ML20085L183

From kanterella
Jump to navigation Jump to search
Forwards Revs 1 & 2 to Physical Security Plan.Revs Withheld
ML20085L183
Person / Time
Site: 05000124
Issue date: 09/27/1983
From:
VIRGINIA POLYTECHNIC INSTITUTE & STATE UNIV., BLACKSB
To: Carlson D
NRC OFFICE OF NUCLEAR MATERIAL SAFETY & SAFEGUARDS (NMSS)
References
NUDOCS 8310210299
Download: ML20085L183 (1)


Text

,

- ro-/M college OF ENGINEERING h h) VIRGINIA POLYTECHNIC INSTITUTE AND STATE UNIVERSITY Blacksburg, Virginia 24061 NUCLEAR REACTOR LABORATORY s

September 27, 1983 Don Carlson Fuel Facility Safeguards Licensing Branch Division of Safeguards Washington, D.C. 20555

Dear Mr. Carlson:

We are requesting that the enclosed changes to our Physical Security Plan (Rev. 1 & 2) be reviewed and approved. Neither revision 1 or revision 2 pose a degradation in our Security Plan.

Revision 1 details changes in the administrative organization as well as upgrade of security devices, most obvious the Neutron Activation Laboratory (Rm. 106) from breakwire to window foils. Revision 2 en-compassesa change in SNM identification and an adminstrative control decreasing the total amount of SNM allowed on site to less than 5.0 kilograms.

These changes in our .Sysical Security Plan have been reviewed by our Reactor Safety Sub-Committee and they determined, as have we, that there is no degrading of our Physical Security Plan with the implementation of these changes.

Sincerely, LL 0 &bQ smw enclosures (8)

B310210299 830927 PDR ADOCK 05000124

/ ) I

\

F PDR