e.
VIRGINIA POWER COMPA1W NORTH ANNA POWER STATION HONTilLY OPERATING REPORT MONTH:
October YEAR 1991 Approved:
--*L, @
't: tion nanager n
9211 :00291 oniir
{DR ADOCK 0";O00$33 roR
C*tRATING DATA R(PC21 00Catt NO.:
50 318 Daft: November 1,1991 COMPLittD BT C. Mladen C#1R4fth0 STATUS 1.
Uni t k ame s................................ N or t h Ama 1 2.
R epor t i ng Per i od i,....................... 0C l otier 1991 3.
L ic ensed t hermi Power (MWt il.............
2,893 4.
Nameplate Reting (Gross MWe)t.............
947
$.. Design tiectrical Rating (het MWe)s.......
907
' 6.
maatsun Dependable Capacity (Gross MWe)..
959 7.
Maniwun Dependable Capacity (het MWell....
911 8.
If changes occur in Capacity Ratings (Iteee No. 3 thru 7) strwe last report, give reasonst N/A 9.
Power level to which restricted, if any (het MWe) _ N/A
- 10. Reasons f or restrictions, if anyt
,N / A this Month Yt0 cmulative i t. p ours i n R epor t i ng P er i od................................
745.0 7,296.0 117,108.0
- 12. Water o f Mour s R eac t or was Cr i t i ca t.....................
745.0 5,427.8 85,418.7
- 13. Reactor Reserve shutdown Hours...........................
0.0 108.6 6,712.2
- 14. Mours Generator 0n Line..................................
745.0 5,272.5 82,502.5
- 15. Unit Reserve shutdown Hours..............................
0.0 0.0 0.0
- 16. Gross Thermal Energy Generated (MWh)..................... 2,153,913.0 14,304,074.8 219,290,310.8
- 17. Gross E lect r i cal Energy Generated (MWH)..................
711,997.0 4,707,926.0 72,049,264.0
- 18. tot Electrical (nergy Generated (MWH)....................
678,283.0 4,472,344.0 68,201,096.0
- 19. Un i t S e r v i c e F a c t o r.....................................
100.0%
72.4%
70.4%
- 20. Uni t A val t abil i t y f ac t or.................................
.100.0%
72.4%
70.4%
- 21. Unit capacity factor (using MDC Net).....................
99.9%
67.3%
65.0%
- 22. Uni t Capac i t y f ac t or (using DE R h e t ).....................
100.4%
67.6%
64.2%
'23. forced Outage Rate.......................................
0.0%
11.2%
12.4%
- 24. thutda ns Sche. hated over Went 6 Months (Type, Date, and Duration of Each):
,,,,,,N one M4
. 25. If thutdown at Snd of Report Period, estimated tine of Startupt _,,,N/A
- 26. Units in fest $tabas (Prior to Conenercist Operation):
Forecast Achieved Ik1TIAL CRITICAL!YY INITIAL ELECTRIClif COMMERCIAL OPERA 110N
i AVERAGE DAILY UNIT POWER LEVEL Docket No.
50-338 Unitt NA-1 Dates November 1.
1991 Completed bys__C. Mladen Phones (703) 894-2774 MONTH: _Qqtsber 1991 DAY AVERAGE DAILY POWER DAY AVERAGE DAILY LEVEL LEVEL (MWe-Nat)
LEVEL (HWe-Net) 1 909 17 911 2
908 18 911 3
908 19 911 4
909 20 911 I
5 909-21 917 6
910 22 911 7
9.10 23 911 F
911 24 912 910 25 910 10 910 26 911 11 904 27 911-12 911 28 912 13 911 29 913 14 911 30 913 15 913 31 91) 16 909 Instructions:
On this format, list the average daily unit power invol in MWe-Not for each day in the reporting month.
Compute to the nearest whole megawatt.
UNIT SHUTDOWNS AND POWER REDUCTIONS r
t DOCKET NO.:
50-338 UNIT NAME:
NA-1 DATE: November 1, 1991 REPORT MONTH: October 1991 COMPLETED BY:
C. Mladen f
FROME:
(703) 894-2774 E
L
{
1 2
3 4
5 j
No.
