Similar Documents at Byron |
---|
Category:LEGAL TRANSCRIPTS & ORDERS & PLEADINGS
MONTHYEARML20207E0051999-03-0202 March 1999 Transcript of 990302 Public Meeting with Commonwealth Edison in Rockville,Md.Pp 1-104.Supporting Documentation Encl ML20236H9381998-06-30030 June 1998 Transcript of 980630 Meeting W/Commonwealth Edison in Rockville,Md.Pp 1-123.Supporting Documentation Encl ML20198P3001997-11-0404 November 1997 Transcript of 971104 Public Meeting W/Ceco in Rockville,Md Re Measures Established by Ceco to Track Plant Performance & to Gain Understanding of CAs Put Into Place to Improve Safety.Pp 1-105.W/Certificate & Viewgraphs ML20149M2951996-11-29029 November 1996 Exemption from Requirements of 10CFR50.60 Re Safety Margins Recommended in ASME Boiler & Pressure Vessel Code Case N-514 TXX-9522, Comment Opposing Proposed GL on Testing of safety-related Logic Circuits.Believes That Complete Technical Review of All Surveillance Procedures Would Be Expensive & Unnecessary Expenditure of Licensee Resources1995-08-26026 August 1995 Comment Opposing Proposed GL on Testing of safety-related Logic Circuits.Believes That Complete Technical Review of All Surveillance Procedures Would Be Expensive & Unnecessary Expenditure of Licensee Resources ML20059C2351993-12-17017 December 1993 Comment Supporting Petition for Rulemaking PRM-21-2 Re Commercial Grade Item Dedication ML20044A8111990-06-27027 June 1990 Comment Opposing Closure of Lpdr of Rockford Public Library ML20245J0191989-04-14014 April 1989 Comment Re Proposed Rule 10CFR50 Re Ensuring Effectiveness of Maint Programs for Nuclear Power Plants ML20214X1871987-06-11011 June 1987 Order Imposing Civil Monetary Penalty in Amount of $25,000 Based on Four Severity Level III Violations Noted During 860721-0808 Insp ML20205Q1711987-04-0202 April 1987 Order Imposing Civil Monetary Penalty in Amount of $25,000. App Re Evaluations & Conclusions Encl IR 05000812/20100311987-02-26026 February 1987 Order Imposing Civil Monetary Penalty in Amount of $100,000 Based on Violations Noted During Insps on 850812-1031 ML20210T7321987-02-11011 February 1987 Unexecuted Amend 6 to Indemnity Agreement B-97 Substituting Item 3 of Attachment to Indemnity Agreement in Entirety W/ Listed License Numbers,Effective 870130 ML20209J3251987-01-30030 January 1987 Transcript of 870130 Commission Discussion/Possible Vote on Full Power OL for Facility.Pp 1-72.Supporting Viewgraphs Encl ML20213G4381986-10-24024 October 1986 Unexecuted Amend 5 to Indemnity Agreement B-97,substituting Item 3 of Attachment to Agreement in Entirety W/Listed License Numbers,Effective on 861106 ML20211B0841986-08-0505 August 1986 Transcript of 860805 Meeting Between Region Iii,Computer Interference Elimination & Util in Redmond,Wa Re Plant as-built Drawing Review.Pp 1-200 IR 05000506/20070221986-05-0202 May 1986 Order Imposing Civil Monetary Penalty in Amount of $25,000 for Violations Noted During Insp on 850506-0722.Violations Noted:Failure to Establish Radiological Safety Procedures & to Adequately Train Personnel ML20138C7301985-12-0909 December 1985 Order Imposing Civil Penalty in Amount of $25,000 Per 850606 Notice of Violation & Proposed Imposition of Civil Penalty.Licensee May Request Hearing within 30 Days of Date of Order ML20205E8741985-10-28028 October 1985 Exemption from GDC 4 of 10CFR50,App a Requirement to Install Protective Devices Associated W/Postulated Pipe Breaks Primary Coolant Sys.Topical Rept Evaluation Encl ML20102A2981985-01-0707 January 1985 Petition Requesting Aslab Grant Intervenor Appeal & Order Further Hearings on Safety of Plant ML20099L2581984-11-27027 November 1984 Notice