OPERATING DATA REPORT DOCKET NO. 50-369 DATE July 4 1983 COMPLETED DY J. A. Reavis TELEPil0NE 704-373-7567 OPER.ATING ST ATUS Notes
- NOTE: Nameplate Rating McGuire Unit 1 I' Unit N***:
(Gross MWe) calculated as
- 2. Reporting Period: June 1. 1983 - June 30. 14R1 1450.000 MVA x.90 power 3411
- 3. Licensed Thennst Power istWti:
Ator per Pap iH,
1305*
.l. Namepiste Rating (Grow 31Wel:
1180
- 5. Design Electriesl Rating tNet MWel:
- 6. Mstimum Dependsble Capacity (Grow SlWc):
1180
- 7. Masimum Dependable Capacity (Net alw l:
e
- 8. If Change > Occur in Capacity itsimp titems Number 3 Through 7) Since Lad Report.Gise Reasons:
- 9. Power Level To which Restricted. lf Any (Nei MWe):
- 10. Reasons For Restrictioni. lf Any:
This Month Yr..to Date Cumuistive 720.0 4 343.0
-13 847.0
- 11. Hours in Reporting Period 694.6 1 351.1 8 489.3
- 12. Number Of Hours Reactor Was Critical
- 13. Itcactor Reserve Shutduwn flours 683.6 1 324.1 8 416.4
- 14. Ilours Generator On line
- 15. Unit Reserse Shutdnwn flours
- 16. Gross Thermal Energy Generated (31Wil) 1 953 836 2 998 449 16 500 867 685 759 1 038 978 5 665 569
- 17. Gross Electrical Energy Generated (MWil) 657 476 956 043 5 227 366
- 13. Net Electrical Energy Generated (MWil) 95.0 30.5 60.8
- 19. Unit Service Factor 95.0 30.5 60.8
-20. Unit Avsilability Factor 18.7 32.3 77.4
- 21. Unit Capscity Factor (thing SIDC Neti 77.4 18.7 32.3
- 22. Unit Capseity Factor (Using DER Net) 5.1 20.5 22.1
- 23. Unit Forced Outace Rate
- 24. Shutdowns Scheduled Oser Nest 6 Months (Type.Date,and Duration of Eacht:
None
- 25. If Shut Down At End Of Repor: Period. Estimated Date of Startup:
- 26. Units in Test Status ipr.ior to Commercial Operation):
Forcesst Achiesed j
INITI \\ L CRITICA LITY INITI A l. !'.L LC 1 RICliY C0\\lsil.RCI.\\ L Orl'.R A fl0N l
lal'IIII 8307190180 830715 I
PDR ADOCK 05000369
\\
R pm l
l
. nv.
50-369 DCCKIT NO.
Lh'IT McGuire Unit 1 DATE July 15,1983 COMPLETED BY J. A. Reavis TZLEPHONE 704-373-7567 310 NTH June. 1983
\\
DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE D,AILY ?OWER :.IVEL (31%e.Ner
, 3 w,,y,,,
496 1 014 I
1 209 1 043 2
33 1 045 3
Rol 19 4
864 1 024
,o 1 029 3
A77 866 780 6
see I
885 472 7
23 l
1 034 1 036 s
,4 1 042 9
1 033
- 5 1 019 1 042 to i
951 1 036 74 9 1 087 3,
- 3 13 1 032 1 161 9
14 1 n1' 30 682 1 031 is
.JI 1 022 i6 l
!Ns RtCTress On th:s ferr :st. list :he aer:ge hi!y 2..it wer e.,e: ;a qwe.3et f..e,3,.3.:.,.,.,,.
l
'he nearest Aneie..ep.*:::
l
..; - i
50-369 DOCKET NO UNITSilUTDOWNS AND POWER REDUCTIONS UNIT NAME McGuire 1 DATE 7-15-83 COMPLETED IlY J.A. Reavis REPORT MONTil June, 1983 TELEPilONE 704-373-7567 l
E
- i
,$E 3* $5'5 Licensee
,E-r, g
Came & C.urective N.e.
isate r-ER j s 5-Event 3?
9-1 Action to s*
j@
3 gg g Repint a ik 0 8U Prevent Recurrence E
n 4
83-06--01 F
0.32 A
CB Instru 2 of 3 low flow signals in"C" RC loop due to bad test box in RC flow test.
75% physics testing follo' wing replace-RC zzzzzz.
