ML20086B633

From kanterella
Jump to navigation Jump to search
Revised Monthly Operating Rept for May 1991 for North Anna Power Station Unit 2
ML20086B633
Person / Time
Site: North Anna  
Issue date: 05/31/1991
From: Mladen C
VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.)
To:
Shared Package
ML20086B609 List:
References
NUDOCS 9111200300
Download: ML20086B633 (1)


Text

.

OrtR AflhG C AT A REP 0f f 00CKrf 60.2 50 339 C Ah : a e 3. 1991

DMPLETED BY!

C. Mlace.

PH06E: (703) 894 2774 (REVISED)

OPERAflhG STATUS 1.

. net hames..........................

....korth Anna 2 2.

teoorting Periocs.............

......may 1991 3.

. icenseo thermet Power (Mwt ):....

2893 e.

hamentate Rating (Gross mwelt.....

947 5 ;esign Electrical A sting t het awe):.......

907 c.

waa nun Depercapte Capacity (Gross mwe):..

957

  • asinri DepenaaDie Casacity thet rwel:

909 3.

t enanges occur in Capacity istings t;tems ho. 3 thru 7) since t est report, give reatens

%/A 9.

Power tevet to wnich restrictec. if any (het Mwe): _ 4/A

10. Seasons f or restrictiwns.. i f any:

N/A this month

    • 0 CJ'tJt a t iv e 11

.t our s i n R e po r t i ng P e r t oc................................

744.0 3.623.0 91.703.0

'2. troer of >0urs teactor was criticat..

744.0 3,623.0 74.757.3

13. Reactor Reserve Shutoewn Hours...........................

0.0 0.0 5.949.6

4. eiours tenerator on Linc...

744.0 3,?23.0

'3,857.3 9 5. Un: t R es e rve shut oown m ours............................

0.0 O.0 0.0

  • S. Cross thermat Energy Generatea twuM)......

2,148.226.1 0,474,923,7

'97.724.037.1

17. Gross E lectrical Energy Generat ed (MW).................

704,321.0 3,470,821.0 64,773,407.0

18. het ElectH cal Energy Generated (MVM)....................

669,930.0 3,305,582.0 62,121,062.0l

  • o,'anit fervice Factor........

100.0%

100.0%

S0.5%

....ni t A.a t t ao t t i t y r ec tcr.

100.0%

100.C%

~ 80.5%

21. Uni t tapac i ty Fac tor (us i ng MDC he t ).....................

99.1%

100.4%

75.3 %

22. Uni t Capac i ty F ac t or ( us i ng D E R 4 e t ).....................

99.3%

100,6%

74.7%

23. Forceo Outage Rate........

0.0%

0.0%

6.0%

i 2. Snutoowns Scheautec Over heat ti Montns (Type, Date, and Duration of Eacn): g one

15..t Sautcown at end of Reoort perico, est mitec time of Startuos 4/A
26. units in test status (Prior to careeretal Operation):

Forecast ACnteved

wittAL :e m :ALl'Y INIf!AL ELECTRICITY CDPMERCI AL OPER ATION 9111200300 911115 PDR ADOCK 050GO33G R

PDR

.