 6.4.2.5 Schedules of pre-assessment meetings for information exchange and for identification of personnel contacts and level of activity anticipated in the assessment 6.4.2.6 Duration of all activities 6.4.2.7 Identification of various interfaces' l
I
sousto= v2=vec o towno cow:%v ea c e. =o.
ns v. we.
NUCLEAR ENGINEERING & CONSTRUCTION PROCEDURES MANUAL EAD-2 2
984 8 Pa G1 08 Engineering Assurance Department Procedure 5
7 SWtst CT Catt IS5pt D Planning and Scheduling of Design Process Reviews 2-1-84 and Technical Assessments
- " '"')"Y-84 1
6.4.2.8 Projected man-hour requirement and, for cases in which additional manpower is required from outside HL&P, identification of such requirements and the schedule of such activities to be perfonned by outside personnel under the direction of the HL&P Engineering Assurance Department engineers 6.4.2.9 Schedule of post-assessment meeting and preparation and review of fonnal review report l
6.5 Coordination of review / assessment plan with South Texas Project (STP)
Upon completion of the first draft of the detailed review / assessment plan, the responsible Engineering Assurance Department engineer (s) shall discuss the plan with STP Engineering to assure that the plan is consis-tent with the overall project schedule and that the engineering informa-l tion required for the review / assessment will be available.
6.6 Review, approval, and distribution of review and assessment plan For each review / assessment topic, the responsible Engineering Assurance Department engineer shall submit the detailed plan and schedule to the i
Manager, Engineering Assurance Department, at least thirty (30) days prior to the review / assessment initiation date for his review and approval. The Manager, Engineering Assurance Department, shall review the plan for its adequacy to meet the intended purpose and to assure consistency of the plan to meet the overall schedule of completion.
After the plan is approved by the Manager, Engineering Assurance Depart-ment, he shall distribute the plan to Project Engineering and other affected organizations as he determines.
7.0 Attachments 7.1 Procedure flow chart R2 l
7.2 Review / assessment scope and schedule cover sheet I
l
enoustoa. us me.c a po=En cowa=v Pace =o.
a s <. a c.
NUCLEAR ENGINEERING & CONSTRUCTION PROCEDURES MANUAL EAD-2 2
T vt s e.c.
e, Engineering Assurance Department Procedure 6
7 Susst cT C.T E Illut D Planning and Scheduling of Design Process Reviews 2-1-84 and Technical Assessments h I"",' ' a c-1-84.1 Procedure Flow Chart Engg Assur Dept prepares list of L
review / assessment C topics, develops annual schedule d
8 189r. STP Engg.
per.R. STP Licensg.
reviews and reviews and comuments on comunents on list of tocics list of tooies U
l VP.NE8;, reviews annual senedule, provides management input ir
' logr. Engg Assur Dept.
l approves anni schedule.
R2 assigns resp EA enge for plan development l
If j
responsible EA engineer prepares detailed plan.
discusses with STP re availability of engg docs l
l'
(
pegr. Engg Assur Dept.
reviews and approves I
review / assessment plan l
ses li I Engg Assur Dept distributes plan to STP I
l
0EDW5704 Leswishc c POWtQ CDe**ahv TC CC. 40 At v. NO.
NUCLEAR ENGINEERING & CONSTRUCTION EAD-2 2
PROCEDURES MANUAL s eis t raGt or 7
7 Engineering Assurance Department Procedure Suest CT cati Illut D Planning and Scheduling of Design Process Reviews 2-1-84 and Technical Assessments D't' t""$ia 2-1-84.2 Review / Assessment Scope and Schedule Cover Sheet l
1 I
SCOPE AND SCHEDULE FOR INDEPENDENT TECHNICAL A$$E$$ MENT (n m er)
(or THIRD-PARTY DE31GN A$$ES$M[NT _ or D[$1GN PROCES$ RIVIEW_)
R2 (subject) i Prepared by:
Date:
I 4
I 1
Approved by:
l I
I I
I l
1 i
.