__

s, .

WATERFORD 3 SES PLANT OPERATING MANDAL T

LOUISIANA 20WEFv & LIGHT NN EP-1-010 POM VOLUME la REVISION 1 .

POM SECTION 1 APPROVAL DATE: J A N 2 ' I , e, ,>

EFFECTIVE DATE:

,a EMERGENCY PLAN IMPLEMENTING INSTRUCTION s

, UNUSUAL EVENT LP&L W-3 RECORDS UNCONTROLLED COPY

' DO NOT USE IN ANY SAFETY-RELATED TESTING, MAINTENANCE, OR OPERATIONAL ACTIVITY PORC Mee ing No. f3-diA/ I Reviewed:

3RC Chai i Approved: o%

Plant Manager-Nuclear W.-

8302170461 830215 PDR ADOCK 05000382 F PDR

-- = - - , ~ - , , . - , ,, nr-e me n -. m,,- - . -..~m-,=====n==__--n==_=- en_ .=

, Emergency Plan Implementing Instruction , EP-1-010 Unusual Event Revision 1 TABLE OF CONTENTS 1.0 PURPOSE 3.0 EEFERENCES 3.0 RESPONSIBILITIES 4.0 INITIATING CONDITIOFS -

5.0 PROCEDURE 6.0 FINAL CONDITIONS -

7.0 ATTACHMENTS 7.1 Procedure Reference for 1dditional Response Guidelines (1 page)

LIST OF EFFECTIVE PAGES -

~

Title Revision 1 l l 1-7 Revision 1 e

M

,, -~*

es 1

._.-..._--.m___-__ , ....., m . y n _ 7.-.., m r ,__ _ _ ,_yy. ., , u.m .-,,,. __

Emergency Plan' Implementing Instruction EP-1-010 Unus'ual Event '

Revision 1 i

1.0 PURPOSE To outline the actions to be taken for an emergency condition at the Unusual Event Level.

2.0 REFERENCES

2.1 Waterford 3 SES Emergency Plan 2.2 EP-1-001, Recognition and Classification of Emergency Conditions 2.3 EP-3-050, Emergency Response Call List 2.4 EP-1-020, Alert 2.5 EP-1-030, Site Emergency 2.6 EP-1-040, General Emergency '

27 EP-2-010, Notifications and Communications 2.8 EP-2-031, In-Plant Radiological Controls During Emergencies 29 EP-2-100, Technical Support Center (TSC) Activation, Operation, and Deactivation 2.10 EP-2-101, Operational Support Center (OSC) Activation, Operation, and Deactivation 2.11 EP-2-150, Emergency Records 3.0 RESPONSIBILITIES The Emergency Coordinator is responsible for ensuring that the l

actions as outlined in this procedure are carried out.

4.0 INITIATING CONDITIONS

. This procedure is to be initiated upon reaching the following conditions:

4.1 Whenever an Unusual Event is recognized and classified per EP-1-001.

2

=:==== ==== _=- m- ~~~--m .

..r , ,-m , - - - A

. s.' .

.Exergency Plan Implementing Instruction EP-1-010 Unusual Event Revision 1 4.2 At the direction of the Emergency Coordinator.

5.0 PROCEDURE 5.1 Sound the appropriate alarm as necessary:

5.1.1 Fire .

5.1.2 Station -

5.2 Make the following announcement (s):

5.2.1 Attention all personnel; attention all personnel: An Unusual l Event has,been declared. All members of the On-Shift Emergency Organization report to your stations. All other personnel should continue with their normal dutie3-unless further instruction is

. given. The maintenance radio frequency is now dedicated for emergency use only.

5.2.2 If there is a localized emergency (e.g., fire), announce its type I

and location and instruct personnel to stand clear of this area.

5.2.3 Repeat the announcement (s).

5.3 Make initial contact with. Plant Manager-Nuclear.

NOTE See Emergency Response Organization Status Board for naces and phone numbers;.also see EP-3-050.

5.3.1 Dial the Plant Manager-Nuclear's home phone number. If during the day, dial his work number.

5.3.? If contact cannot be established in step 5.3.1, then dial the' Plant Manager-Nuclear's mobile telephone number.

