ML20070V826
| ML20070V826 | |
| Person / Time | |
|---|---|
| Site: | McGuire, Mcguire |
| Issue date: | 04/02/1991 |
| From: | Tuckman M DUKE POWER CO. |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| References | |
| NUDOCS 9104120140 | |
| Download: ML20070V826 (5) | |
Text
11 I
s nacin <cvmnm y s 7,,
% frus 1%h run thp!
- ,. p,m;,,
j l? ~
mv! pv?
n,
DUKE POWER April 2, 1991 U.S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, D.C.
20555
Subject:
McGuire Nuclear Station Docket No. 50-369, -370 Selectaa Licensee Commitments Manual Gentlemen:
Pursuant to 10 CFR 50.4 and 50.71, please find attached 7 copies of Revision dated 3/91 to the McGuire Selected Licensee Commitments Manual. The SLC Manual is Chapter 16.0 to the McGiire FSAR. This manual is meant to contain commitments and other station issues that we believe warrent high6i control, but are not appropriate in the Technical Specifications (TS). Instead of being updated with the annual FSAR Update, the SLC Manual will be updated as needed during the year.
Very trul youre, e E* \\%
M.S. Tuckman HAF/haf Attachment 9104120140 910402
' {'
/
l V
PDR ADOCK 05000369 P
11 I
l (h,kr Ibwer Consrata
(, ?, t, t:3 t< >l)
% inn hc,loctwn I?rtwimert!
l n It n 10n,*
6
,-l Chs: rte te AC:n.'ol !an
- r
)
x>
OUKE POWER March 28, 1991 RE:
McGuire Nuclear Station Selected Licensee Commitments Please ro*/ise your copy of the Selected Licensee Commitments manual es follows:
Remove rhese pages Insert these pages LOEP 1 LOEP 1 16.2-1 16.2-1 16.2-2 16.2-2 If you have any questions or probioms, I may be contacted at (704) 373-7720.
R. L. Gill, Jr., Technical System Managar i
Regulatory Compliancef
'J jj
/
}
t By:
Helen Froebe Regulatory Compliance HAF/hf o_.
u.J
i a
G e
- (')
McGuire Nuclear Station
'd-Selected Licensee Commitments List of Effective Pages Page Revision Date Cover Letter Selected Licensee Commitment Tab LOEP Tab LOEP 1 03/91 LOEP 2 10/90 LOEP 3 10/90 L0EP 4 10/90 LOEP 5 10/90 LOEP 6 12/90
('^)
LOEP 7 02/90
,J Tab 16.0 16.0-1 16.0-2 16.1 16.1-1 Tab 16.2 16.2-1 03/91 16.2-2 03/91 16.2-3 16.2-4 Tab 16.3 16.3-1
(,)
b/
Page 1 03/91 l
i
.t
' 16.2
' APPLICABILITY This section provides the general requirements applicable to each of the Commitments and Testing Requirements _within Section 16.0, Selected Licensee
. Commitments.
16.2.1 This item defines the applicability of each specification in terms of defined OPERATIONAL MODES or other specified conditions and is provided to delineate specifically when each specification is applicable.
Compliance with the Commitments contained in the succeeding sections is required during the OPERATIONAL MODES or other conditions specified therein; except that E
upon failure to meet the Comitment, the associated Remedial Actions shall be met.
16.2.2_
This item defines those conditions necessary to constitute compliance with the terms of an individual Commitment and associated Remedial Action.
Noncompliance with a Commitment shall exist when the requirements of Comitment and associated Remedial Actions are not met within the specified time intervals.
If compliance with the Commitment is restored prior to expiration of the speci.
fied time intervals, completion of the Remedial Actions is not required.
16.2.3 This item delineates the measures to be taken for those circumstances not directly provided for in the Remedial Action statements and whose occur _rence would violate the intent of a commitment.
When a Commitment is not met, except as provided in the associated Remedial Actions, the Station Manager and/or the Responsible Group Superintendent Will determine any-further actions.
16.2.4 Entry into an OPERATIONAL MODE or other specified condition shall not-be made when the conditions for the Commitment are not met and the associ-ated Remedial Action requires a shutdown if they are not met within a specified time interval.
Entry-into an OPERATIONAL MODE or specified condition may be made in accordance with the Remedial Action requirements when conformance to them-permits -continued operation of the facility for an unlimited period of time.
.This provision shall not prevent passage through or_to OPERATIONAL MOCES as required to comply with-Remedial Action. requirements.
Exceptions to~
these requirements are stated in the individual commitments.-
16.2-1 3/91
W. (
4 l
16.2.5 This item delineates the applicability of each comitment to Unit 1 and Unit 2 operation.
Commitments including the associated Remedial Actions shall apply to each unit individually unless _otherwise indicated as follows:
a.
Whenever the Commitment refers to systems or components which are 1
shared by both units, the Remedial Actions will apply to both units simultaneously.
This will be indicated-in-the Remedial Actions; b.
Whenever the Commitment applies to only one unit,' this will be identified in the-APPLICABILITY section of the commitment; and
-c.
Whenever certain-p'ortions of a commitment contain operating parameters,-setpoints etc., which are different for each unit, this will be identified in parentheses or footnotes.
(For example,
... flow rate of 54,000 cfm (Unit 1) or 43,000 cfm (Unit 2)..."),
- 16,2.6 This. item provides that_ Testing Procedures are necessary to ensure the commitments are met and will be performed during the OPERATIONAL MODES or other conditionsf for which the comitments are applicable.
Provisions for additional Testing Procedures-to be performed without regard to the applicable OPERATIONAL MODES or other conditions are provided in the individual Testing Procedures, Testing _ Procedures for Special conditions need only be performed when the i
Special'Condi' tion is being utilized as-an exception to an individual commitment.
F Testing Procedures'shall be performed during the OPERATIONAL MODES or other conditions-specified for individual commitment unless otherwise stated in an individual Testing Procedure or-Reference, 16.2.7-This item provides allowable tolerances for performing testing activities' beyont' those specified in the nominal testing frequency. The-
-tolerance'is necessary to provide operational flexibility because of scheduling and performance considerations, The phrase "at least" associated with a testing frequency dcas not negate this allowable tolerance value and permits the-performance of more frequent surveillance activities.
Leach Testing Procedure _shall be performed on its specified frequency with.c
?
maximum allowable extension not to exceed 50% of the test frequency.
16,2,8
. This' item' sets forth the' criteria for determination of compliance with the OPERABILITY-requirements of the commitment. Under this criteria, equipment, L
systems or components are assumed to be OPERABLE if the associated testing-p, procedures have been satisfactorily performed within the specified test T
frequency.
Nothing in this provision is to be construed as defining equipment, systcms or components OPERABLE, Cler, such items are found or known to be -
inoperable although still meeting the testing requirements.
16.2-2 3/91 l'
{
?we-'-
p ow-u'
+
rwyw m
+-
-m e*-
e, es tJrm n