Revised Monthly Operating Rept for Jul 1991 for North Anna Power Station Unit 2
ML20086B649
Person / Time
Site: North Anna  
Issue date: 07/31/1991
From: Mladen C
VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.)
To:
Shared Package
ML20086B609 List:
References
NUDOCS 9111200307
Download: ML20086B649 (1)


Text

.-

. ~.,

~.

N OPERATING DATA REPC21 i

00CKEY h0.3 50-339 DATE: August 1, 1991 COMPLETED BY:

C. Mladen PHONE: (703) 894 2774 (REVISED)

OPERATING STATUS 1.

Unit Names................................ North Anna 2

2.. Reporting Periods................,........ July 1991 3.

Licensed Thersial Power (MWt).............

2893 4 Nameplat e R at ing (Cross MWe):.............

947

'5.

Design Electrical noting (het MWe):.......

907 6.

Maxiam Dependable capacity (Gross MWe):..

957 7.

Mantoun Dependable Capacity (Net MWe)....

909 8.

If changes occur in Capacity Ratings (l' ems No. 3 thru 7) since test report, give reascos:

N/A 9.

Power levet to which restricted, if any (Net MWe): _ N/A

10. Reasons for restrictions, if any:

N/A_,,

This Month T*t D Cumulative

11. Hours in Reporting Period................................

744.0 5,087.0 93,167.0

12. Nmber of Hours Reactor was Critical.....................

744.0 5,087.0 76,221.3

13. R esc tor R eserve Shutdown Hours...........................

0.0 0.0 5,949.6

14. Hours Generator 0n Line..................................

744.0 5,087.0 75,321.3 l

15. Unit Reserve Shutdown Hours..............................

0.0 0.0 0.0

16. Gross Thermal Energy Generated (MWH)..................... 2,151,780.9 14,708,940.2 201,95E,062.6
17. Gross Electrical Energy Generated (mum)..................

702,472.0 4,857,161.0 66,159,747.0

.18. Net E l ec t r ical Energy Generat ed (HWH )....................

667,3 %.0 4,622,712.0 63,438,192.0f

19. Unit service factor......................................

100.0%

100.0%

80.8%

20. Unit Availability Factor.................................

100.0%

100.0%

80.8%

21. Unit Cepacity Factor (using MDC Net).....................

98.7%

100.0%

75.7%

22. Unit Capacity Factor (using DER Net).....................

98.9%

100.2%

75.1%

23. Forced Outage Rate.......................................

0.0%

0.0%

.1.9%

24. Shutdowns Scheduled over Next 6 Months (Type, Date, and Duration of Each): _None l
25. If thutdown at end of Report Period, estimated tinie of Startup N/A

(

26. Units in Test Status (Prior to Coninercial Operation):

Forecast Achieved t

j.

INITIAL CRITICALITY l

INIf!AL ELECTRICITY COMMERCIAL OPERAlloN 9111200307 911115 l'

PDR ADOCK 05000338 l