3

.,., y ,.. . . - . . _ , . , .,.. __ . _ . . . . _ - . _ - . . _ _ . . _ . . _ -_m... , s. _ __

, Emergency Plan Implementing Instruction EP-1-010 Unusual Event Revision 1 5.3.3 If contact cannot be established in step 5 3 2, then contact the Operations and Maintenance Assistant Plant Manager-Nuclear using steps 5 3.1 to 5 3 2.

5.3.4 If the Operations and Maintenance Assistant Plant Manager-Nuclear cannot be contacted, then contact the Operations Superintendent.

5 3.5 Upon contact with one of the above individuals, discuss the following:

5.3.5.1 Nature of situation 5.3.5.2 Classification 4

5.3.5 3 Action taken or to be taken 5.3.5.4 Need to activate emergency response facilities 5.3.5.5 Ensure that the Vice President', Nuclear Operationc is contact'ed. .

5.4 If. activation of 30-minute responders is necessary, then provide the Emergency Communicator with the proper pre-recorded cassetten or l complete Attachment 7.3 of EP-2-010, Answering Machine Message,,and direct the Emergency Communicator to activate the 30-minute responder Emergency Pager System in accordance with EP-2-010, At-tachment 7.2.

5.5 Complete Attachment 7.5 of EP-2-010, Initial Notification Form, and provide to the Emergency Communicator. Direct that he/she commence j initial offsite notifications in accordance with EP-2-010 and' inform him/her which notifications should be made.

5.5.1 St. Charles Parish Emergency Operations Center (EOC) 5.5.2 St John the Baptist Parish EOC 5.5.3 Louisiana Nuclear Energy Division (LNED) 5.5.4 Louisiana Office of Emergency Preparedness (LOEP) 5.5.5 Waterford 1 and 2 4

, .n,..,,,,n.w.,,_---,--.-n-- -


n--- , , - - - _ . , - -

'Energency Plan Implementing Instruction EP-1-010 Unusual Event Revision 1

, 5.5.6 Middle South Utilities 5.5 7 U.S. Coast Guard 5.5.8 Missouri Pacific Railroad 5.5.9 American Nuclear Insurers (ANI) 5.5.10 Nuclear Regulatory Commission (NRC) _

5.6 As additional information becomes available, update the Emerg'ncy e Communicator by completing Attachment 7 7 of EP-2-010, Follow-Up Notification, and direct the Emergency Communicator to conduct additional updates to offsite agencies in accordance with EP-2-010 on a continual basis. .

5.7 If activation of the TSC and OSC is necessary, sthen direct that the Emergency Communicator activate' the 1-hour responder Emergency Pager

~

System in accordance with EP-2-010, and ensure that EP-2-100 and EP-2-101 are implemented.

5.8 Ensure that logs / records are kept in accordance with EP-2-150.

5.9 Direct a Health Physics Technician to initiate in-plant radiological controls in accordance with EP-2-031 if a real or potential radiological hazard exists.

5.10 Initiate any additional response measures in accordance with applicable emergency procedures listed on Attachment 7.1.

5.11 As conditions change, periodically check EP-1-001 to determine whether ' reclassification is necessary.

5.11.1 If reclassification is necessary, then reclassify the emergency in accordance with EP-1-001 and implement appropriate -

Implementirs Instruction EP-1-020, EP-1-0.30, or EP-1-040.

5.11.2 If closeout is appropriate, then close cut the emergency with a verbal summary to all agencies / personnel as indicated on At-tachment 7.13 of EP-2-010.

5 ,

n , l m .~. n

, ,. ,, n . --=c-m - -=m- = ,  ?=m ~~ m = - t

,Energency Plan Implementing Instruction EP-1-010 Unusual Event Revision 1 6.0 FINAL CONDITIONS 6.1 Oncoming Emergency Coordinator contacted.

6.2 Initial offsite notifications initiated.

6.3 The Unusual Event has been closed out with normal station a'dministration resumed or the emergency is reclassified.

7.0 ATTACHMENTS 7.1 Procedure Reference for Additional Response Guidelines b

o t

i I

l l

6 c,__..__,... _ . _ - - - . . , . - . . .