4-P' 83-06-01 S
B ment of burnable poison rod assemalies.
5 83-06-02 F
14.20 A
3 CH Valvex Feedwater pump stop valve shut and ttipped unit on lo S/G level.
RC
_zzzzzz Physics testing.
5-P 83-06-03 S
B 6-P 83-06-07 F
A CH Pumpxx Change out control module on feedwater pump.
D CB zzzzzz 90% power-tech spec. limit 7-P 83-06-07 S
8-P 83-06-11 F
B CH Pumpxx Feedwater pump tripped on overspeed test h;
1 4
I 2
F: Forced Reawn:
Metingt:
Exhibit G -Instructiims S: Scheduled A Eiguipment Failure (Explain) 1 Manual for Preparatism of Data 11 Maintenance of Test 2 Manual Scram.
lintry Sficets for I.seensee 1 Automatic Scram.
Event Repswa ll.I'R) File INtlREG-C Refueling D Regulatory Restrietion 4 Osher (Explain) 01bl)
E-Opeiator Training.t License Examinathm F Administrative 1
5 Exhibit ! Same Simece G Opeiational Eirne (lixplain) ~
l')/77)
Il Other li!xplain)
~
UNITSilUTDO5fNS ANI)l'OWIIR ltEDUCTIONS DO
- A Mc re 1 DATE 7-15-83 COMPLETEp ilY J.A.Reavis f(EPOttT AtONTil June, '2.83 o
TELEPIIONE 704-373-7567
't
,5,
3-N' Licensee
,E-r, Cause & Coesectiec No.
Date g
3g j
jg5 IIvent gy 9.?
Action to f:
3 ;f, g Repint a to O 5'
Prevent Itcentrence F
o g
O
\\
9-P 83-06-12 S
D CB zzzzzz 90% Tech. Spec. limit.
6 83-06-22 F
12.65 A
3 CH Valvex During 50% runback ' test, both feed-water pumps tripped when power by-
/
pass valve failed.
CB zzzzzz 90% Tech. Spec. Limit 10-P 83-06-23 S
D 11-P
'83-06-27 F
A HC xxxxxx Condenser vacuum problems.
CB zzzzzz 90% Tech. Spec. Limit 12-P 83-06-27 S
D 7
83-06-30 F
9.20 B
3 IA Instru RPS functional test procedure /
communications error.
1 2
1 4
F: Forced Iteawn:
Methu t:
Exhibit G. Instructiims s
S: Sclicituted A Equipment Failure (Explain) 1 Manual for Preparation of I)ata Il Alaintenance of Test 2 hlanual Scram.
linity Slicets for I.seensee
.l Automatic Scram.
livent Iteport (I Elt) File INtlREG-C-Itefocling D-Itegulatory itese rierlun 4 Other (lixplain) 01bl1 I -Opeaator Training 1 Licenso Examinatiem F Adminisstative 5
G Opciational !! ror (lixplain) 3 lixhibit I Same Souwe l'J/77)
II Other (lixplain!
'o DOCKET NO:
50-369 UNIT:
McCuire 1 DATE:
7-15-83 NARRATIVE SUIDIARY Month:
June, 1983 McGuire Unit I was increasing power to come on line following a forced outage due to faulty test equipment whan June started. Power increase was limited to allow core physics testing. On June 2nd. a feedwater pump bearing oil pump transient caused the feedwater pump stop valve to shut and triggered a turbine runback signal. The transient and runback both cleared while the stop valve s, hut resulting in a unit trip. The' unit was back on line later that day.
Physics testing was completed over the next three days. On June 7 a control module on a feedwater pump was changed out and following this the unit was limited to a 90% power maximum until the NRC approved technical specification changes permitting operation at 100% on June 28. On June 11 a runback occurred when a feedwater pump turbine tripped during an overspeed trip test. June 22 a brief forced outage occurre,d when during a 50% runback test, both feedwater pumps tripped on low suction when a powdef bypass valve failed to respond fast enough. Power was again reduced on June 27th. due to condenser vacuum problems resulting from work on the turbine steam seal regulating valve.
Finally, McGuire 1 experienced a trip from 100% power on June 30 during a reactor protective system functional test. The cuase was determined to be inadequate communica-tion of procedure requirements. The unit was still increasing load at the end of the month.
m -
e
%~
r,n a
e
MONTHLY REFUELING INFORMATION REQUEST McGuire Unit 1 1.
