ML20086B629
| ML20086B629 | |
| Person / Time | |
|---|---|
| Site: | North Anna |
| Issue date: | 04/30/1991 |
| From: | Mladen C VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.) |
| To: | |
| Shared Package | |
| ML20086B609 | List: |
| References | |
| NUDOCS 9111200298 | |
| Download: ML20086B629 (1) | |
Text
-
OP(R Af tk0 C AT A REPORT DOCKET h0.
50 339 ay 1, 1991 DAt[: w COMPLETED SY:
C. Miacen PH0hE: (723) $94' 2 7I4
( RINISED )
OPER AllW. ST ATUS i
.mit kames.....................
,,korth Anna 2 2.
4eocrttr.g Pericci.........
.Acrtl 1991 3.
,icensec Thermat Power (MWt):.
2373 e.
sameetate Rating (Cross Ne):
947
- esign E lect rical Rat ing (tet Mwe)
- .....
907 r
6.
- antmm Depenocole Capacity (cross Mwe):..
957 wanim e Decencable Caca, sty (Aet MWe)1..
909 3.
- C9anges cccur in capacity Gattegs (lte*s ho. 3 teru 71 s ece tast report. Ove reauns:
o N/A
\\
9 Power tevet to i.nich restrict <c. if sny (het Mwe): _ N/A
'O. Seasons ter restrictions, it any:
%/A This Montn YtD CJiutattve Curs in Feporting Pertoa.....
719.0 2.579.0 90,V59.0
'2. sner of Mours Reactor was Critical.
719.0 2.8 79.0 74.013.3
- !. Seactor Reserve snutco n u urs..
0.0 0.0 5,949.6
';. a urs Generator On u ne..
719.0 2,379.0 73.113.3 ntt Reserve Shutcown Hours.....
0.0 0.0 0.0 tt, Crcss Thermal Energy Generatec (wwM).
2,079,259.4 8.326.697.t, 195,575,311.0 17 Cross Electrical Energy Generates (NN)...
690,195.0 2.766,500.0 64,069.086.0 t!. het Electrical Energy Generatec (MWO.
e57,260.0 2,635.652.0 61,451,132.Of
?9. Lnit Service f actor...
100.0%
100.07.
80.4%
2 3. Lni t Ava t t abil i t y F act or...................
100.0%
100.0%
80.4%
- 21. Lnt t Capac i t y F ac t or ( us i ng MDC he t )....
100.7%
100.7%
75.1%
- 22..ntt Cacacity f actor (using DER Net)...
100.9%
100.9%
74.5%
- 13. F orces Out age R at e........
0.0%
0.0%
6.1%
- 24. 5 wtcowns schecutec Over Neat 6 Months tivpe, Date, and Durat ton of f acn): _ hone 91112OO29E. 911115 DP ADOC.< 05000338 PDR E5. If thGcown at 9no of Report Perioc, estimates time of Startuc:
N/A
- 16. Lnits in Test status (Prior to Ccmercial Operetten):
Forecast Acnievec 1 NIT 1 A1. CRITICAL,lTY thit!AL ELECTRICITY w
COMMERC4A1 CFERAfl0N
?(e.
L__ -
- - - - - - - -