Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20085L021 + (ML20085L021)
- ML20085L023 + (ML20085L023)
- ML20085L025 + (ML20085L025)
- ML20085L031 + (ML20085L031)
- ML20085L032 + (ML20085L032)
- RC-95-0145, Application for Amend to License NPF-12.Amend Would Revise SR 4.6.1.2 to Delete Schedular Requirements for Type a Testing + (ML20085L037)
- ML20085L039 + (ML20085L039)
- ML20085L041 + (ML20085L041)
- ML20085L046 + (ML20085L046)
- 05000416/LER-1995-004, :on 950316,reactor Scram Occurred During Performance of Semiannual Surveillance on Neutron Monitoring Sys.Caused by Ground Fault on Min Flow Valve for Rcics. Ground Eliminated & Valve Returned to Svc + (ML20085L048)
- ML20085L049 + (ML20085L049)
- ML20085L050 + (ML20085L050)
- ML20085L055 + (ML20085L055)
- RBG-16-157, Interim Deficiency Rept DR-103.Investigation Ongoing.Interim or Final Rept Will Be Provided by 831129 + (ML20085L061)
- BVY-91-108, Responds to Weaknesses/Concerns Noted in Team Insp Rept 50-271/91-80 Re Proposed motor-operated Valve Program,Per Generic Ltr 89-10.Corrective action:motor-operated Valve Program Will Be Revised by 920601 to Address Generic Ltr + (ML20085L063)
- ML20085L065 + (ML20085L065)
- ML20085L070 + (ML20085L070)
- RC-95-0157, Advises That SA Byrne Now General Manager,Nuclear Plant Operations,Effective 950605.NRC Distribution Re Orignial Documents Should Be Updated Accordingly + (ML20085L072)
- ML20085L073 + (ML20085L073)
- ML20085L078 + (ML20085L078)
- ML20085L088 + (ML20085L088)
- ML20085L091 + (ML20085L091)
- ML20085L098 + (ML20085L098)
- ML20085L102 + (ML20085L102)
- ML20085L110 + (ML20085L110)
- ML20085L112 + (ML20085L112)
- ML20085L114 + (ML20085L114)
- ML20085L116 + (ML20085L116)
- ML20085L122 + (ML20085L122)
- ML20085L127 + (ML20085L127)
- ML20085L132 + (ML20085L132)
- ML20085L134 + (ML20085L134)
- NPL-95-0284, Forwards Revised SBO Evaluation for Installation of Addl EDGs at Pbnp,Per Discussions W/Nrc in Dec 1994 + (ML20085L136)
- ML20085L143 + (ML20085L143)
- ML20085L149 + (ML20085L149)
- ST-HL-AE-5098, Responds to Violations Noted in Insp Repts 50-498/95-08 & 50-499/95-08.Corrective Actions:Reviewed Trending Program Re Instruments Not Covered by TSs + (ML20085L159)
- ML20085L160 + (ML20085L160)
- ML20085L168 + (ML20085L168)
- BECO-LTR-95-066, Advises of No Changes to QA Program Description During Period Jul 1994 - June 1995 + (ML20085L169)
- ML20085L172 + (ML20085L172)
- ML20085L175 + (ML20085L175)
- ML20085L177 + (ML20085L177)
- BECO-LTR-95-067, Requests Exemption from 10CFR73.55(d)(5) Requirements for Physical Protection Against Radiological Sabotage + (ML20085L179)
- 05000237/LER-1983-065-03, /03L-0:on 830917,scram Discharge Vol Vent Valve 2-0399-534 Found Locked Closed Instead of Locked Open.Caused by Valve Left Open During Previous Scram Discharge Vol Test DOS 300-7.All Locked Valves Checked + (ML20085L181)
- ML20085L182 + (ML20085L182)
- ML20085L183 + (ML20085L183)
- B15241, Application for Amend to License NPF-49,relocating Requirements of Spec 3.6.6 for Main Steam Line Isolation Valves (Msivs) to Spec 3.7.1.5, Msivs + (ML20085L185)
- ML20085L187 + (ML20085L187)
- ML20085L190 + (ML20085L190)
- 05000305/LER-1983-019-03, /03L-0:on 830916,component Cooling Water Pump 1A Taken Out of Svc on 3 Separate Occasions to Perform Corrective Maint on Inboard Bearing Oil Seal Leak.Caused by Misalignment of Motor to Pump.Pump Realigned + (ML20085L192)
- 05000333/LER-1991-020, :on 910925,fire Door in App R Barrier Between Turbine Bldg & Radwaste Bldg Found W/Latch Mechanism Taped, Preventing Latching of Door.Caused by Human Error. Firewatch Posted & Door Repaired & Tested + (ML20085L193)