Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20076L299 + (ML20076L299)
- ML20076L303 + (ML20076L303)
- ML20076L304 + (ML20076L304)
- ML20076L305 + (ML20076L305)
- ML20076L306 + (ML20076L306)
- ML20076L311 + (ML20076L311)
- BSEP-94-0413, Application for Amends to Licenses DPR-62 & DPR-71,proposing Ts,Increasing Instrument Surveillance Test Intervals & Allowable out-of-service Times + (ML20076L314)
- ML20076L316 + (ML20076L316)
- ML20076L320 + (ML20076L320)
- ML20076L322 + (ML20076L322)
- 05000311/LER-1983-023, Corrected LER 83-023/03L-0:on 830117-0418,seven Containment Isolation Valves Experienced Leakage Rates Greater than Max Range of Test Equipment.Total Containment Type B & C Leakage Could Not Be Demonstrated.Valves Repaired + (ML20076L323)
- ML20076L325 + (ML20076L325)
- ML20076L327 + (ML20076L327)
- ML20076L330 + (ML20076L330)
- ML20076L342 + (ML20076L342)
- ML20076L345 + (ML20076L345)
- ML20076L355 + (ML20076L355)
- ML20076L362 + (ML20076L362)
- ML20076L372 + (ML20076L372)
- ML20076L375 + (ML20076L375)
- ML20076L378 + (ML20076L378)
- ML20076L382 + (ML20076L382)
- ML20076L384 + (ML20076L384)
- ML20076L385 + (ML20076L385)
- 0CAN078306, Provides Addl Info in Support of 820729 Schedular Request for Exemption from 10CFR50,App R,In Order to Complete Proposed Mods to Redundant Safe Shutdown Equipment in Fire Zones 2100-Z & 2101-AA + (ML20076L390)
- ML20076L394 + (ML20076L394)
- ML20076L395 + (ML20076L395)
- ML20076L411 + (ML20076L411)
- ML20076L414 + (ML20076L414)
- ML20076L418 + (ML20076L418)
- ML20076L420 + (ML20076L420)
- 05000301/LER-1983-008-01, /01T-0:on 830617,during Refueling,Containment Air Radiation Monitoring Sys Inoperable.Caused by Failed Sample Pump Due to Blown Fuse in Data Acquisition Monitor Circuit. Instrumentation Repaired + (ML20076L424)
- ML20076L425 + (ML20076L425)
- ML20076L429 + (ML20076L429)
- BECO-LTR-94-117, Forwards Response to 941019 RAI Re Reactor Core Shroud at Plant.Proprietary Response to Question 4 Also Encl. Proprietary Response Withheld + (ML20076L430)
- RBG-15-413, Interim Deficiency Rept DR-93 Re Documentation & Code Stamping of Interconnecting Piping Between Reactor Water Cleanup Hxs.Info Awaited from Atlas Industrial Mfg Co.Next Rept Will Be Submitted by 830812 + (ML20076L433)
- 05000366/LER-1994-008-01, :on 940928,less than Adequate Procedure Occurred.Caused by Personnel Error on Part of Vendor Personnel & on Part of Plant Personnel.Procedures & Training of Personnel Revised + (ML20076L435)
- ML20076L438 + (ML20076L438)
- ML20076L441 + (ML20076L441)
- ML20076L442 + (ML20076L442)
- NRC-94-4328, Forwards Draft Outlines for AP600 Test & Analysis Repts. During 940924 Telcon,Opportunity for Dec Meeting Discussed. Westinghouse Believes Meeting to Provide Good Opportunity to Discuss Outlines W/Nrc Staff + (ML20076L443)
- ML20076L448 + (ML20076L448)
- ML20076L451 + (ML20076L451)
- ML20076L458 + (ML20076L458)
- ML20076L463 + (ML20076L463)
- ML20076L469 + (ML20076L469)
- ML20076L472 + (ML20076L472)
- ML20076L478 + (ML20076L478)
- 05000255/LER-1983-044-01, /01T-0:on 830625,during Planned Power Reduction, Sample from Safety Injection Tank T-82D Showed Boron Concentration Below Tech Specs.Caused by Minor Leak Past Loop Check Valve.Valves Will Be Inspected + (ML20076L480)
- ML20076L486 + (ML20076L486)
- ML20076L491 + (ML20076L491)