Date Type Duration Reason Method of Licensee System Component Cause & Corrective (hrs)
Shutting Event Code Code Action to i
Down Reactor Report /
Prevent Recurrence
(
4 F
- *No entry this month.
E t
[
I 1: Type 2: Reason 3: Method 4:
1 F= Forced A= Equipment Failure (explain) 1= Manual Exhibit F - Instructions
(
S= Scheduled B= Maintenance or Test 2= Manual Scram for preparation of Data C= Refueling 3= Automatic Scram Entry Sheets for Licensee D= Regulatory Restriction 4= Continuations Event Report (LER) File l
E= Operator Training & License Examination 5= Load Reduction (NUREG-0161) j F= Administrative
?=Other j
G= Operational Error 5:
j H=Other (explain)
Exhibit H - Same Source l
I l
i r
i l
t t
Page 1
of __1 UNIT SHUTDOWN AND POWER REDUCTIONS Explanation Sheet Docket No.:
50-338 Report Month Octobqr Unit Namet NA-1 Yeart 1991 Dates November 1.
1991 Completed by:
Cathie Mladen
- No entry this month.
r l
l l
w
,--yy-y'%p
g e emg
---gy-mm a-gray avi-
=ys+
w
-s--wgw ev
'r
NORTH ANNA POWER STATION UNIT NO.I 1
MONTH October
SUMMARY
OL.DERhTllLG_32PIRLERCII Listed below in chronological sequence is a
summary of operating experian'es for this month which required load reductions or resulted in ato d fD 'nt non-load related incidents.
pa t_q JYyt p_n.in October 01, 1991 0000 Began month with unit at 100% power, 959MWe.
October 11, 199L 030$
Commenced unit ramp-down to 880MWe for TVFT.
0953 Unit stable at 880MWo.
?.948 TVFT completoa satisfactorily.
1050 Commenced unit ramp-up to 100%
power.
1200 Unit stable at 100%, 957MWo.
October 31, 1991 2400 Ended month with unit at 100% power, 956MWo.
_m_-_
_. - _ _ _ _ _ _. _ _ _ _ - - ~ _ _ _. _. _ _.. _ _ _ _ _ _ _ _ _ _ _ _ _. -
DPERAllWG j'A1 A R[ PORT 00Ctti NO.:
50 339 Daft: Noveeter 1,1991 COMPLt1[0 87:
C. Hladen FMONE: (703) 894 2774 OPtRAllWG $1ATUS 1.
Uni t W ome t................................ N or t h Ama 2 2.
R eport i ng Per f t-!s........................ 0c t ober 1991 3.
L icensed therne t Power t Wt ).............
2893 4.
Namepl a t e R at ing (Gross MWe):.............
947 5.
Design tiectrical Ratine (Net We).......
907 6.
M2alcun Dependable Capacity (Gross Me)..
957 7.
steninun Dependable Capacity (Net M.le):....
909 8.
If changes occur in Capacity Retirit (Items ho. 3 thru 7) since test report, give reasons:
,,N/A 9.
Power level to which restricted, if any (Net MWe): _ N/A_
- 10. Ressor,s for restrictions, if any:
N/A This Month YtD Ctmalative
- 11. Hours in Reporting Period................................
745.0 7,296.0 95,376.0
- 12. zuwser of Hours Reactor was criticat.....................
745.0 7,179.5 78,313.8
- 13. Rszetor Reserve shutdown Hours...........................
0.0 65.9 6,015.5
- 14. Wours Generator 0n Line..................................
745.0 7,117.3 77,361.6
- 15. Unit Reserve shutdown Hours..............................
0.0 0.0 0.0
- 16. Gross Thermet Energy Generateo (MWW)..................... 2,145,981.0 20,508,858.5 207,757,971.9
- 17. Gross E lect rical Energy Generat ed (MWM)..................
704,374.0 6,747,836.0 68,050,422.0
- 18. kat E lect r i c al Energy Genera t ed (MWN )..........
- 4........
669,958.0 6,417,935.0 65,233,415.0
- 19. Unit service Factor......................................
100.0%
97.7%
81.1%
- 20. Unit Availability Factor.................................
100.0%
97.7%
81.1%
- 21. Unit Capacity Factor (using MDC net).....................