,,.-..,.,.,-.m

Y d PROCEDURE REFERENCE FOR ADDITIONAL RESPONSE GUIDELINES Tonic Reference

(

Personnel EP-2-020, Contaminated Injured /Ill Personnel EP-2-030, Emergency Radiation Exposure Guidelines and Controls EP-2-032, Monitoring and Decontamination EP-2-081, Search and Rescue Toxic, Gas, Train EP-2-110, Man-Caused Emergencies Derailment, Airplane Crash, Explosion, Transportation -

Accidents Tornado, Hurricane, EP-2-120, Natural Emergencies Flood Radiation Releases EP-2-060, Radiological Field .

Konitoring s

Emergency Facilities EP-2-102, Emergency Operations Facility (EOF) Activation ~, Operation and Deactivation Administration EP-2-130, Emergency Team Assignments EP-2-140, Reentry EP-2-170, Recovery EP-3-050, Emergency Response Call List EP-3-060, Emergency Communications Guidelines EP-1-010 Revision 1 7 Attachment 7.1 (1 of 1)

. ~.-,e.... -...-e.... . . my e .

aygm m ,pm q. _(.,_

_, ._s_ _y s,-_.3,m p __.ry_3______,._ggg._,_

s ,

WATERFORD 3 SES

~

PLANT OPERATING MANDAL LOUISIANA POWER & LIGHT EP-1-020 PCM VOLUME 18 REVISION 1 1 '

POM CECTION APPROVAL DATE: - - -

, EFFECTIVE DATE:

EMERGENCY PLAN IMPLEMENTING INSTRUCTION ALERT ,

LP&L W-3 RECORDS UNCONTROLLED COPY DO NOT USE IN ANY SAFETY-RELATED Ni m OR OPERATIONAL ACTivlTY PORC Meeting No. f3-024 1 Reviewed: _

5 Chairman J Approved: _

II.bAILL T

l Plant Manager-l Nuclear i

l

4

'Edergency Plan Implementing Instruction EP-1-020 '

Alert Revision 1 TABLE OF CONTENTS 1.0 PURPOSE

2.0 REFERENCES

3.0 RESPONSIBILITIES

  • 4.0 INITIATING CONDITIONS ,

5.0 PROCEDURE 6.0 FINAL CONDITIONS 7.0 ATTACHMENTS 7.1 Procedure Reference for Additional Response Guidelines (1 page) c LIST OF EFFECTIVE PAGES '

Title Revision 1 1-7 Revision 1 l

l 1

1 l -.,_.;_. , ~ . - ,

.,_7.-_ --....-.m.;~,,.-----._-,.---,,;-

_r- -tmm_-m.m ,y_.m me w -__

Em'ergency Plan Implementing Instruction ~ EP-1-020 Alert Revision 1 1.0 PURPOSE

  • To outline the actions to be taken for an emergency condition at the Alert Level.

2.0 REFERENCES

2.1 Waterford 3 SES Emergency Plan 2.2 EP-1-001, Recognition and Classification of Emergency Conditions 2.3 EP-1-010, Unusual Event 2.4 EP-1-030, Site Emergency 2.5 EP-1-040, General Emergency 2.6 EP-2-010, Notifications and Communications ' <

, 27 EP-2-031, In-Plant Radiological Controls During Emergencies 2.8 EP-2-050, Offsite Dase Assessment (Manual)

. 2.9 EP-2-051, Offsite Dose Assessment (Computerized) 2.10 EP-2-052, Protective Action Guidelines 2.11 EP-2-060, Radiological Field Monitoring 2.12 EP-2-100, Technical Support Center (TSC) Activation, Operation, and Deactivation 2.13 EP-2-101, Operational Support Center (OSC) Acti-vation, Operation, and Deactivation 2.14 EP-2-150, Emergency Records 2.15 EP-3-ObO, Emergency Response Call List 3.0 RES PONSIBILITIES .

The Emergency Coordinator is responsible for ensuring that the actions outlined in this procedure are carried out.

