Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20070V610 + (ML20070V610)
- ML20070V613 + (ML20070V613)
- ML20070V614 + (ML20070V614)
- ML20070V617 + (ML20070V617)
- ML20070V620 + (ML20070V620)
- ML20070V631 + (ML20070V631)
- ML20070V638 + (ML20070V638)
- ML20070V645 + (ML20070V645)
- ML20070V648 + (ML20070V648)
- ML20070V652 + (ML20070V652)
- ML20070V654 + (ML20070V654)
- ML20070V666 + (ML20070V666)
- ML20070V682 + (ML20070V682)
- 0CAN018306, Submits Public Version of Info Clarifying Amend 6 to Emergency Plan,In Response to 821223 Request.Figure 10 Will Be Amended by 830630 to Identify Responsible Positions/ Titles for Notification/Communication Function + (ML20070V684)
- ML20070V686 + (ML20070V686)
- ML20070V687 + (ML20070V687)
- ML20070V689 + (ML20070V689)
- ML20070V767 + (ML20070V767)
- ML20070V779 + (ML20070V779)
- ML20070V792 + (ML20070V792)
- ML20070V799 + (ML20070V799)
- ML20070V803 + (ML20070V803)
- ML20070V805 + (ML20070V805)
- PLA-1508, Final Deficiency Rept Re Inadequacies W/Design,Mfg & Installation of Pacific Scientific Shock Suppressors & Associated Itt Grinnell Clamps.Initially Reported on 820820. Specs & Procedures Revised.Also Reported Per Part 21 + (ML20070V813)
- ML20070V815 + (ML20070V815)
- ML20070V823 + (ML20070V823)
- ML20070V826 + (ML20070V826)
- ML20070V835 + (ML20070V835)
- ML20070V840 + (ML20070V840)
- ML20070V845 + (ML20070V845)
- 05000275/LER-1983-001, Forwards LER 83-001/03L-0 + (ML20070V856)
- 05000275/LER-1983-001-03, /03L-0:on 830107,during Recorder Check Prior to Fuel Load,Steam Generator Blowdown Multipoint Flow Recorder 1-71 Discovered Inoperable.Caused by Broken Print Head Drive String.String Replaced + (ML20070V889)
- ML20070V901 + (ML20070V901)
- ML20070V917 + (ML20070V917)
- PLA-1509, Final Deficiency Rept Re Inadequate Restraint Provided by Pipe Friction Clamp Anchors.Initially Reported on 820723. Drawings Revised & Previously Accepted Friction Clamps to Be Reinspected & Reworked.Also Reported Per Part 21 + (ML20070V921)
- 05000266/LER-1983-001, Forwards LER 83-001/03L-0 + (ML20070V932)
- ML20070V947 + (ML20070V947)
- ML20070V949 + (ML20070V949)
- 05000266/LER-1983-001-03, /03L-0:on 830104,during Normal Operation,Panel D-400 Became Inoperable.Caused by Failed Power Supply.Power Supply Replaced W/Upgraded Components + (ML20070V957)
- B13790, Forwards Engineering Evaluation of 910323 Overpressurization Event.Util Concludes That Integrity of Affected Components Was Not Compromised + (ML20070V958)
- 0CAN049105, Provides Historical Info Re Fitness for Duty Actions & Drug Testing Statistics for Four Previous Years + (ML20070V963)
- ML20070V980 + (ML20070V980)
- ML20070V984 + (ML20070V984)
- ML20070V990 + (ML20070V990)
- 0CAN028313, Requests That 830216 Appeal Meeting Be Rescheduled,Since NRC Handling of Partial Suppression Sys as Generic Issue Does Not Relieve Utils of Having to Address Issue on Individual Basis.Fire Protection Remains Highest Priority + (ML20070V994)
- ML20070V996 + (ML20070V996)
- ML20070W001 + (ML20070W001)
- ML20070W002 + (ML20070W002)
- 05000316/LER-1983-015, Forwards LER 83-015/03L-0 & 83-016/03L-0 + (ML20070W003)
- 05000316/LER-1983-015-03, /03L-0:on 830113,contractor Personnel within Reactor Cable Tunnel Area W/O Required Number of Fire Watches.Area Vacated Until Proper Number of Fire Watches Established.Procedure Requirements Reviewed + (ML20070W012)
- 05000361/LER-1983-012, Forwards LER 83-012/03L-0.Detailed Event Analysis Submitted + (ML20070W013)