of Withdrawal of Appearance in Proceeding.Certificate of Svc Encl ML20099G5381984-11-23023 November 1984 Supplemental Appeal Brief in Response to Intervenor 841106 Supplemental Brief on Appeal & in Support of ASLB 841016 Supplemental Initial Decision Authorizing Issuance of Ol. Certificate of Svc Encl ML20100K0411984-11-22022 November 1984 Submits Concerns Re Safety of Local Residents in Event of Accident & Excessively High Cost of Projected Operation of Facility ML20107H7841984-11-0606 November 1984 Supplemental Brief on Appeal of ASLB 841016 Supplemental Initial Decision Granting Authority for Issuance of Ol. Decision Should Be Reversed.Certificate of Svc Encl ML20140E4081984-10-31031 October 1984 Executed Amend 1 to Indemnity Agreement B-97,deleting Items 2A & 3 in Entirety ML20098G8841984-10-0202 October 1984 Joint Statement of RW Manz & W Faires Re Findings 3-11 Through 3-17 of NRC 830930 Integrated Design Insp Rept. Certificate of Svc Encl ML20098G8681984-10-0202 October 1984 Answer to Intervenor Motion to Reopen Record Re Bechtel Independent Design Review.Motion Should Be Denied ML20098G8901984-10-0202 October 1984 Joint Statement of Kj Green & RW Hooks Re Integrated Design Insp ML20098G8911984-10-0202 October 1984 Joint Statement of Cw Dick & EM Hughes Re Independent Design Insp ML20098G8821984-10-0101 October 1984 Affidavit of Kj Green Re Integrated Design Insp Concerning Mechanical Engineering Work ML20098G8741984-10-0101 October 1984 Affidavit of Br Shelton Re Integrated Design Insp ML20098G8881984-09-29029 September 1984 Affidavit of RW Hooks Re Integrated Design Insp Concerning Structural Design ML20098G8831984-09-28028 September 1984 Affidavit of W Faires Re Findings 3-15 & 3-16 of NRC 830930 Integrated Design Insp Rept ML20098G8811984-09-28028 September 1984 Affidavit of Cw Dick Re Independent Design Review ML20098G8791984-09-28028 September 1984 Affidavit of RP Tuetken Re Readiness for Fuel Loading ML20098G8781984-09-28028 September 1984 Affidavit of RW Manz Concerning Findings 3-11 Through 3-14 & 3-17 of NRC 830930 Integrated Design Insp Re Westinghouse ML20098G8871984-09-28028 September 1984 Affidavit of EM Hughes Re Idvp ML20098G8851984-09-27027 September 1984 Affidavit of Rl Heumann Re Costs of Delay in Startup & Operation of Unit 1 ML20098E2371984-09-24024 September 1984 Reply to Intervenor 840918 Proposed Supplemental Initial Decision.Certificate of Svc Encl ML20097E7221984-09-13013 September 1984 Agreed Motion for Time Extension Until 841101 to File Petition for Hearing Re Emergency Planning Commitment W ML20097C5311984-09-12012 September 1984 Motion to Reopen Record to Include Plant Design as Issue. Supporting Documentation & Certificate of Svc Encl ML20097B7791984-09-10010 September 1984 Proposed Supplemental Initial Decision Re Reinsp Program. Certificate of Svc Encl ML20096A6391984-08-30030 August 1984 Rebuttal Testimony of RW Hooks Re Validity of Info in Attachment 7 to Stokes Testimony Concerning Design Assumption for Plant.Stokes Info Inapplicable to Plant. Related Correspondence ML20096A6191984-08-30030 August 1984 Rebuttal Testimony of B Erler Re Stokes Allegations Concerning Evaluations of Discrepancies in Calculated Actual Stress Performed by Sargent & Lundy.Related Correspondence ML20096A6261984-08-30030 August 1984 Summary of Rebuttal Testimony & Testimony of ML Somsag, Eb Branch,D Demoss,Mr Frankel,Bf Maurer & Jk Buchanan Re Plant QC Inspector Reinsp Program & C Stokes Allegations Re Welds.Related Correspondence ML20096A6441984-08-28028 August 1984 Notice of Withdrawal of Appearance in Proceeding.Related Correspondence ML20112D5271984-08-24024 