ML20086B633
| ML20086B633 | |
| Person / Time | |
|---|---|
| Site: | North Anna |
| Issue date: | 05/31/1991 |
| From: | Mladen C VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.) |
| To: | |
| Shared Package | |
| ML20086B609 | List: |
| References | |
| NUDOCS 9111200300 | |
| Download: ML20086B633 (1) | |
Text
.
OrtR AflhG C AT A REP 0f f 00CKrf 60.2 50 339 C Ah : a e 3. 1991
- DMPLETED BY!
C. Mlace.
PH06E: (703) 894 2774 (REVISED)
OPERAflhG STATUS 1.
. net hames..........................
....korth Anna 2 2.
teoorting Periocs.............
......may 1991 3.
. icenseo thermet Power (Mwt ):....
2893 e.
hamentate Rating (Gross mwelt.....
947 5 ;esign Electrical A sting t het awe):.......
907 c.
waa nun Depercapte Capacity (Gross mwe):..
957
- asinri DepenaaDie Casacity thet rwel:
909 3.
- t enanges occur in Capacity istings t;tems ho. 3 thru 7) since t est report, give reatens
%/A 9.
Power tevet to wnich restrictec. if any (het Mwe): _ 4/A
- 10. Seasons f or restrictiwns.. i f any:
N/A this month
- 0 CJ'tJt a t iv e 11
.t our s i n R e po r t i ng P e r t oc................................
744.0 3.623.0 91.703.0
'2. troer of >0urs teactor was criticat..
744.0 3,623.0 74.757.3
- 13. Reactor Reserve Shutoewn Hours...........................
0.0 0.0 5.949.6
- 4. eiours tenerator on Linc...
744.0 3,?23.0
'3,857.3 9 5. Un: t R es e rve shut oown m ours............................
0.0 O.0 0.0
- S. Cross thermat Energy Generatea twuM)......
2,148.226.1 0,474,923,7
'97.724.037.1
- 17. Gross E lectrical Energy Generat ed (MW).................
704,321.0 3,470,821.0 64,773,407.0
- 18. het ElectH cal Energy Generated (MVM)....................
669,930.0 3,305,582.0 62,121,062.0l
- o,'anit fervice Factor........
100.0%
100.0%
S0.5%
....ni t A.a t t ao t t i t y r ec tcr.
100.0%
100.C%
~ 80.5%
- 21. Uni t tapac i ty Fac tor (us i ng MDC he t ).....................
99.1%
100.4%
75.3 %
- 22. Uni t Capac i ty F ac t or ( us i ng D E R 4 e t ).....................
99.3%
100,6%
74.7%
- 23. Forceo Outage Rate........
0.0%
0.0%
6.0%
i 2. Snutoowns Scheautec Over heat ti Montns (Type, Date, and Duration of Eacn): g one
- 15..t Sautcown at end of Reoort perico, est mitec time of Startuos 4/A
- 26. units in test status (Prior to careeretal Operation):
Forecast ACnteved
- wittAL :e m :ALl'Y INIf!AL ELECTRICITY CDPMERCI AL OPER ATION 9111200300 911115 PDR ADOCK 050GO33G R
.