Public Version of Rev 1 to Emergency Plan Implementing Procedure EP-IP-002, Emergency Mgt Notifications & Rev 0 to EP-IP-102, Surveillance Testing of Emergency Communications Equipment. Revised Index Encl
ML20070V654
Person / Time
Site: Susquehanna  Talen Energy icon.png
Issue date: 01/20/1983
From:
PENNSYLVANIA POWER & LIGHT CO.
To:
Shared Package
ML17139B352 List:
References
PROC-830120-01, NUDOCS 8302170497
Download: ML20070V654 (94)


Text

.

I .

Revision 8 g]f) Ll3u V' Effective Date 1-20-83 0 .

eese 1 or 2 TABLE OF. CONTENTS EMERGENCY PLAN IMPLEMENTATION PROCEDURE MANUAL EFFECTIVE FORM NUMBER TITLE REVISION DATE-EP-IP-001 Emergency Classification , 0 6/28/82 .

EP-IP-002 Emergency Management Notification 1 1/20/83 EP-IP-003 Emergency Management Responsibilities 0 6/16/82 EP-IP-006 Search / Rescue /First Aid 0 6/16/82 EP-IP-007 Personnel Assembly and Accountability 0 6/16/C EP-IP-008 Natural Occurrences 0 6/16/82 ,

EP-IP-009 Emergency Off-Site Cose Calculations 0 6-23-82 EP-IP-010 In-Plant Emergency Monitoring 0 6/16/82 0, x EP-IP-011 Security Contingency 0 6/16/52 EP-IP-012 On-site Energency Monitoring 1 1/4/83 EP-IP-013 Off-site Emergency Monitoring Teams 1 1/4/83 EP-IP-014 Personnel and Vehicle Containment 0 6/16/82 Surveys .

EP-IP-015 Emergency Access 0 6/16/82 EP-IP-016 Damage Control 0 6/16/82 EP-IP-017 Toxic Material 0 6/16/82 EP-IP-018 Emergency Cal 1-in and Communications 0 6/28/82 EP-IP-019 Management of Off-site Emergency 0 6/16/82 Monitoring -

EP-IP-021 S**.e Emergency Evacuation 1 7/14/82 ,

EP-IP-027 Activation of Restoration Organization 0 6/16/82 EP-IP-028 Downgrade and Termination 0 6/16/32 Om 8302170497 930215 PDR ADOCK 05000387 F PDR

? ,

() ~

Revision 8 Effective Date 1-20-83 Page 2 of 2 -

EFFECTIVE FORM NUMBER TITLE REVISION DATE EP-IP-029 Activation of TSC 0 6/16/82 EP-IP-030 Activation of Emergency Operations 9 6/16/82 Facility and Transfer of Control From the Technical. Support Center EP-IP-031 Public Information Emergency 0 6/16/82 Procedures EP-IP-032 General Office Activation 0 6/16/S2 EP-IP-033 Dose Assessment and Protective Actions 0 6/23/32 6/16/82

~

EP-IP-034 Reactor Building Sample Station- 0 Emergency Sampling EP-IP-035 Emergency Vent Monitor Sampling 0 6/16/82 0; EP-IP-035 Rec:r.struction and Ac:ident Close cut 0 6/16/82 EP-IP-041 Fire Emergencies 0 6/16/'c?

EP-IP-042 Chemistry Lab Emergency Preparation 0 6/16/32 EP-IP-043 Pass Small Volume Liquid Sample 0 6/16/82 EP-IP-044 Emergency Environmental Sampling 0 6/16/82 EP-IP-045 Pass 10-ML Gas Sampling 0 6/16/82 EP-IP-046 Pass Iodine /Particualte Sample 0 6/16/82 EP-IP-047 Pass Large Liquid / Dissolved 0 6/16/82 Gas Sample .-

EP-IP-048 Estimation of Core Damage Ouring an 0 9/17/82 Emergency .

EP-IP-101 Inventory, Inspection, Operational Testing 0 7/16/82 --

and Calibration of Emergency Equipment and Supplies EP-IP-102 Surveillance Testing of Emergency 0 1/20/E3 Communications Equipment

(~)

CON 30J.ED. .

Revision 4 Effective Date 1/20/83 Page 1 of 3 -

FORMS INDEX EMERGENCY PLAN IMPLEMENTATION PROCEDURE MANUAL Effect.

Procedure No. Title Rev. Date EP-IP-002-1 Incident Form 1 1/20/83 EP-IP-002-2 Radiological Assessment Form 1 1/20/83 EP-IP-009-1 Data Sheet 2 0 6/23/82 Worksheet for Dose Calculation Recording EP-IP-009-2 Overlay Calculation Worksheet 0 6/23/82 EP-IP-012-1 On-site Monitoring Team Data Sheet 1 1/4/83 . - .