98.9%-
96.8%
76.0%
- 22. Uni t Capaci ty F ac tor (using DER Net).....................
99.1%
97.0%
75.4%
- 23. Forced Outsee Rate.......................................
0.0%
2.3%
6.0%
24.~ Shutdowns St.heduled Over Nest 6 Months (type, Dete, and Duration of Each): _None
- 25. If Shutdown'at end of Report Period, estimatea time of startup:
W/A
- 26. Units in Test Status (Prior to Comercial Operation):
Forecast Achieved INiilAL CRITICAllif INITIAL ELECTRICITY COMMERCIAL OPERATION
- -.. ~
-.-. _. ~.
e AVERAGE DAILY UNIT POWER LEVEL Dock 6t No.:
50-339 Units NA-2 Dates Rqyggber 1.
199.1 completed by:
C __Mladen_____
Phone
_(,J E !94-2774 MONTH:
October 1991
-DAY AVERAGE DAILY POWER DAY AVERAGE DAILY LEVEL LEVEL (MWe-Net)
LEVEL (MWe-Net) 1 902 17 905 2
902 18 906 3
901 19 906 4
810 20 905 5
847 21 904 6
905 22 904 7
902 23 904 8
903 24 903 9
904 25 903 10 904 26 905 11 904 27 906 12 905 28 9Q5 13 904 29 904 14 905 30 905 15 906 31 904 16 905 Instructions:
On this format, list the average daily unit power level in MWe-Not for each day in the reporting month.
Compute to the nearest whole megawatt.
l 6
3.-~-. -
.,,c-my w
w-w y--r-*
- - " ~
~ l L
UNIT SHUTDOWNS AND POWER REDUCTIONS i
DOCKET NO.:
50-339 i
UNIT N7.ME:
NA-2' DATE: November 1, 1991 RErORT MONTH: October 1991 COMPLETED BY:
C..Mladen PHONE:
(703) 894-2774 j
l i
t.
i.
i i.
1 2
3 4
5 l
i No.
_ Date
' Type Duration Reason
. Method of Licensee System Component Cause & Corrective (hrs)
Shutting Event Code Code Actior. to Down Reactor Report #
Prevent Recurrence f'Woentrythismonth, f
I i
1 r
I I
1: Type 2:-Reason 3: Method 4:
i i :F= Forced A= Equipment Failure (explain) 1= Manual Exhibit F - Instructions i
lS= Scheduled B= Maintenance or Test-2= Manual Scram for preparation of Data i
C= Refueling 3= Automatic Scram Entry Sheets for Licensee D= Regulatory Restriction 4= Continuations Event Report (LER) Fir -
i e
E= Operator Training & License Examination 5= Load Reduction (NUREG-Ol61)
F= Administrative.
9=Other I
G= Operational Error 5-I H=Other (explain)
Exhibit H - Same Source
[
i
{
?
I f
y.
%~
Page 1
of 1
l UNIT SHtlTDOWN AND POWER REDUCTIONS Explanation Sheet Docket No.:
50-339 Report Month October Unit Names NA-2 Years
- 1991_,
Dates ILqyrmber 1.
1991 Completed by:
Cathie Mladen
- No entry this month.
f
}
<--r
-w, s===
w
-,,e
--w..
.,m,s, e
m
.-r-<
- - - - - - < ~. - -
-4.,-
- - = - - -
NORTH ANNA POWER STATION UNIT N3.
2 MONTH:
OctobpL
SUMMARY
OP_QLEBATD19_IXP.IB.IIH.C3 Listed below in chronological sequence is a
summary of operating experiences for this month which required load reductions or resulted in significant non-load related incidents.
Data TIM DAIA October 01, 1991 0000 Began month with unit at 100% power, 951MWe.
October 03, 1991 2310 Commenced unit ramp-down to approximately 90%
power for condenser waterbox removals.
2350 Unit stable at 92% power, 880MWo.
October 05, 1991 1324 Commenced unit ramp-up to 100% power following condenser waterbox maintenance.
1425 Unit stable at 100% power, 942MWo.
October 31, 1991 2400 Ended month with unit at 100% power, 948MWo.