Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20086B528 + (ML20086B528)
- 0CAN069508, Forwards Response to GL 95-03, Circumferential Cracking of SG Tubes + (ML20086B534)
- PY-CEI-NRR-1965, Forwards PNPP Simulator Four Yr Test Rept, Describing Performance Testing Conducted from June 1991 - June 1995, Including Discussion of Uncorrected Simulator Performance Test Failures & Schedule for Correcting Failures + (ML20086B538)
- ML20086B541 + (ML20086B541)
- ML20086B547 + (ML20086B547)
- ML20086B548 + (ML20086B548)
- PY-CEI-NRR-1966, Submits Update to Response to Followup RAI Re GL 92-08, Thermo-Lag 330-1 Fire Barriers, + (ML20086B555)
- NRC-95-4498, Forwards Proposed Draft/Markups of SSAR Section 18.4 & Subsection 18.9.9.Encl 1 Submitted as Proposed Response to Listed AP600 Draft Safety Evaluation Rept Chapter 18 Open Items + (ML20086B558)
- ML20086B568 + (ML20086B568)
- ML20086B572 + (ML20086B572)
- ML20086B573 + (ML20086B573)
- ML20086B574 + (ML20086B574)
- ML20086B591 + (ML20086B591)
- 05000277/LER-1991-033, :on 911015,drywell Pressure & Temp Increase Identified When High Pressure Coolant Injection Steam Supply Inboard Isolation Valve Stroked.Caused by Excessive Valve Packing Leakage Due to Gouged Stem + (ML20086B598)
- ML20086B599 + (ML20086B599)
- ML20086B606 + (ML20086B606)
- ML20086B608 + (ML20086B608)
- ML20086B611 + (ML20086B611)
- ML20086B612 + (ML20086B612)
- ML20086B624 + (ML20086B624)
- ML20086B625 + (ML20086B625)
- ML20086B629 + (ML20086B629)
- ML20086B633 + (ML20086B633)
- ML20086B637 + (ML20086B637)
- ML20086B642 + (ML20086B642)
- ML20086B649 + (ML20086B649)
- ML20086B652 + (ML20086B652)
- RC-95-0173, Provides Plant Response to GL 95-03 Re Circumferential Cracking of SG Tubes + (ML20086B666)
- RC-95-0175, Advises NRC That Plant Will Install Biometric Hand Reader Sys at All Entry & Exit Portals in Protected Area Access Facility During Fourth Quarter of 1995 + (ML20086B670)
- ML20086B671 + (ML20086B671)
- ML20086B680 + (ML20086B680)
- RBG-41645, Forwards Certificate of Insurance Verifying Property Policy for Protection Against Financial Losses Due to Nuclear Accidents for Plant + (ML20086B688)
- ML20086B691 + (ML20086B691)
- ML20086B696 + (ML20086B696)
- ML20086B702 + (ML20086B702)
- ML20086B706 + (ML20086B706)
- ML20086B712 + (ML20086B712)
- LIC-95-0126, Forwards Plant Response to GL 95-03, Circumferential Cracking of SG Tubes + (ML20086B720)
- ML20086B723 + (ML20086B723)
- LIC-95-0122, V 2 That Provides Addl Info Re Potential Effects of Elevated post-accident CCW Temp & Updates Status of Corrective Actions + (ML20086B725)
- 05000364/LER-1995-005, :on 950601,loss of electro-hydraulic Fluid Resulted in Manual Rts.Repaired & Selected Welds on Eh Sys of 2A & 2B SGFP + (ML20086B739)
- ML20086B741 + (ML20086B741)
- 05000272/LER-1976-030, Updated LER 76-030/03L:on 761228,during Sample Analysis of Boric Acid Storage Tanks 11 & 12,boron Concentration Noted Low.Cause Unknown.Chemical Analysis After Batching Confirmed Findings + (ML20086B749)
- 05000272/LER-1976-030-03, /03L:on 761228,sample Analysis of Boric Acid Storage Tank Boron Concentration Noted Low.Caused by Personnel Error in Analyzing Concentration + (ML20086B754)
- ML20086B756 + (ML20086B756)
- 05000272/LER-1976-029-03, /03L:on 770104,four on-the-spot Changes Discovered Not Reviewed within 14-day Tech Spec Requirement.Caused by Personnel Error.Daily Log Established + (ML20086B759)
- 05000272/LER-1976-028-01, /01T:on 761231,shift Supervisor Notified of Liquid Leak on Unit 2 Side of Auxiliary Bldg Dividing Wall.Caused by Inadvertent Opening of Boric Acid Sample Line Valves. Valves Closed + (ML20086B761)
- 05000272/LER-1976-027-03, /03L:on 761229,hydraulic Oil Leaked from MSIV 12, Rendering Valve Inoperable in Closed Position.Caused by Fractured Hydraulic Oil Line + (ML20086B763)
- 05000272/LER-1976-026-03, /03L:on 761225,boron Concentration Lowered Below Tech Spec Min & Rendered Boron Injection Tank Inoperable. Caused by Inadvertent Safety Injection Actuation + (ML20086B764)
- 05000272/LER-1976-025-03, /03L:on 761215,stuck Rod Moved to Maintain Reactor Critical While Measuring Stuck Rod Worth During Low Power Testing.Caused by Slight Overdilution of Reactor Coolant Boron Concentration + (ML20086B768)
- 05000272/LER-1976-024-03, /03L:on 761213,filter Failure Alarm Received on RMS Channel R11A (Containment/Plant Vent Air Particulate). Caused by Barber-Coleman Bearing Failure.Low Speed Drive Motor Replaced + (ML20086B771)