Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20071C758 + (ML20071C758)
- ML20071C761 + (ML20071C761)
- 05000373/LER-1983-008-03, /03L-0:on 830203,while Performing Visual Insp Per Tech Specs,Snubber LC01-1106S Found Inoperable.Caused by Missing Pin Due to Improper Field Practices.Pin Replaced + (ML20071C762)
- ML20071C764 + (ML20071C764)
- 05000315/LER-1983-011, Forwards LER 83-011/03L-0 + (ML20071C766)
- ML20071C768 + (ML20071C768)
- ML20071C770 + (ML20071C770)
- W3P83-0677, Forwards Equipment Qualification Data Evaluation Forms, Per ,In Response to H Garg Request.Package Should Close Out Audit Followup,Comment 25 + (ML20071C772)
- 05000315/LER-1983-011-03, /03L-0:on 830125,while Repairing Transfer Pump 2 Ba,Pump 1 Ba Removed from Svc.Caused by Excessive Seal Leakage Due to Bearing Failure + (ML20071C775)
- ML20071C776 + (ML20071C776)
- 05000237/LER-1983-002, Forwards Updated LER 83-002/03X-1 + (ML20071C777)
- 05000249/LER-1983-004, Forwards LER 83-004/03L-0 + (ML20071C780)
- ML20071C782 + (ML20071C782)
- ML20071C783 + (ML20071C783)
- ML20071C785 + (ML20071C785)
- 05000237/LER-1983-002-03, Valve Mo 2-1501-19A Failed to Close During Test.Caused by Loose Wire 19A-CR109CO in Combination Starter.Terminal Tightened & Valve Successfully Cycled from Control Room + (ML20071C786)
- 05000249/LER-1983-004-03, /03L-0:on 830204,while Disc Operations Sys 1600-1 Valve Timing Test in progress,MO-3-1301-3 Failed to Open. Caused by Valve Disc Wedged Too Tightly Against Seat.Valve Cycled from Control & Successfully Timed + (ML20071C787)
- ML20071C791 + (ML20071C791)
- 05000315/LER-1983-002, Forwards LER 83-002/03L-0 + (ML20071C792)
- ML20071C794 + (ML20071C794)
- ML20071C795 + (ML20071C795)
- ML20071C797 + (ML20071C797)
- 05000315/LER-1983-002-03, /03L-0:on 830125,ice Condenser Intermediate Deck Door Weighing Procedure Revealed 70 Doors Exceeded Max Initial Opening Force Specs.Caused by Misalignment &/Or Dented Hinges.Hinges Realigned & Lubricated + (ML20071C801)
- ML20071C802 + (ML20071C802)
- 05000305/LER-1983-002, Forwards LER 83-002/03L-0 + (ML20071C810)
- ML20071C815 + (ML20071C815)
- 05000305/LER-1983-002-03, /03L-0:on 830126,during Full Power,Diesel Generator Removed from Svc to Repair Leaks in Cooling Sys Hx.Caused by Corrosion on Svc Water Side of Cooling Water Hx.Two Tubes Plugged & Four Tube Sheet Faces Repaired + (ML20071C818)
- ML20071C819 + (ML20071C819)
- ML20071C823 + (ML20071C823)
- ML20071C826 + (ML20071C826)
- ML20071C828 + (ML20071C828)
- ML20071C830 + (ML20071C830)
- ML20071C835 + (ML20071C835)
- ML20071C836 + (ML20071C836)
- ML20071C842 + (ML20071C842)
- ML20071C844 + (ML20071C844)
- ML20071C846 + (ML20071C846)
- ML20071C849 + (ML20071C849)
- ML20071C851 + (ML20071C851)
- ML20071C853 + (ML20071C853)
- ML20071C857 + (ML20071C857)
- ML20071C858 + (ML20071C858)
- ML20071C861 + (ML20071C861)
- ML20071C863 + (ML20071C863)
- TXX-3624, Final Deficiency Rept Re Procurement & Installation of Nonmetallic Insulation.Initially Reported on 830126.Matter Not Reportable Per 10CFR50.55(e) + (ML20071C865)
- ML20071C867 + (ML20071C867)
- W3P83-0654, First Interim Significant Const Deficiency Rept 69 Re Crosby Valve & Gage Co Stellite Alloy 6B Discs.Discs Will Be Replaced W/Certified Matl.Next Rept Will Be Submitted by 830510 + (ML20071C870)
- ML20071C873 + (ML20071C873)
- 05000255/LER-1983-009-03, /03L-0:on 830127,PCS Sample Revealed Dose Equivalent I-131 Exceeded Tech Specs.Caused by Normal Fuel Leakage.Procedures to Be Revised to Increase Letdown Purification Flow Following Trip + (ML20071C874)
- ML20071C875 + (ML20071C875)
- ML20071C876 + (ML20071C876)