2

, _ - =...- , . . ~ .: . , . , . - - = , - - - - - - - - , - . - - , - - - .-- ,- - Q

'Em'ergency Plan Implementing Instruction EP-1-020 Alert Revision 1 4.0 INITIATING CONDITIONS This procedure is to be initiated upon reaching the following conditions:

4.1 Whenever an Alert is recognized and classified in accordan'ce with EP-1-001.

4.2 At the direction of the Emergency Coordinator.

5.0 EERCEDURE 5.1 Sound the appropriate alarm as necessary:

5.1.1 Fire

~~~ '

5.1.2 Station s 5.2 Make the following announcement (s):

5.2.1 Attention'all personnel; attention all personnel. An Alert has been declared.- All members of the Technical Support Center and the Operational Support Center report to your stations. All other personnel await further instructions. (If the emergency is radiation oriented, add: There will be no smoking, eating or drinking until further notice.) The Maintenance radio frequency is now dedicated for emergency use only.

l 5.2.2 If there is a localized emergency (e.g., fire), announce its type and location, and instruct personnel to stand clear of this area.

l 5.2 3 . Repeat the announcement (s). -'

l - . - - -

, 53 Make initial contact with the Plant Manager-Nuclear.

l l NOTE .

See the Emergency Response Organization Status Board for names and phone numbers; also see EP-3-050.

3 e ._ ,-.. , y .7 . :_.._.- . w -_. _ .-.._ ..- ~ -- .- .. _ - ... _ ..

Em'ergency Plan Implementing Instruction EP-1-020 Alert Revision 1

.~

5.3.1 Dial the Plant Manager-Nuclear's home phone number. If during the day, dial his work number.

5.3.2 If contact cannot be established in step 5.3.1, then dial the Plant Manager-Nuclear's mobile telephone number.

  • 5.3.3 If contact cannot be established in step 5.3.2, then contact the Operations and Maintenance Assistant Plant Manager-Nuclear- using steps 5 3.1 and 5.3.2.

5 3.4 .If the Operations and Maintenance Assistant Plant Manager-Nuclear ,

cannot be contacted, then contact the Operations Superintendent.

5.3.5 Upon contact with one of the above individuals, discuss the following- ,

s 5.3 5.1 Nature of the situation t

5.3 5.2 Classification 5.3.5 3 Action taken or to be taken 5.3.5.4 Need to activate emergency response facilities 5.3.5.5 Ensure that the Vice President-Nuclear Operations is contacted.

5.4 Provide the Emergency Communicator with the proper pre-recorded cassettes or complete Attachment 7.3, Answering Machine Message, of EP-2-010. Direct the Emergency Communicator to activate the 30-minute responder and 1-hour responder Emergency Pager Systems in accordance with Attachment 7 2 of EP-2-010.

5.5 Complete Attachment 7 5, Initial Notification Form, of EP-2-010 and provide it to the Emergency Communicator. Direct that he commence initial offsite notifications in accordance with EP-2-010 and inform him of which of the following notifications should be made.

5.5.1 St. Charles Parish Emergency Operations Center (EOC) 5.5.2 St. John the Baptist Parish EOC 4

-- . , . - , , , - .,m,m,.,.m.--.,.,_..,. - , - , - - . . -- - - - - - . . . , - . - -

m Emergency Plan Implementing Instruction

([EP-1-02 Alert

' Reg 5.5.3 Louisiana Nuclear Energy Division (LNED) l 5.5.4 Louisiana Office of Emergency Preparedness (LOEP) 5.5.5 Waterford 1 and 2 5.5.6 Middle South Utilities 5.5.7 U.S. Coast Guard . -

5.5.8 Missouri Pacific Railroad l l

5.5.9 American Nuclear Insurers (ANI) 5.5.10 Institute of Nuclear Power Operations (INPO) 5.5.11 Nuclear Regulatory Commission _(NR.C) 5.6 As additional information becomes available, update the Emergency Communicator by completing Attachment 7 7, Follow-up Notification, I

of EP-2-010. Direct the Emergency Communicator to conduct additional updates to offsite agencies in accordance with EP-2-010 on a continual basis.