Facility name:
2.
Scheduled next refueling shutdown:
January, 1984 March, 1984 3.
Scheduled restart following refueling:
4.
Will refueling or resumption of operation thereaf ter require a technical specification change or other licence amendment?
If yes, what will these be?
If no, has reload design and core configuration been reviewed by Safety Review Committee regarding unreviewed safety questions?
N/A 5.
Scheduled date(s) for submitting proposed licensing action and supporting information:
N/A 6.
Important licensing considerations (new or different design or supplier, unreviewed design or performance analysis methods, significant changes in design or new operating procedures).
N/A i
7.
Number of fuel assemblies (a) in the core:
193 (b) in the spent fuel pool:
29 8.
Present licensed fuel pool capacity:
500 Size of requested or planned increase:
9.
Projected date of last refueling which can be accommodated by present licensed capacity:
DUKE POWER COMPANY Date: July 15, 1983 Name of
Contact:
J. A. Reavis Phone: 704-373-7567
.- ~
1 OPERATING DATA REPORT DOCKET NO. -
DATE Julv 15.1983 COMPLETED BY J. A. Reavis 1
TELEPHONE 704-373-7567 OPERATING STATUS l
McGuire Unit 2 Notes: Nameplate Rating I*
' b***
(Gross Mwe) calculated as
- 2. Reporting Period:
hae 1 loo? - hae 30, 1001 1450.000 MVA x.90 power
- 3. Licensed Thennal Power QlWr): 170 2
he m W %
1305*
- 4. Nameplate Rating (Gross MWe):
1180
- 5. Design Electrial Rating (Net MWe):
- 6. Maximum Dependable Capacity (Gross MWel:
1180
- 7. Maximum Dependable Capacity (Net MWel:
S. If Changes Occur in Capacity Ratings litems Number 3 Through 7) Since Last Report. Give Reasons-
- 9. Power Level To which Restricted. If Any (Net MWe):
- 10. Reasons For Restrictions. If Any:
This Month Yr. to Date Cumulative
!!. Hours in Reporting Period
- 12. Number Of Hours Reactor Was Critical j
- 13. Reactor Reserve Shutdown Hours
- 14. Hours Generator On Line
- 15. Urut Reserve 'hutdown Hours NOT IN COMMERCIAL OPERATION
- 16. Gross Thermal Energy Cenerated (MWH)
- 17. Gross Electrical Energy Generated (MWH)
- 18. Net Electrical Energy Generated (MWH)
- 19. Unit Service Factor
- 20. Unit Availability Factor
- 21. Un;t Capacity Factor (Using MDC Net)
- 22. Unit Capacity Factor (Using DER Net)
- 23. Unit Forced Outzge Rate
- 24. Shutdowns Scheduled Over Next 6 Months (Type.Date and Duration of Eacht:
- 25. If Shut Down At End Of Report Period. Estimated Date of St:rtup:
- 26. Units in Test Status iPrior to Commercial Operation):
Forecast Achieved -
INITIAL CRITICA LITY 5/8/83 INITIA L ELECTRICITY 5/23/83 COMMERCIA L OPER ATION 3/84 9
- e
{
i i
.,n w.,.,.n
,-n.-
a.
-,=~,
l McGUIRE NUCLEAR STATION Operating Status Report 1.
Personnel Exposure For the month of May, no individual (s) exceeded 10 percent of their allowable annual radiation dose limit.
2.
The total station liquid release contribution to whole body _ dose for May has been compared with the Technical Specifications annual value of 3 mrem; the total release for May was less than 10 percent.
The total station gaseous release contribution to any organ dose for May has been compared with the Technical Specifications annual value of 15 mrem; the total release for May was less than 10 percent of this limit.
I, d
0 b
n
-v..
,c-.
k NRC~
1982 CHANGES
.McGuire 1 Period Originally Reported Restated February, 1982 Outage No. 7 (12.38 hrs.)
Outage No. 7 (12.25 hrs.)
Outage No. 8 (13.47 hrs.)
Outage No. 8 (13.20 hrs.)
Outage No. 9 (5.58 hrs.)
Outage No. 9 (5.98 hrs.)
L July, 1982 Outage No. 12 (395.03 hrs.)
Outage No. 12 (216.00 hrs.)
(82-07-01) Date started (82-07-01) Date started Outage No. 12A (179.03 hrs.)