Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20080J596 + (ML20080J596)
- ML20080J597 + (ML20080J597)
- 05000331/LER-1984-001, :on 840107,feedwater Recirculation Valve B, Failed Open,Decreasing Feedwater Flow to Vessel.Caused by Error in Performing Surveillance Test Procedure.Both Valves Repaired.Test Procedure Revised + (ML20080J598)
- ML20080J606 + (ML20080J606)
- U-602414, Forwards Summary Description of Proposed Vehicle Control Measures & Results of Vehicle Bomb Comparison.Encl Withheld + (ML20080J607)
- ML20080J608 + (ML20080J608)
- 05000361/LER-1983-110, Forwards LER 83-110/01T-0 & 83-048/01T-0 + (ML20080J610)
- U-602411, Forwards Rev 18 of Plant Physcial Security Plan.Encl Withheld + (ML20080J616)
- ML20080J617 + (ML20080J617)
- 05000361/LER-1983-110-01, /01T-0:on 830821,train B Emergency Chiller E-335 Failed to Start.Caused by Fuse Failure.Correct Size Fuse Installed + (ML20080J618)
- ML20080J621 + (ML20080J621)
- 05000361/LER-1983-048-01, /01T-0:on 830821,train B Emergency Chiller E-335 Failed to Start.Caused by Fuse Failure.Correct Size Fuse Installed + (ML20080J624)
- ML20080J627 + (ML20080J627)
- ML20080J629 + (ML20080J629)
- ML20080J633 + (ML20080J633)
- ML20080J643 + (ML20080J643)
- ML20080J645 + (ML20080J645)
- 05000348/LER-1995-002, :on 940424,main Control Board Annunciator Differential Flux Deviation Alert Inoperable.Caused by Personnel Failure to Ensure Plant Computer Updated. Annunciator Response Procedure Revised + (ML20080J650)
- ML20080J655 + (ML20080J655)
- ML20080J657 + (ML20080J657)
- ML20080J661 + (ML20080J661)
- ML20080J663 + (ML20080J663)
- ML20080J666 + (ML20080J666)
- ML20080J668 + (ML20080J668)
- ML20080J671 + (ML20080J671)
- ML20080J683 + (ML20080J683)
- 05000331/LER-1995-001, :on 950128,both stand-by DGs Automatically Started.Caused by Sensed Momentary under-voltage Condition on Both Essential Buses.Operators Verified That Essential Buses Being Powered from Normal Source + (ML20080J696)
- ML20080J704 + (ML20080J704)
- ML20080J707 + (ML20080J707)
- ML20080J709 + (ML20080J709)
- ML20080J714 + (ML20080J714)
- ML20080J718 + (ML20080J718)
- ML20080J720 + (ML20080J720)
- 05000338/LER-1995-002-01, :on 950203,one Train of Ssps on Each Unit Declared Inoperable & Appropriate Action for TS 3.3.2.1 Entered.Caused by Original HELB Analysis Not Evaluating Potential Failure.Design Changes Implemented + (ML20080J731)
- ML20080J733 + (ML20080J733)
- ML20080J735 + (ML20080J735)
- SNRC-1010, Forwards Data for Const Status Rept (NUREG-0300) for Fourth Quarter 1983 + (ML20080J736)
- ML20080J745 + (ML20080J745)
- ML20080J748 + (ML20080J748)
- ML20080J750 + (ML20080J750)
- 05000498/LER-1994-017, :on 941011,gaseous Effluent Monitor Setpoints Had Not Been Calculated in Accordance W/Offsite Dose Calculation Methodology.Caused by Failure to Revise Related Change Documents.Monitors Verified Operable + (ML20080J752)
- ML20080J758 + (ML20080J758)
- ML20080J760 + (ML20080J760)
- ML20080J761 + (ML20080J761)
- ML20080J765 + (ML20080J765)
- ML20080J772 + (ML20080J772)
- ML20080J773 + (ML20080J773)
- ML20080J776 + (ML20080J776)
- ML20080J783 + (ML20080J783)
- ML20080J789 + (ML20080J789)
- ML20080J791 + (ML20080J791)