OPERATING DATA REPORT DOCKET NO. 050-298 DATE l-5-83 COMPLETED BY P. L. Ballinger TELEPHONE 402-825-3811 OPERATING STATUS Notes Cooper Nuclear Station
- 1. Unit Name:
December 1982
- 2. Reporting Penod.
2381
- 3. Licensed Thermal Power (MWt):
836
- 4. Nameplate Rating (Gross MWe):
778
- 5. Design Electrical Rating (Net MWe):
787
- 6. Maximum Dependable Capacity (Gross MWe):
764
- 7. Maximum Dependable Capacity (Net MWe):
- 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report. Give Reasons:
- 9. Power Level To Which Restricted,if Any (Net MWe):
- 10. Reasons For Restrictions.lf Any:
i l
This Month Yr.-to.Date Cumulative 744.0 8,760.0 74,545.0 i1. Hours In Reporting Period 744.0 7,484.5 61,370.9
- 12. Number Of Hours Reactor Was Critical 0.0 0.0-O.0
- 13. Reactor Reserve Shutdown Hours 744.0 7,414.5 60,372.0
- 14. Hours Generator On-Line
- 15. Unit Reserve Shutdown Hours 0.0 0.0 0.0
- 16. Gross Thermal Energy Generated (MWH) 1,739,928.0 16,372,824.0 120,061,302.0
- 17. Gross Electrical Energy Generated (MWH) 584,492.,0_,
5,451,441.0 37,932,228.0 565,750.0 5,276,082.0 36,573,460.0
- 18. Ket Electrical Energy Generated (MWH) 100.0 84.6 81.0
- 19. Unit Service Factor
- 20. Unit Availability Factor 100.0 84.6 81.0
- 21. Unit Capacity Factor (Using MDC Net) 99.5 78.8 64.2 97.7 77.4 63.1
- 22. Unit Capacity Factor (Using DER Net) 0.0 2.7 3.8
- 23. Unit Forced Outage Rate
- 24. Shutdowns Scheduled Over Next 6 Months (Type. Date.and Duration of Each t:
Refueling, May 1, 1983; 4 weeks
- 25. If Shut Down At End Of Report Period. Estimated Date of Startup:
- 26. Units In Test Status (Prior to Commercial Operation):
Forecast Achieved
~
INITIAL CRITICALITY l
INITIAL ELECTRICITY l
COMMERCIAL OPERATION 8303000191 830105 PDR ADOCK 05000298 g.q-R PDR i
050-298 DOCKET NO.
UNIT SilUlDOWNS AND' POWER REDUCTIONS UNIT NAME Cooper Nuclear Station DATE January 5. 1983 COMPLETED BY P. L. Ballinner
' REPORT MONTil Decembar TELEPHONE 402-825-3811 jg 3
Y Licensee
,Eg Cause & Corrective 3
Action to No.
nate 3
3g
.3 s 5 Event g?
gU yE 5
j gi g Report 2 mU Prevent Recurrence H
g 6
(NONE DURING REPORTING PERICD.)
j i
2 3
4 F: Forced Reason:
Method:
Exhibit G - Inst ructions S: Scheduled A-Equipment Failure (Explain) 1 -Manual for Preparation of Data B Maintenance or Test 2-Manual Scram.
Entry Sheets for Licensee C Refueling 3 Automatic Scram.
Event Repori (LER) File (NURI G-D-Regulatory Restriction 4 01her (Explain)
Ol611 E-Operator Training & License Examination F-Administrative 5
Exhibit I - Same Source G-Operational Error (Explain) p)/77 )
Il-Ot her (Explain) v m
~
e o
AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.
050-298 Cooper Nuclear Station WIT January 5, 1983 DATE COMPLETED BY P. L. Ballinger TELEPHONE 402-825-3811 MONTH Decer.ber DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWc-Net)
(MWe-Net) '
1 773 772 37 2
778 772 gg 776 771 3
39 776
.773 4
20 5
737 21 773 76 773 6
22 774 7
775 23 e
8 774 24 708 9
773 25 678 10 774 26 649 773 II 27 705 756 774 12
,3 776 773 i
13 9
777 14 30 774 l
15 776 773 31 771 16 l
INSTRUCTIONS On this format, list the average daily unit power levelin MWe-Net for each day in the reporting month. Compute to the nearest whole megawatt.
(9/77) i l
=
1
.a s
OPERATIONS NARRATIVE COOPER NUCLEAR STATION
~
December 1982 The plant operated the month of December with no shutdowns or power reductions.
A capacity factor of 97.7% was achieved for the month, i