5.7 Initiate offsite dose assessment in accordance with EP-2-050 for manual assessment or EP-2-051 for computerized assessment.

Determine the need for protective action recommendations in ac-cordance with EP-2-052, Protective Action Guidelines.

5.8 If radiological releases are occurring, instruct the Health Physics Coordinator to activate Radiological Field Monitoring Teams in ac-cordance with EP-2-060.

l 5.9 Activate the Technical Support Center in accordance with EP-2-100.

5.10 Activate the Operational Support Center in accordance with  !

EP-2-101.

5.11 Direct the Health Physics Coordinator and/or the Radiological Controls Coordinator to initiate in-plant radiological controls in accordance with EP-2-031 if a potential radiological hazard exists.

5 m mmvm. , ,_-..,w-r-=,-=.mg.~~, xs.arer,n- ww =wwy ~~ r- sy~ -cr yc:~~ ,~~~ " ~ -~. ~ w m - e e- --' - *~ v"- ~~*-- -

~~- r m--

Energency Plan Implementing Instruction '

EP-1-020 Alert Revision.1 5.12 Ensure that emergency logs / records are kept in accordance with EP-2-150. .

5.13 Initiate any additional response measures in accordance with the applicable emergency procedures listed on Attachment 7 1.

5.14 Ensure that Technical Advisors are dispatched to local Parish Emergency Operation's Centers. -

5.15 As conditions change, periodically check EP-1-001 to determine whether reclassification is necessary.

5.15.1 If reclassification is necessary, then reclassify emergency in accordance with EP-1-001 and implement the appropriate Emergency Plan Implementing Instructiont_ EP-1-010, EP-1-030 or EP-1-040.

5.15.2 If closeout is appropriate, then close out the emergency with a verbal summary to all agencies / personnel as indicated on At-tachment 7.13 of EP-2-010.

I 6.0 FINAL CONDITIONS 6.1 The oncoming Emergency Coordinator is contacted.

6.2 The EOF Director is contacted.

6.3 Initial offsite notifications are initiated.

6.4 The Alert has been closed out with n:rmal station administration resumed or the emeriency is reclassified.

70 ATTACHMENTS 7.1 Procedure Reference for Additional Response Guidelines 6

-, . e w,-- vn,-.--: ~ m . w .~ m .-- w.n ,.-.-,.= ,. -,:s ~:.. c= , -

e. .

, e' e

PROCEDURE REFERENCE FOR ADDITIONAL RESPONSE GUIDELINES 199La Reference Personnel EP-2-020, Contaminated Injured /Ill Personnel EP-2-030, Emergency Radiation Exposure Guidelines and Controls EP-2-032, Monitoring and Deccr.tamination EP-2-081, Search and Rescue Toxic Gas, Train EP-2-110, Man-Caused Emorgencies Derailment, Airplane -

Crash, Explosion, Transportation l Accidents -

l Tornado, Hurr'icane, EP-2-120, Natural Emergencies Flood __ ,

Emergency Facilities EP-2-102, Emergency Operations Facility (EOF) ,

Activation, Operation, and .

)

Deactivation .

l l l l Administration EP-2-130, Emergency Team Assignments 1 EP-2-140, Reentry ,

1 EP-2-170, Recovery l

EP-3-001, Emergency Plan Abstract EP-3-050, Emergency Response Call List i EP-3-060, Emergency Communications Guidelines i

EP-1-020 Revision 1 7 Attachment 7.1 (1 of 1)

I i

- wr 2 =_'_ m -. . .=c- -

. , w.m &m-~"~ ~~ wr ~-~~=--"'mme""~ ~ ' ' ' ' " ' ' ' ' ' "~

s. .-

WATERFORD 3 SES PLANT OPERATING MANDAL T LOUISIANA POWER & LIGHT MM EP-1-030 PON VOLUME 18 REVISION 1 .

POM SECTION 1 APPROVAL DATE: 'lA . ,20 IO EFFECTIVE DATE:

m EMERGENCY PLAN IMPLDfENTING INSTRUCTION SITE EMERGENCY LP&L W-3 RECORDS UNCONTROLLED COPY DO NOT USE IN ANY SAFETY-RELATED TESTING.

MAINTENANCE. OR OPERATIONAL ACTIVITY PORC Mee ing No. ef3.42 4 s Reviewed:

Approved:

Plant Manager-Nuclear l

+-ye eme t-bv=e weem W- ,M**we e eo ,g, _

e p g 9 g g g y,_ y q- p g gp @ eng ,sy go pg g4 egs pi W W

