Revised Monthly Operating Rept for June 1991 for North Anna Power Station Unit 2
ML20086B642
Person / Time
Site: North Anna  
Issue date: 06/30/1991
From: Mladen C
VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.)
To:
Shared Package
ML20086B609 List:
References
NUDOCS 9111200304
Download: ML20086B642 (1)


Text

_

.e i

j OPERATING DATA REPORT I

i DOCKET NO.:

50 339 DATE: July 8. 1991 COMPLETED B1:

C. Mladen PHONE:- (703) 894 2774

( RlWISED )

OPERATIkG ST Atus

.1 Unit Names.............................

w h Anna 2 2.

Reporting Periods......................... June 1991

, 3.

L i c ens ed T herms l Power (MWt )............,

2893 4 Namentate Rating (Gross MWe):,,...........

947 5.

Design Electrical Rating (Net Mwe):.......

907 6.

Maatsuo Depencable Capacity (Gross Mue)t..

957 7 Maninun Depencable Capscit y (Net Mue):....

909 8.

If changes occur in capacity Ratings Altems ko. 3 thru 7) since test report, give reasors

_N / A 9 Power tevet to which restricted, if any (het Mue): _ N/A

10. Reasons for restrictions, if anyt n/A This Month Tt0 Cunulattve
11. H our s in R epor t i ng P er i od................................

720.0 4,343.0 92.423.0

12. hwr>er of Itours Reactor was Critical.....................

720.0 4,343.0 75.477.3

13. R eac tor R eserve shutoown pours...........................

0.0 0.0 5,949.6

14. Hours Generate on Line..................................

720.0 4,343.0 74,577.3

15. Uni t R es e rve 16 ut oown M our s..............................

0.0 0.0 0.0

16. Gr os s Thermal Energy Genera t ed (MwH )..................... 2,C82,244,6 12,557,168.3 199,806,281.7
17. Gross E lect rical Energy Generatec (MWM)..................

683,868.0 4,154.6D.0 65,457,275.0

18. het E lectrical Energy Generat ec (MvH)....................

649,734.0 3,955,316.0 62,770.796.0 l

19. Unit service factor......................................

100.0%

100.0%

80.7%

20. Unit Avaltability Factor................................

100.0%

100.C%

50.7%

21. Unit Caoacity Factor (using MDC Net).....................

99.3%

100.2%

75.5%

22. Uni t Capaci ty f act or Ni ng DE R Ne t ).....................

99.5%

100.4%

74.9%

23. Forcea Outege Rate.......................................

0.0%

0.0%

6.0%

24. Shutcowns scheauled Over Meat 6 Months (Type. Cate 'and Duration of Each): _None
25. If Shutdown at end of Report Period, estimated time of Startuo:

N/A

26. Units in f est Status (Prior to Conenercist Operation):

Forecast Achievec INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCI AL CFERATION