ML20071C857
| ML20071C857 | |
| Person / Time | |
|---|---|
| Site: | Diablo Canyon |
| Issue date: | 01/04/1983 |
| From: | Kelly W PACIFIC GAS & ELECTRIC CO. |
| To: | |
| Shared Package | |
| ML20071C852 | List: |
| References | |
| NUDOCS 8303080177 | |
| Download: ML20071C857 (4) | |
Text
-
MONTHLY NARRATIVE REPORT OF OPERATION AND MAJOR MAINTENANCE EXPERIENCE This report describes the operating and major maintenance experience for the month of December, 1982. This narrative report was prepared by the plant.
staff and is submitted in accordance with Section 6.9.1.10 of the plant Technical Specifications.
There is no significant operating experience or major safety related maintenance to report.
No challenges to the PORV's or safety valves have been made.
Furthermore, no changes have been made in the Offsite Dose Calculation Procedure, the Environmental Radiological Monitoring Procedure, or any radioactive waste treatment systems.
l l
ADO O
5 PDR R
OFERATING DATA REPORT 50-275 DOCKET NO.
DATE 1/4/82 COMPLETED BY W.J. Kelly TELEPHONE (805)S95=7351 OPERATING STATUS Diablo Canyon Unit 1 Notes
- 1. Unit Name:
Dece@er N
- 2. Reporting Period:
- 3. Licensed Thermal Power (MWt):
166.9 1170
- 4. Nameplate Rating (Gross MWe):
1084 S. De' sign Electrical Rating (Net MWe):
1134
- 6. Maximum Dependable Ca'pacity (Gross MWe):
1084
- 7. Maximum Dependable Capacity (Net MWe):
- 8. If Changes Occur in Capacity Ratings (!: ems Number 3 Through 7) Since Last Report. Give Reasons:
NONE 9. Power Lese!To Which Restricted If Any (Net MWe):
Suspended 1.cw Power Test License
- 10. Reasons For Restrictions,1f Any:
This Month Yr..to Date Cumulatise 0
0 0
- 11. Hours In Reporting Period
- 12. Number Of Hours Reactor Was Critical 0
0 0
- 13. Reactor Reserve Shutdown Hours 0
0 0
0 0
0
- 14. Hours Generator On.Line
- 15. Unit Reserve Shutdown Hours 0
0 0
0 0
0
- 16. Gross Thermal Energy Generated (MWH)
- 17. Gross Electrical Energy Generated (MWH) 0 0
0 0
0 0
- 18. Net Electrical Energy Generated (MWH)
N/A
- 19. Unit Service Factor N/A
- 20. Unit Availability Factor l
- 21. Unit Capacity Factor (Using MDC Net)
N/A N/A
- 22. Unit Capacity Factor (Using DER Net)
- 23. Unit Forced Outage Rate N/A
- 24. Shutdowns Scheduled Oser Next 6 Months (Type.Date.and Duration of Each):
NONE March,1983 (fuel load)
- 25. If Shut Down At End Of Report Period. Estimated Date of Startup:
- 26. Units In Test Status (Prior to Commercial Operation):
Forecast Achiesed MAY 1983 INITIA L CRITICALITY INITI AL ELECTRICITY MAY 1983 COMMERCIAL OPERATION AUGUST 1983 (u/77
50-275 DOCKET NO.
UNIT SilUTDOWNS AND POWER REDUCTIONg UNIT NAME Dieblo Canvon Unit 1 DATE 1/L/82 December 1982 COMPLETED BY W d Kelly REPORT MONTil TELEPflONE (805)595-7351 e,
E e
jg 3
$.5 3 Licensee
,Eg je.
Cause & Corrective No.
Date R
5g js&
Event gg g3 Action to Report
- mO o
$E 5
H 3;jj=g o
Prevent Recurrence u
e o
810928 F
0 H
4 81-002/0lT ZZ ZZZZZZ Halted fuel loading preparations upon discovery of seismic calculation error's. Reanalysis and reviews are being conducted in accordance with Commission's instructions I
2 3
4 F: Forced Reason:
Method:
Exhibit G-Instructions S: Scheduled A Equipment Failure (Explain) l-Manual for Preparation of Data D-Maintenance of Test 2-Manual Scram.
Entry Sheets for Licensee C. Refueling 3-Automatic Scram.
Event Report (LER) File (NUREG.
D Regulatory Restriction 4-Other (Explain) 0161)
E Operator Training & License Examination F Administrative 5
G-Operational Error (Explain)
Exhibit I - Same Source l
(9/77)
Il-Ot her (E xplain)
' AVERAGE DAILY UNIT POWER LEVEL 50-275 DOCKET NO.
UNIT Diablo Canyon Unit 1, 1/4/82 DATE W.J. KELLY COMPLETED BY (805)595-7351 TELEPHONE SIONTH December,1982 DAY AVERAGE D.41L,Y OWER LEVEL DAY AVER AGE DAILY FOWER LEVEL (MWe Net) 0 1
0 37 0
0 2
ig 0
0 3
19 0
0 4
20 0
0 5
7, 0
0 6
22 0
7 23 s
0 24 0
0 0
9 25 0
to 0
26 0
0 1I 27'
.0 0
12 28 0
0 13 29 0
0 14 39 15 0
0 31 0
16 INSTRUCTIONS On this forrnat.hst the average daily unit power loc!in h!We-Net for each day in the reporting month Compute to I e nearest whole megawatt.
l
(*)/77 )
!