ML20071C876
| ML20071C876 | |
| Person / Time | |
|---|---|
| Site: | Millstone |
| Issue date: | 01/13/1983 |
| From: | Mroczka E NORTHEAST NUCLEAR ENERGY CO., NORTHEAST UTILITIES |
| To: | NRC OFFICE OF RESOURCE MANAGEMENT (ORM) |
| Shared Package | |
| ML20071C877 | List: |
| References | |
| MP-4577, NUDOCS 8303080201 | |
| Download: ML20071C876 (1) | |
Text
-
e s>
General Offices e Selden Street, Berlin, Connecticut
)
t
<L = = = = =
January 13, 1983 MP-4577 Director Office of Management Information and Program Control U. S. Nuclear Regulatory Comission Washington, D. C. 20555
Reference:
Facility Operating License No. DPR-65 Dccket No. 50-336
Dear Sir:
This letter is forwarded to previde the report of operating and shutdown experience relating to Millstone Unit 2 Monthly Operating Report 82-12 in accordance with Appendix A Technical Specifications, Section 6.9.1.3.
One additional copy of the report is enclosed.
Very truly yours, NORTHEAST NUCLEAR ENERGY COMPANY
<f,fCe J. Mroczk Station Superintendent Millstone Nuclear Power Station EJM/JG:jms cc:
Director, Office of Inspection and Enforcement, Region I Director, Office of Inspection and Enforcement, Washington, D. C. (10)
U. S. Nuclear Regulatory Commission, c/o Document Management Branch, Washington, D.C. 20555 8303080201 830113 6
PDR ADOCK 05000336 I
R PDR