N OPERATING DATA REPC21 i
00CKEY h0.3 50-339 DATE: August 1, 1991 COMPLETED BY:
C. Mladen PHONE: (703) 894 2774 (REVISED)
OPERATING STATUS 1.
Unit Names................................ North Anna 2
- 2.. Reporting Periods................,........ July 1991 3.
Licensed Thersial Power (MWt).............
2893 4 Nameplat e R at ing (Cross MWe):.............
947
'5.
Design Electrical noting (het MWe):.......
907 6.
Maxiam Dependable capacity (Gross MWe):..
957 7.
Mantoun Dependable Capacity (Net MWe)....
909 8.
If changes occur in Capacity Ratings (l' ems No. 3 thru 7) since test report, give reascos:
N/A 9.
Power levet to which restricted, if any (Net MWe): _ N/A
- 10. Reasons for restrictions, if any:
N/A_,,
This Month T*t D Cumulative
- 11. Hours in Reporting Period................................
744.0 5,087.0 93,167.0
- 12. Nmber of Hours Reactor was Critical.....................
744.0 5,087.0 76,221.3
- 13. R esc tor R eserve Shutdown Hours...........................
0.0 0.0 5,949.6
- 14. Hours Generator 0n Line..................................
744.0 5,087.0 75,321.3 l
- 15. Unit Reserve Shutdown Hours..............................
0.0 0.0 0.0
- 16. Gross Thermal Energy Generated (MWH)..................... 2,151,780.9 14,708,940.2 201,95E,062.6
- 17. Gross Electrical Energy Generated (mum)..................
702,472.0 4,857,161.0 66,159,747.0
.18. Net E l ec t r ical Energy Generat ed (HWH )....................
667,3 %.0 4,622,712.0 63,438,192.0f
- 19. Unit service factor......................................
100.0%
100.0%
80.8%
- 20. Unit Availability Factor.................................
100.0%
100.0%
80.8%
- 21. Unit Cepacity Factor (using MDC Net).....................
98.7%
100.0%
75.7%
- 22. Unit Capacity Factor (using DER Net).....................
98.9%
100.2%
75.1%
- 23. Forced Outage Rate.......................................
0.0%
0.0%
.1.9%
- 24. Shutdowns Scheduled over Next 6 Months (Type, Date, and Duration of Each): _None l
- 25. If thutdown at end of Report Period, estimated tinie of Startup N/A
(
- 26. Units in Test Status (Prior to Coninercial Operation):
Forecast Achieved t
j.
INITIAL CRITICALITY l
INIf!AL ELECTRICITY COMMERCIAL OPERAlloN 9111200307 911115 l'
PDR ADOCK 05000338 l
R PDR