'Ensegency Plan Inplcmsnting Instruction EP-1-030

, Sit,e Emergency Revision 1 TABLE OF CONTENTS 1.0 PURPOSE 2.0 , REFERENCES 3.0 RESPONSIBILITIES 4.0 INITIATING CONDITIONS 5.0

~

PROCEDURE 6.0 FINAL CONDITIONS 7.0 ATTACHMENTS 7.1 Procedure References for Additional Response Guidelines (1 page) l LIST OF EFFECTIVE PAGES Title ,

Revision 1 i 1-10 Revision 1 l

9 1

. . , . ,. _ , . .,, ._, y , ,y,y_,,_ ,. ., .y. ,v ,

Ensrgsncy Plan Inplenanting Instruction EP-1-030

' Site

  • Emergency Revision 1
1.0 PURPOSE To outline the actions to be taken for an emergency condition at the Site Emergency level.

2.0 REFERENCES

2.1 Waterford 3 SES Emergency Plan -

2.2 EP-1-001, Recognition and Classification of Emergency Conditions 2.3 EP-3-050, Emergency Response Call List 2.4 EP-1-010, Unusual Event -

l 2.5 EP-1-020, Alert 2.6 EP-1-040, General Emergency 27 EP-2-010, Notifier', ions and Communications '

2.8 EP-2-031, In-Plant Radiological Controls During Estrgenc'ies

, 2.9 EP-2-050, Offsite Dose Assessment (Manual)

- 2.10 EP-2-051, Offsite Dose Assessment (Computerized) 2.11 EP-2-060, Radiological Field Monitoring 2.12 EP-2-070, Protected Area Evacuation 2.13 EP-2-100, Technical Support Center (TSC) Activation, Operation, and Deactivation i

2.14 EP-2-101, Operational Support Center (OSC) Activation, Operation, and Deactivation i

i 2.15 EP-2-102, Emergency Operations Facility (EOF) Activation, Opera-tion, and Deactivation 2.16 EP-2-150, Emergency Reports 2.17 EP-2-052, Protective Action Guidelines l

2

- . r w., r = w-  :=---.=:,--=..,-=- - - ., .- : -- r :- -.--, ---. w::,

_w ..w a

Encrg'ancy Plan Impicasnting Instruction EP-1-030 Site. Emergency Revision 1 3.0 RES PONSIBILITIES The Emergency Coordinator is responsible for ensuring that the actions as outlined in this procedure are carried out.

4.0 INITIATING CONDITIONS This procedure is to be initiated upon reaching the following conditions:

4.1 Whenever a Site Emergency is recognized and classified in accordance with EP-1-001 4.2 At the direction of the Emergency Coordinator 5.0 PROCEDURE 5.1 Sound the appropriate alarm as necessary:

5.1.1 Fire 5.1.2 Station 5.2 Make the following announcement (s): -

I t

l .

7.,...,..,..-.m.=-,--.

. - -.== = . :. . . . : _ . , , - _..,,-._.--.=:-- .

,m. -

m

'Encr~goney Plen Implcmsnting Instruction EP-1-030

.. Sita Emergency Revision 1 NOTE A Protected Area evacuation is requirad at a Site Emergency. If conditions do not prevent personnel from assembling at either of the onsite assembly areas, then proceed to step 5.2.1. If conditions (such as a radioactive plume passing over the Administration Building parking lot) prevent personnel from mustering at one of the onsite -

assembly areas, then the following announcement should be made: -

Attention all personnel; attention all personnel.

A Site Emergency has been declared. All members of the Emergency Organization report to your i stations. Due to plant conditions, all nonessential personnel must proceed immediately to'the (state one of the locations ~: St John the Baptist.

Catholic Church or Monsanto Park area). Upon arrival, all supervisors shall assemble and log their personnel. Personnel in rediation controlled areas proceed to the Health Physics control points.

There will be no smoking, eating or drinking until further notice. The maintenance radio frequency is now dedicated for emergency use only.

Repeat the message.

5.2.1 Attention all personnel; attention all personnel: a Site Emergency has been declared. All members of the Emergency Organization report to your stations. All other personnel within the Protected Area, Trailer City Area and Administration Building Area report to the Administration Building parking lot. All other personnel within the Construction Area report to the parking lot south of the Ebasco Building. All personnel in radiation controlled areas proceed to the Health Physics control points.

