Text
4 I
OPERATING DATA REPCai DOCKET No.:
50 339 DATEt September 1, 1991 COMPLETEC BT C. Mladen PHONE: (703) 894 2774 (REVISED)
OrERATING STATUS 1.
Uni t N ame r................................ N or t h Anna 2 2.
R epor t i ng P er i od t......................... Augus t 1991 3.
Licensed Thermal Power (MWt)t.............
2293 4.
Nameplate Rat ing (Cross MWe).............
947 5.
Design Electrical Rating (Net MWe):.......
907 6.
ManinJa Dependable capacity (Cross MWe):..
957
- 7. - Maximum Dependable Capacity (Net MWe)....
909 8.
If changes A cur ir Capacity Ratings (Items No. 3 thru 7) since last report, give reasonst N/A 9.
Power level to which restricted, if any (Net MWe): _ N/A
- 10. Reasons for restrictions, if any:
N/A This Month YtD Cumulative
- 11. Hours i n R eport i ng P er i od................................
744,0 5,831.0 93,911.0
- 12. Numr of Hours Reactor was Cri t ical.....................
744.0 5,831.0 76,965.3
- 13. Reactor Reserve Shutdown Hours...........................
0.0 0.0 5,949.6
- 14. Hours Generator 0n-Line..................................
744,0 5,831.0 76,065.3
- 15. Urtt t Reserve shutdown Hours..............................
0.0 0.0 0.0
- 16. Gross Thermst Energy Generat ed (MWH )..................... 2,151,496.2 16,860,445.4 204,109,558.8
- 17. Cross E t e rt ri cal Energy Generat ed (MW0..................
701,628.0 5,558,789.0 66,861,375.0
- 18. Net Electrical Energy Generated (MWW)....................
666,245.0 5,288,957.0 64,104,437.0 l
- 19. Unit Service Fertur......................................
100.0%
100.0%
81.0%
I
- 20. Unit Availability factor.................................
100,0%
100.0%
81.0%
- 21. Unit capacity Factor (using G C Net).....................
98.5%
99.8%
75.9%
l
- 22. Unit Capaci ty F actor (using DE R Net).....................
98.7%
100.0%
75.3%
- 23. Forced Outage Rate.......................................
0.0%
0.0%
5.9%
l l
- 24. Shutdowns Tcheduled Over West 6 Months (Type, Date, and Duration of Each): _None
~
l i
- 25. If Shutdown at end of Report Period, estimated time of Startup:
N/A
' 26. Units in Test Status (Prior to Comercial Operation):
Forecast Achieved l
INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION 9111200309 911115 PDR ADOCK 03000338 R
-