OPERATING DATA REPORT DOCKET NO. 050-298 DATE l-5-83 COMPLETED BY P. L. Ballinger TELEPHONE 402-825-3811 OPERATING STATUS Notes Cooper Nuclear Station

1. Unit Name:

December 1982

2. Reporting Penod.

2381

3. Licensed Thermal Power (MWt):

836

4. Nameplate Rating (Gross MWe):

778

5. Design Electrical Rating (Net MWe):

787

6. Maximum Dependable Capacity (Gross MWe):

764

7. Maximum Dependable Capacity (Net MWe):
8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report. Give Reasons:
9. Power Level To Which Restricted,if Any (Net MWe):
10. Reasons For Restrictions.lf Any:

i l

This Month Yr.-to.Date Cumulative 744.0 8,760.0 74,545.0 i1. Hours In Reporting Period 744.0 7,484.5 61,370.9

12. Number Of Hours Reactor Was Critical 0.0 0.0-O.0
13. Reactor Reserve Shutdown Hours 744.0 7,414.5 60,372.0
14. Hours Generator On-Line
15. Unit Reserve Shutdown Hours 0.0 0.0 0.0
16. Gross Thermal Energy Generated (MWH) 1,739,928.0 16,372,824.0 120,061,302.0
17. Gross Electrical Energy Generated (MWH) 584,492.,0_,

5,451,441.0 37,932,228.0 565,750.0 5,276,082.0 36,573,460.0

18. Ket Electrical Energy Generated (MWH) 100.0 84.6 81.0
19. Unit Service Factor
20. Unit Availability Factor 100.0 84.6 81.0
21. Unit Capacity Factor (Using MDC Net) 99.5 78.8 64.2 97.7 77.4 63.1
22. Unit Capacity Factor (Using DER Net) 0.0 2.7 3.8
23. Unit Forced Outage Rate
24. Shutdowns Scheduled Over Next 6 Months (Type. Date.and Duration of Each t:

Refueling, May 1, 1983; 4 weeks

25. If Shut Down At End Of Report Period. Estimated Date of Startup:
26. Units In Test Status (Prior to Commercial Operation):

Forecast Achieved

~

INITIAL CRITICALITY l

INITIAL ELECTRICITY l

COMMERCIAL OPERATION 8303000191 830105 PDR ADOCK 05000298 g.q-R PDR i

050-298 DOCKET NO.

UNIT SilUlDOWNS AND' POWER REDUCTIONS UNIT NAME Cooper Nuclear Station DATE January 5. 1983 COMPLETED BY P. L. Ballinner

' REPORT MONTil Decembar TELEPHONE 402-825-3811 jg 3

Y Licensee

,Eg Cause & Corrective 3

Action to No.

nate 3

3g

.3 s 5 Event g?

gU yE 5

j gi g Report 2 mU Prevent Recurrence H

g 6

(NONE DURING REPORTING PERICD.)

j i

2 3

4 F: Forced Reason:

Method:

Exhibit G - Inst ructions S: Scheduled A-Equipment Failure (Explain) 1 -Manual for Preparation of Data B Maintenance or Test 2-Manual Scram.

Entry Sheets for Licensee C Refueling 3 Automatic Scram.

Event Repori (LER) File (NURI G-D-Regulatory Restriction 4 01her (Explain)

Ol611 E-Operator Training & License Examination F-Administrative 5

Exhibit I - Same Source G-Operational Error (Explain) p)/77 )

Il-Ot her (Explain) v m

~

e o

AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.

050-298 Cooper Nuclear Station WIT January 5, 1983 DATE COMPLETED BY P. L. Ballinger TELEPHONE 402-825-3811 MONTH Decer.ber DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWc-Net)

(MWe-Net) '

1 773 772 37 2

778 772 gg 776 771 3

39 776

.773 4

20 5

737 21 773 76 773 6

22 774 7

775 23 e

8 774 24 708 9

773 25 678 10 774 26 649 773 II 27 705 756 774 12

,3 776 773 i

13 9

777 14 30 774 l

15 776 773 31 771 16 l

INSTRUCTIONS On this format, list the average daily unit power levelin MWe-Net for each day in the reporting month. Compute to the nearest whole megawatt.

(9/77) i l

=

1

.a s

OPERATIONS NARRATIVE COOPER NUCLEAR STATION

~

December 1982 The plant operated the month of December with no shutdowns or power reductions.

A capacity factor of 97.7% was achieved for the month, i