4

...,--,_.....x~.yy._y..

..t ,y . . . - . . . _ , - - . _ . - . . .-- _ _.. ..~.. .-

'Etargency Plan Impismanting Instruction EP-1-030

'+ Site Emergency j Revision 1 There will be no smoking, eating or drinking until further

, notice. The maintenance radio frequency is now dedicated for emergency use'only.

5.2.2 If there is a localized emergency (e.g., fire), announce its type and location and instruct personnel to stand clear of this area.

5.2.3 Repeat the announcement (s).

5.2.4 Dispatch a Health Physics Technician and the Assembly Area

~

Supervisor, if appropriate, to the appropriate assembly area.

! 5.3 Make initial contact with Plant Manager-Nuclear.

NOTE See Emergency Response Operation Status Board for names and phone numbers;' also see._EP-3-050.

\

5.3.1 Dial the Plant Manager-Nuclear's home phone number. If during the work day, dial his work number.

5.3.2 If contact cannot be established in step 5.3.1, then dial Plant Manager-Nuclear's mobile telephone number.

5.3.3 If contact cannot be established in step 5 3.2, then contact Operations and Maintenance Assistant Plant Manager-Nuclear, using steps 5.3.1 and 5.3.2.

5.3.4 If Operations and Maintenance Assistant Plant Manager-Nuclear can-not be contacted, then contact the Operations Superintendent.

5.3.5 Upon contact with one of the above individuals, discuss the following:

5.3.5.1 Nature of situation 5.3.5.2 classification 5.3.5.3 Action taken or to be taken 5

_ _ _ _ _ , . . _ . _ _ .. ,__.,.....,mm. _,...m.....

7 . , _.

Ensrg's'ncy Plan Impicnsnting Instruction EP-1-030

' ..Si te.. Emer ge nc y Revision 1 5.3.5.4 Need to activate emergency response facilities 5.3.5.5 Ensure Vice President-Nuclear Operations is contacted.

5.4 Provide the Emergency Communicator 'with the. proper prerecorded cassettes, or complete Attachment 7.3, Answering Machine Message, of l EP-2-010, and direct the Emergency Communicator-to activate the 30-minute responder and 1-hour responder Emergency Pager Systems in l

accordance w'ith EP-2-010.

l 5.5 Complete Attachment 7 5, Initial, Notification Form, of EP-2-010, and provide to the Emergency' Communicator. Direct that he/she commence initial offsite notifications in accordance with EP-2-01.0 and inform him/her which notifications should be made.

5.5.1 St. Charles Parish Emergency Operations Center (EOC) 5.5.2 St. John the Baptist Parish EOC ' ' ,

. 5.5.3 Louisiana Nuclear Energy Division (LNED) .

f 5.5.4 Louisiana Office of Emergency Preparedness (LOEP) 5.5.5 Waterford 1 and 2 5.5.6 Middle South Utilities 5.5.7 U.S. Coast Guard 5.5.8 Missouri Pacific Railroad 5.5.9 American Nuclear Insurers (ANI) 5.5.10 Institute of Nuclear Power Operations (INPO) 5.5.11 Nuclear Regulatory Commission (NRC) 5.6 As additional information becomes available, update the Emergency Communicator by completing Attachment 7.7, Follow-Up Notification, of EP-2-010, and direct the Emergency Communicator to conduct additional updates to offsite agencies per EP-2-010 on a continual basis.

6

m. . _ .
m. m. _ . .

_...,.,_m

.. _ , ,..y .,_m- . ,_ .m ._my .-, . , -

. .Em$rge'n'cyPlanImplcmantingInstruction ,

EP-1-030

,, Site Emergency Reyision 1 5.7 Initiate offsite dose assessment in accordance with EP-2-050 for manual assessment or EP-2-051 for computerized assessment.

Determine the need for protective action recommendations per EP-2-052, Protective Action Guidelines. .