August 1984 Applicant Exhibit A-R-4,consisting of Feb 1984 Rept on Bryon QC Inspector Reinsp Program ML20112D5031984-08-24024 August 1984 Applicant Exhibit A-R-5,consisting of June 1984 Suppl to Rept on Bryon QC Inspector Reinsp Program ML20112D7441984-08-23023 August 1984 Intervenor Exhibit I-R-1,consisting of Undated List of Teutken Safety Category Insp Types ML20112D7511984-08-21021 August 1984 Staff Exhibit S-R-1,consisting of 840813 Instruction for Walkdown of Cable Tray Hanger Connection Welds ML20112D4641984-08-21021 August 1984 Intervenor Exhibit I-R-11,consisting of Undated Chronological Date Listing of Util Responses to Interrogatory 12.VA Judson to Mi Miller Re Interrogatory 12 & Supplemental Responses Encl 1999-03-02
[Table view] Category:OTHER LEGAL DOCUMENT
MONTHYEARML20099L2581984-11-27027 November 1984 Notice of Withdrawal of Appearance in Proceeding.Certificate of Svc Encl ML20098G8841984-10-0202 October 1984 Joint Statement of RW Manz & W Faires Re Findings 3-11 Through 3-17 of NRC 830930 Integrated Design Insp Rept. Certificate of Svc Encl ML20098G8901984-10-0202 October 1984 Joint Statement of Kj Green & RW Hooks Re Integrated Design Insp ML20098G8911984-10-0202 October 1984 Joint Statement of Cw Dick & EM Hughes Re Independent Design Insp ML20098E2371984-09-24024 September 1984 Reply to Intervenor 840918 Proposed Supplemental Initial Decision.Certificate of Svc Encl ML20097B7791984-09-10010 September 1984 Proposed Supplemental Initial Decision Re Reinsp Program. Certificate of Svc Encl ML20096A6441984-08-28028 August 1984 Notice of Withdrawal of Appearance in Proceeding.Related Correspondence ML20093N0991984-07-24024 July 1984 Notice of Appearance in Proceeding.Certificate of Svc Encl ML20093N1081984-07-24024 July 1984 Notices of Appearance in Proceeding.Certificate of Svc Encl ML20093A5121984-07-0505 July 1984 Amended Notice of Entry of Special & Limited Appearance. Certificate of Svc Encl ML20092G3131984-06-18018 June 1984 Notice of Appearance in Proceeding.Certificate of Svc Encl ML20084E1271984-04-27027 April 1984 Supplemental Memorandum Re Intervenors Financial Qualifications Contentions & Disqualification of Judges. Certificate of Svc Encl ML20086M7441984-02-13013 February 1984 Notice of Withdrawal of Appearance in Proceeding.Certificate of Svc Encl ML20079K9391984-01-23023 January 1984 Notice of Appeal of ASLB 840113 Initial Decision LBP-84-2. Certificate of Svc Encl ML20079M6281984-01-23023 January 1984 Notice of Appeal of ASLB 840113 Initial Decision.Certificate of Svc Encl ML20076L3041983-07-14014 July 1983 Memorandum of 830713 Oral Motion for Extension Until 830726 to File Reply Findings to Rockford League of Women Voters Proposed Findings of Fact & Conclusions of Law Re Steam Generator Tube Integrity.Certificate of Svc Encl ML20069L1851983-04-22022 April 1983 Notice of Appearance in Proceeding.Certificate of Svc Encl ML20073M9171983-04-18018 April 1983 Notice of Appearance in Proceeding.Certificate of Svc Encl ML20073J1341983-04-13013 April 1983 Notice of Appearance in Proceeding.Certificate of Svc Encl ML20072U0111983-04-0505 April 1983 Notice of Appearance in Proceeding.Certificate of Svc Encl ML20071B3521983-02-18018 February 1983 Notice of Appearance in Proceeding.Certificate of Svc Encl ML20065B8791983-02-18018 February 1983 Notice of Appearance in Proceeding.Certificate of Svc Encl ML20028G3841983-02-0404 February 1983 Notice of Appearance in Proceeding.Certificate of Svc Encl ML20028F5931983-01-24024 January 1983 Notice of Appearance in Proceeding.Certificate of Svc Encl ML20064J5831983-01-14014 January 1983 Notice of Appearance in Proceeding.Certificate