Monthly Operating Rept for June 1983
ML20076L299
Person / Time
Site: Farley Southern Nuclear icon.png
Issue date: 07/06/1983
From: Clayton F, Hairston W
ALABAMA POWER CO.
To:
NRC OFFICE OF RESOURCE MANAGEMENT (ORM)
References
NUDOCS 8307190108
Download: ML20076L299 (5)


Text

. _. _, _ _ ._ _ _ ___ _ __ _ _ . _ _ _ _ _ _ _ _ _ _ _ . _ _ _ _ _ _ _ .

l I

I

) OPERATING DATA REPORT DOCKET NO. 50-348 DATE 7/06/81 COMPLETED BY ti n Mnivston,III s TELEPHONE (205) R99-5156 OPERATING STATUS <

Notes

l. Unit Name: Joseoh M. Parlev - Unit 1 June,1983

! 2. Reporting Period:

2652 (1) Cumulative-data since

3. Licensed Thermal Power (MWt): 12/01/77, date of i 4. Nameplate Rating (Grom MWe): 860 commercial operation, i 5. Design Electrical Rating (Net MWe): 829
6. Maximum Dependable Capacity (Grom MWe): 844.6
7. Maximum Dependable Capacity (Net MWe): 803.6
8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report. Give Reasons:

N/A

9. Power Level To Which Restricted. If Any (Net MWe): N/A
10. Reasons For Restrictions.If Any: N/A This Month Yr..to.Dete " Cumulative
11. Hours In Reporting Period 720 4343 48,911
12. Number Of Hours Reactor Was Critical 720 2580.2 30.727.7
13. Reactor Reserve Shutdown Hours 0 25.1 3.639.6
14. Hours Generator On.Line 690.7 2478.3 29.746.5 0
15. Unit Reserve Shutdown Hours 0 0
16. Gross Thermal Energy Generated (MWH) 1,810,449 6,084,964 74,575,013
17. Gross Electrical Energy Generated (MWH) 568.438 1.924.044 23.697.592
18. Net Electrical Energy Generated (MWH) 538,854 1,799,448 -22,239,668
19. Unit Service Factor 95.9 57.1 60.8
20. Unit Availability Factor 95.9 57.1 60.8
21. Unit Capacity Factor (Using MDC Net) 93.1 51.6 56.6
22. Unit Capacity Factor (Using DER Net) 90.3 50.0 54.8

~ 23.- Unit Forced Outage Rate 4.1 1.2 17.0

24. Shutdowns Scheduled Over Next 6 Months (Type. Date.and Duration of Each):

N/A _

25. If Shut Down At End Of Report Period. Estimated Date of Startup: N/A
26. Units in Test Status (Prior to Commercial Operation): Forecast Achieved INITIAL CRITICALITY 8/06/77 8/09/77

\ INITIAL ELECTRICITY 8/20/77 8/18/77 COMMERCIAL OPERATION '12/01/77 12/01/77 ,

b 8307190108 830706 . I gog7, l

{DRADOCK 05000348 PDR _

._ DOCKIT5'O. 50-348 ~~~~ --

.- 1

/ UNIT DATE 7/06/83 C05fPLETED SY W.G Hairston,III ,

1 U^ TU* PHONE (205) 899-5156 s

310NTil June.1983 DAY 'AVERACE DAILY F0WER LEVEL DAY AVERACE DAILY POWER LEVEL (SIWE Net) .

(SIWE Net) 9n1 37 756-I 793 13 795 789 39 799 3

4 792 ;c 747

,3 797 21 791 6 792 22 _

799 7 792 23 789 3 799 ;4

  • 791 9 Ann 25- 789 10 nni 26 797 11 797 27 789 j 12 791 ;3 789 13 792 3 '789 14 799 30 787 1

Ig 123 33 16 173 I?GL'CT ONS

- On titis form:t. list the aver:g:d:aly unit ;:ower !cvelin M%~e Net for c:ch day in the reporting month. Compute to

, the near::t whole megswatt.

(9/77)

O

DOCKET NO. 50-348 ..

UNIT SilUTDOWNS AND POWER REIMICTIONS UNIT NAME J.M. Parley-Unit 1

' DATE 7/06/83

- COMPT.ETEI)llY N.G.Hairston ,III REPORT MONfig June TEL.EPilONE (205) 899-5156 l

"1.

~

.$E E Lkensee Ev E"L Cause & Cussective 1 "k ]g$

No. Date gg oE h

. Event Repost #

{$

in u Actiem su p,gy,,,geco,,,,c, 4

ji2g ,

8 15 830615 F 29.3 A NA NA HD llTEXCH Unit taken off line to repair turbine gland steam exhaust condenser following failure of the condenser fan.

1 4

4 1

1 l

, 'l 2 3 4 F: Forced Reason: Method: Exhibit G . Insieucsions S: Scheduled A Equipment Failure (Emplain) -

I Manual for Picparatism of Data Il Maintenance of Test 2 Manual Scram. Enisy sliccis for 4.icensec

C-Refueling 3 Automatic Scram. Event Repixa (l.ER) file INUREG-D-Regulasoay Restriclism 4 Onlics (Emplain) 0161)

E. Operator Training A license Examinailun F Administrative 5 G-Opesasiimal Es si.: (limplain) .

Exliibis I - Same Sous. e 3 (9/77) ll Ollies (Explain) 1

?

Malling Address

, p *, Allb1ma Power Company 600 North 18th Street i Post Offi-r Box 2641 l Birming. m. Alabama 35291 Telephone 205 783-6081 F. L Clayton, Jr.

R 2J' O 2 "*"' NabamaPower I the souttwxn electrc system July 12, 1983 Docket No. 50-348 Di rector, Of fice of Management Information and Program Control U. S. Nuclear Regulatory Commission Washington, D.C. 20555

Dear Si r:

RE: Joseph M. Farley Nuclear Plant Unit 1 Monthly Operating Data Report Attached are two (2) copies of the June,1983 Monthly Operating Report for Joseph M. Fa rl ey Nucl ear ' Plant, Unit 1, required by Section 6.9.1.10 of the Appendix A Technical Specifications. As requested by letter f rom Mr. John F.

Stolz to Mr. Alan R. Barton, dated October 21, 1977, a

" Narrative Summary of Operating Experience" is included in the attached report.

If you have any questions, please advise.

Yours very aly, gepu nb '

N F. L. Cl ayton, J r.

\

FL CJ r/KWM : na c Enclosures xc: Mr. Ted Cintula (1 copy)

Director, IE (10 copies)

Di re ct o r, .-RII (1 copy)'

d 9 f?<1 1

.:ct-  : w*

, JOSEPH M. FARLEY NUCLEAR PLANT UNIT 1 NARRATIVE

SUMMARY

OF OPERATIONS JUNE, 1983 During the month of June there was one unit shutdown. On June 15, 1983 the unit was shutdown for repair of the turbine gland exhaust condenser.

The following safety-related maintenance was performed in the month of June:

1. Performed miscellaneous maintenance on diesel generators.
2. Replacement of HFA relays.
  • 3. Repaired #8 river water pump.

a 2- -,- _ . - - J