5.8 Ensure that personnel are expeditiously evacuated from the protected area in accordance with EP-2-070 should the situation warrant.

5.9 If radioactive releases are occurring or anticipated, inetruct Health Physics Coordinator to actuate' Radiological Field Mo_nitoring Teams in accordance with EP-2-060.

5.10 Activate the Technical Support Center according to EP-2-100, if not previously activated.

5.11 Activate the Operational Support Center according to EP-2-101, if not previously activated. __ ~

5.12 Activate the Emergency Operations Facility according to EP-2-102.

5.13 Ensure the emergency logs / records are kept in accordance with EP-2-150.

5.14 Direct the Health Physics Coordinator and/or the Radiological Controls Coordinator to initiate in-plant radiological controls in accordance with EP-2-031 if a real or potential radiological hazard exists.

i l 5.15 Initiate any additional response measures in accordance with the applicable emergency procedures listed on Attachment 7.1.

l l

I i

l 7

.. ._. . . , . . ~ _.__......,._m._

. , __, m_ , mm_m . ,,mmmm _

- - 'Emstg'in'cy Plen Implementing Instruction ,

EP-1-030

., Site Emergency Revision 1 NOTE A Site Evacuation can be ordered at the Emergency Coordinator's discretion. If it is ordered, the Emergency Coordinator should ensure the foll'owing announcement is made over the public address system:

Attention all personnel; attention all

~

personnel. A Site Evacuation is required.

All nonemergency personnel proceed immediately

to the (state one of the locations: St.

John the Baptist Catholic Church or Monsanto Park area). Upon arrival, all supervisors shall assemble and log their personnel.

There will be no smoking,~~ eating or drinking until further notice.

Repeat the message.

5.16 If not previously accomplished, ensure Technical Advisors are dispatched to the local Parish Emergency Operations Centers.

5.17 As conditions change, periodically check EP-1-001 to determine whether reclassification is necessary.

l 5.17.1 If reclassification is necessary, then reclassify emergency ac-cording to EP-1-001 and implement appropriate Implemen Eng InstructionEP-1-010,EP-1-020,orEP-1-040.

5.17.2 If closeout is appropera~ti," then close out emergency with a verbal summary to all agencies / personnel as indicated on At-techment 7.13 of EP-2-010. l 8

. a=_: =_=___==:--- - - - - - - - - = - - - - , , - . -

. .Emangshey Plan Impismanting Instruction EP-1-030

, Sitp Emergency Revision 1 s

6.0 FINAL CONDITIONS 6.1 Oncoming Emergency Coordinator contacted.

6.2 EOF Director contacted.

6.3 Initial offsite notifications initiated.

6.4 The Site Emergency has been closed out with normal station administration resumed.or the emergency reclassified.

7.0 ATTACHMENTS -

7.1 Procedure References for Additional Response Guidelines me, b

e I

l l 9 ,

.-n,,.. n. ..

. . = .. _. ..

-.n- . - - - . - , , , . .-

. ,(_..' PROCEDURE REFERENCES FOR ADDITIONAL RESPONSE GUIDELINES

~

', o Tonic Reference Personnel EP-2-020, Contaminated Injured /Ill Personnel EP-2-030, Emergency Radiation Exposure Guidelines and Controls EP-2-032, Monitoring and Decontamination EP-2-033, Administration of Iodine Blocking Agents EP-2-052, Protective Action Guidelines EP-2-071, Site Evacuation EP-2-081, Search and Rescue Tonic Gas, Train EP-2-110, Man-Caused Emergencies -

Derailment, Airplane Crash, Explosion, Transportation Accidents Tornado, Hurricane, EP-2-120, Natural Emergencies Flood .

Administration EP-2-130, Emergency Team Assignm.ents

EP-2-170, Recovery

' EP-3-001, Emergency Plan Abstract EP-3-050, Emergency Response Call List EP-3-060, Emergency Communications Guidelines EP-3-100, First Aid and Medical Care t

I i

EP-1-030 Revision 1 10 Attachment 7.1 (1 of 1)