of Svc Encl ML20066H9321982-11-19019 November 1982 Notices of Appearance in Proceeding.Certificate of Svc Encl ML20066H4631982-11-18018 November 1982 Notice of Withdrawal of Cherry & Flynn Law Firm as Rockford League of Women Voters Counsel.Certificate of Svc Encl ML20058G6811982-08-0202 August 1982 Notice of 820818 Prehearing Conference in Rockford,Il ML20058B9131982-07-22022 July 1982 Response to ASLB 820713 Request for Info.Hearing Should Be Rescheduled to Begin No Sooner than mid-Nov 1982.Notices of Appearance & Certificate of Svc Encl ML20058B8961982-07-22022 July 1982 Response to ASLB 820713 Request for Info.Parties Unable to Agree on Joint Response.Nrc Prepared to Proceed to Hearing on 820818 on Contentions Other than Rockford League of Women Voters Contentions.Certificate of Svc Encl ML20055B0921982-07-16016 July 1982 Response to 820713 Request for Info,Transmitting ML20054J9611982-06-28028 June 1982 Notice of Appearance in Proceeding.Certificate of Svc Encl ML20054J5691982-06-25025 June 1982 Advice to Aslab Re Overall Jurisdiction to Assure Fair Hearings.Proof of Svc Encl ML20054J0781982-06-18018 June 1982 Notice of ASLB Reconstitution.Mb Margulies,Chairman & AD Callihan & Rf Cole,Members ML20140B2561981-09-0909 September 1981 Revises ASLB 810819 Schedule ML19309D0541980-02-29029 February 1980 Notice of Appearance in Proceeding.Certificate of Svc Encl ML19305C6411980-02-22022 February 1980 Notice of Appearance of Mm Cherry on Behalf of Intervenor League of Women Voters of Rockford,Il.Represents That Util Is Willing to Continue 800213 Motion Until 800310. Certificate of Svc Encl ML19254D8861979-09-24024 September 1979 Notice of Appearance on Behalf of Dekalb Area Alliance for Responsible Energy & Sinnissippi Alliance for Environ. Certificate of Svc Encl ML19249D9471979-08-24024 August 1979 Certifies That Answer to League of Women Voters of Rockford Il Contentions & Motions to File Instanter Answer to Same Contentions,Was Served on Parties on 790824 ML19225A5841979-06-14014 June 1979 Notification of Inability to Continue as Intervention Chairman.B Von Zellen Will Receive Future Info Re Proceeding.Certificate of Svc Encl 1984-09-24
[Table view] |
Text
Q'V i m
./
[h UNITED STATES OF AMERICA l ' ~[ Nd "
NUCLEAR REGULATORY COMMISSION
-l 78 b
' 3 P's U@s ~
BEFORETHEATOMICSAFETYANDLICENSINGBOARD(4d[p,fg. //
g'du N -
, In the Matter of )
)
COMMONWEALTH EDISON COMPANY ) Docket Nos. 50-454 OL
) 50-455 OL (Byron Nuclear Power Station, )
Units 1 & 2) )
MEMORANDUM OF BOARD APPROVAL OF TIME EXTENSION On July 13, 1983, Commonwealth Edison Company (Applicant), pursuant to agreement by counsel for the Rockford League of Women Voters and counsel for the Nuclear Regulatory Commission, requested by oral motion via tel-ephone conversation with Judge Ivan W. Smith, Chairman of the Atomic Safety and Licensing Board, an extension of time until July 26, 1983 to file reply findings to Intervenor Rockford Lee.gue of Women Voters' Proposed Findings of Fact and Conclusions of Law Regarding Steam Generator Tube Integrity. Judge Smith orally granted the motion for an extension of-time and directed Applicant to file a mem-orandum relating the above events.
Pursuant to Judge Smith's direction, Applicant is
.hereby setting forth in writing its request for a time extension and filing this Memorandum reflecting oral granting of Applicant's motion for an extension of time until July 26, 1983 to file reply findings to Intervenor Rockford 8307190111 830714 PDR ADOCK 05000454 G PDR. _
_ 3 503
I rs League of Women Voters' Proposed Findings of Fact and Conclusions of Law Regarding Steam Generator Tube Integrity.
