ML20086B625

From kanterella
Jump to navigation Jump to search
Revised Monthly Operating Rept for Mar 1991 for North Anna Power Station Unit 2
ML20086B625
Person / Time
Site: North Anna  
Issue date: 03/31/1991
From: Mladen C
VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.)
To:
Shared Package
ML20086B609 List:
References
NUDOCS 9111200295
Download: ML20086B625 (1)


Text

-.

.-.~ _

- ~ - -. - - -

=,

OPERAtlWG Bata t!P001 l

00Ctti ko.:

50 339 DAtt: April 1, 1991 COMeLLtID ST:

C. M(eden Pr06t (703) 894 2537 (REVISID) l OptRAtlhG STATUS 1.

Un i t h 6me t............................... m o r t h A nr.e 2 2.

R epor t i t o P e r i od t.........................M a r c h 1991 2653 3.

L ic ensed theru t Powe r (uwt ).............

947 4 nameplate toting (Gross N e).............

907 5.

Design tier.tricat Rating (Net Ne).......

6.

maatsun Dependable capacity (G.oss MWe)..

957 7.

mantenum Deoencable Capacity (het MWell....

909 8.

If changes occur in C6pacity Retirigs (Items ho. 3 thru ?) since test report, give reasons:

w/A 9.

Power levet to which restricted, if any (Net Ne): _ N/A N/A

10. Reasons for restrictions, if any This Month Y.t.0 C wulative 744.0 2,160.0 90,240.0
11. n our s i n R epor t i ng P er i od................................

744.0 2.160.0 73,294.3

12. hwcer of H ours t e et t er was C r i t i c a t.....................

0.0 0.0 5.949.6

13. Reactor Reserve Shutdown pours...........................

746.0 2,160.0 72.374.3

14. H our s G ene r a t or 0n L i ne..................................

0.0 0.0 0.0

15. Uni t t es erve shut down Hour s..............................
16. Gross thermal Energy Generat ed (wH)..................... 2.151.635.3 6,247.408.2 193.496,$21.6
17. Gross E l ectr ical E nergy Generat es (Mwn)..................

715,200.0 2,076.305.0 63,378,891.0

18. het Electr ical E nergy Gener ated (wn)....................

681,771.0 1,977,792.0 60,793,272.0 l 100.0%

100.c1 80.2%

19. Uni t s e rv i c e f ac t or...................,.................

100.0%

100.0%

80.2%

20. Unit Avaltability factor.................................
21. Unit Cacacity factor (using MDC Wet).....................

100.8%

100.7%

74.9%

22. Uni t Capac i ty f ac t or (us ing 014 h et )..'...................

101.C%

101.0%

74.3%

0.0%

0.0%

6.2%

23. Forced Outage Rate.......................................
24. Shutcowns Scheduled Over heat 6 Moriths (Type, Cate, and Durstion of tach):,,,,h0N t l

l

25. If $hutdown at end of Report Period, estimted time of Startuot N/A
26. Units in f ett Status (Prior to Camercial Operation):

Forecast Achieved INIf!At CRif!CAllTT IWillAL ELitfRICITY 9111200295 9111 is ~*"4L OPERA 110W

~

PDR ADOCK 05000338 Ft PDR

-