t.*
GPU Nuclear Corporation g
gf Post Office Box 480 Route 441 South Middletown, Pennsylvania 17057 0191 717 944 7621 TELEX 84 2386 Writer's Direct Dial Nurnbe.r:
October 5,1983 5211-83-278 Dr. Thomas E. Murley Region I, Regional Administrator U. S. Nuclear Regulatory Commission 631 Park Avenue King of Prussia, PA 19406
Dear Sir:
Three Mile Island Nuclear Station, Unit 1 (TMI-1)
Operating License No. DPR-50 Docket No. 50-289 Notice of Violation Response Attachment A to this letter is GPUN response to Appendix A of Inspection Report 50-289/83-23 " Notice of Violation".
This report is being submitted late in accordance with notification provided to NRC Resident Inspector, R. Conte, on October 4, 1983.
Sincerely,
. D. Hukill Director, TMI-1 i
HDH:CJS:vjf Attachment cc:
R. Conte Sworn and Subscribed to Before me this 5th day of October
,1983.
1 l
l W ha-to % A ms-1 Notary Public 4
DARLA JfAN Bf24Y Nui Ahi 'L@..
MIDDLETOWN BORO. DAUPHIN COW MY COMMISSION CAPIRIS JUNE 17 &
Member. Pennsytvania Association of 88otanes l
l B310210283 831014 PDR ADOCK 05000289 G
PDR GPU Nuclear Corporation is a subsidiary of the General Public Utilities Corporation
\\
i ATTACHMENT A FINDING:
10 CFR 50, Appendix B, Criterion V and the GPU Nuclear Corporation Operational Quality Assurance Plan, Section 6.11, require, in part, that activities affecting quality be accomplished in accordance with instruc-tions, procedures,or drawings.
Contrary to the above, as of July 8,1983, an activity affecting quality was not performed in accordance with procedures in that pipe support anchor bolts associated with Task RM-13H were not installed in accordance with GPU Specification SP-110lX-503, Revision 3, and Mechanical Corrective Procedure 1410-Y-61, Revision 0 resulting in selected anchor bolts being located less than 16 stud diameters from the edge of a concrete surface.
This is a Severity Level V violation (Supplement I).
RESPONSE
I.
Corrective Steps Taken and Results Achieved l
l Following the NRC inspection in which the violation was noted, Quality Control l
(QC) reinspected the pipe supports associated with Task RM-13H.
Nineteen (19) supports were found to have anchors which deviated from procedural spacing requirements.
Types of spacing deviations include anchor to concrete edge, anchor to embedded items, and anchor to anchor.
The non-conformances were documented on Material Non-Conformance Report Number 0201-83; engineering evaluation determined that sixteen of the supports are acceptable as-is with the remaining three supports requiring rework.
Although the installer was responsible for determination of exact support locations, most of the anchor spacing conditions were pre-determined by specified support spacing criteria, pipe elevations, and routing in close proximity to wall penetrations, embedded items and other equipment.
Devia-i tion from procedural anchor spacing requirements was unavoidable in many I
cases.
II.
Corrective Steps Which Will Be Taken to Avoid Further Violation Production personnel will be instructed to obtain engineering evaluation and direction prior to anchor installation in order to prevent recurrence of the violation.
Engineering personnel will be instructed to be more thorough I
in their as-built verifications and QC personnel will be instructed to be more thorough in their final turnover inspections."
III.
Date When Full Compliance Will Be Achieved i
Full compliance will be achieved by October 15, 1983.
l l
1 1
--