Respectfully submitted, y---
Michael R. Goldfein One of the Attorneys for Commonwealth Edison Co.
Of Counsel Joseph Gallo Michael Goldfein ISHAM, LINCOLN & BEALE 1120 Connecticut Avenue, N.W.
Suite 840 Washington, D.C. 20036 Three First National Plaza Suite 5200 Chicago, Illinois 60602 Dated: July 14, 1983 l
l i
l
. . - = . -. -
W.
4*' UNITED STATES OF AMERICA NUCLEAR ~ REGULATORY COMMISSION .
4 BEFORE THE ATOMIC SAFETY AND LICENSING BOARD In the Matter of )
)
COMMONWEALTH EDISON COMPANY ) Docket Nos. 50-454 OL
) 50-455 OL (Byron Nuclear Power Station, )
Units 1 & 2) )
CERTIFICATE OF SERVICE The undersigned, one of the attorneys for Common-l wealth Edison Company, certifies that he filed the original ;
and two copies of the attached " MEMORANDUM OF BOARD APPROVAL OF TIME EXTENSION" with the Secretary of the Nuclear Regulatory Commission and served a copy of the same on each of the persons at the addresses shown on the attached service list. Service on the Secretary and all parties,
. unless otherwise indicated, was made by deposit in the U.S. Mail, first-class postage prepaid, this 14th day of July, 1983.
,.g.
' One of the attorneys for
! Commonwealth Edison Company I Of Counsel l Joseph.Gallo.
Michael Goldfein ISHAM,-LINCOLN & BEALE 1120 Connecticut Avenue, N.W.
Suite 840 Washington, D.C. 20036 Three First National Plaza Suite 5200 i Chicago,' Illinois 60602 l-
[ .-
Dated: July 14, 1983
, . - + , - - , . . , ,w - ,- -evv ---w- ec, , y -
-- 4 --w, -g,- y--, -- m, , , - - , * --- ,
I ta SERVICE LIST COMMONWEALTH' EDISON COMPANY -- Eyron Station Docket Nos. 50-454 and 50-455 Mr. Ivan W. Smith Secretary Administrative Judge and Attn: Chief, Docketing and i Chairman Service Section 3 -Atomic Safety and Licensing U.S. Nuclear Regulatory Commission Board Washington, D.C. 20555 U.S. Nuclear Regulatory Commission Ms. Betty Johnson Washington, D.C. 20555 1907 Stratford Lane Rockford, Illinois 61107 Dr. Richard F. Cole Atomic Safety and Licensing MA. Diane Chavez Board Panel SAFE U.S. Nuclear' Regulatory Commission 326 North Avon Street Washington, D.C. 20555 Rockford, Illinois 61103 1
~
Atomic Safety and Licensing Dr. Bruce von Zellen Board Panel Department of Biological Sciences U.S. Nuclear-Regulatory Commission Northern Illinois University Washington, D.C. 20555. DeKalb, Illinois 60115 Chief Hearing Counsel Joseph Gallo,;Esq.
Office of the Executive Isham, Lincoln & Beale Legal Director Suite 840 U.S. Nuclear Regulatory Commission 1120 Connecticut Ave., N.W.
Washington, D.C. 20555 Washington, D.C. 20036 Dr. A. Dixon Callihan Douglass W. Cassel, Jr.
Union Carbide Corporation Jane Whicher i P.O. Box Y BPI Oak Ridge, Tennessee 37830 Suite 1300 109 N. Dearborn Mr. Steven C. Goldberg Chicago,1 Illinois 60602 Ms. Mitzi A. Young Office of the Executive Legal Ms. Patricia Morrison Director 5568 Thunderidge Drive l U.S. Nuclear Regulatory Commission Rockford, Illinois 61107 Washington, D.C. 20555 Mr. David Thomas Atomic Safety and Licensing 77 South Wacker Appeal' Board Panel .
Chicago, Illinois 60621
.U.S. Nuclear Regulatory Commission Washington, D.C. 20555 l
1 l
, ,, . . - , - -