EP-IP-013-1 Off-site Monitoring Team Data Sheets 1 1/4/83 EP-IP-013-2 Emergency Kit Inventory Kit 0 6/16/82

.O EP-IP-019-1 Off-site Emergency Teams 0 6/16/82 EP-IP-019-2 Off-site Teams - Dose Readings 0 6/16/82 EP-IP-034-1 Reactor Building Sample Station 0 6/16/82 Emergency Sampling Data Sheet EP-IP-035-1 Vent Monitor Samples Data Sheet 0 6/16/82 EP-IP-035-2 Vent Monitor Samples Data Sheet l4 0 6/16/82 EP-IP-043-1 Pass Small Volume Liquid Sample 0 6/16/82 Data Sheet EP-IP-044-1 Data Sheet 0 6/16/82 EP-IP-045-1 Pass 10ML Gas Sample 0 6/16/82 Data Sheet EP-IP-046-1 Pass Iodine / Particulate 0 6/16/82 Sample Data Sheet EP-IP-047-1 Dissolved Gas Sample Data Sheet 0 6/16/82 EP-IP-101-1 Emergency Operations Facility Equipment 0 7/16/82 (excluding HP equipment)

EP-IP-101-2 Radiation Emergency Environmental 0 7/16/82 Sample Kit

O -

Revision 4 Effective Date 1/20/83 Page 2 of 3 Effect.

Procedura No. Title Rev. Date EP-IP-101-3 General Office Nuclear Emergency 0 7/16/82 Support Center Emergency Equipment and Supplies EP-IP-101-4 General Office Engineering Suppcrt 0 7/16/82 Center Emergency Equipment and Supplies

. EP-IP-101-5 Berwick Hospital Radiation Emergency 0 7/16/82 Equipment and Supplies-EP-IP-101-6 Gaisinger Medical Center Radiation 0 7/16/82 Emergency Equipment and Supplies EP-IP-101-7 Health Physics Van Radiation 0 7/16/82 Emergency Monitoring Equipment EP-IP-101-8 Radiation Emergency Off-Site 0 7/16/82 Monitoring Equipment Kit EP-IP-101-9 Ambulance Emergency Equipment Kit 0 7/16/32 EP-IP-101-10 Control Room Equipment 0 7/16/S2 EP-IP-101-11 Station Decontamination Area Equipment 0 7/16/82 l

EP-IP-101-12 Emergency operation Facility 0 7/16/82 i

! Decontamination Area and Health

( Physics Supplies EP-IP-101-13 Technical Support Center Equipment 0 7/16/82 EP-IP-101-14 Emergency On-Site Search and 0 7/16/82 Rescue Fi.rst Aid Equipment EP-IP-101-15 Damage Control Equipment Storage Box 0 7/16/82 EP-IP-102-1 Emergency Operations Facility Hotlines 0 1*/20/83 to State and Local Agencies EP-IP-102-2 Emergency Operations Facility Hotlines 0 1/20/83 to Regulatory Commission

/~~ EP-IP-102-3 Emergency Operations Facitlity Hotlines 0 1/20/83

\ to PP&L Emergency Fadilities EP-IP-102-4 Control Room and Technical Support 0 1/20/83 Center Hotlines to State and Local &

-~

O . Revision 4 Effectiva Date 1/20/83 Pag. 3 or 3 .

Effect.

Procedure No. Title Rev. Date ,.

Agencies EP-IP-102-5 Control Room and Technical Support 0 1/20/83 Center Hotlines' to the Nuclear i Regulatory Commission EP-IP-102-6 Operations Support Center, Control 0 1/20/83 i Room and Technical Support Center i Hotlines to PP&L Emergency Facilities

! EP-IP-102-7 Emergency Radios 0 1/20/83

-l EP-IP-102-8 Offsite Agency Emergency Contact List 0 1/20/83 1 -

\.

i i

  • t j

i e e i

j s

O -

4 i

O

! PROCECURE COVER SHEET .

i

! PENNSYLVANIA F0WER & LIGHT CO.

l SUSQUEHANNA STEAM ELECTRIC STATICN l

P-IP-002 L i .

cMERGENCY MANAGEMENT NOTI.:ICATIGNS Revision 1 ' .

.Page 1 of 57 l

Effe::tive Date /-48-/8 Expiration Cate /-#d-f5

! Ravised Expfrition Ca e

! j i

!O l

i CONTROLLED f

_n .

' N 4

Prepared by 41 - - _ .-A =

Date lO <

Reviewed by [ .I I/d[ ,

Date / //r/n PORC Review Require Yes ( No ( ) '

i Approved by -

~

ekt o Date IC.:< 2 !s Sb.

Sectiege,.ad - ,

PORC Meeting Number h3'OO[0 -

Date // 7/86 Superintendent of Plant "

[LLib Date / - / F ,U o

FORM A0-QA-101-1, Rev. 1 Page 1 of 1 i N

\

i O -

EP-IP-002 Revision 1 .

Page 2 of 57 i

TABLE OF CONTENTS SECTICNS PAGE 1.0 PURPOSE 1 2.0 SCOPE 4

3.0 REFERENCES

1 a.0 RESPONSIBILITIES 5 5.0 CEFINITICNS 6

_ 6.0 INSTRUCTIONS 6

\~s/. .

ATTACHMENTS ATTACHMENT PAGE A ACTICN STEP - EMERGENCY DIRECTOR 3 B ACTION STEP - COMMUNICATIONS COORDINATOR 16 CR/TSC C ACTION STEP - POWER DISPATCHER 31 0 ACTION STEP - LEHIGH SERVICE CENTER SERVICE 32 DISPATCHER E ACTION STEP - SECURITY COORDINATOR 33 F ACTION STE? - RADIATION PROTECTION CCORDINATOR 35 G ACTION STEP - TECHNICAL SUPPORT CCCRDINATOR ' 36 H ACTION STEP - CENTRAL DIVISION SERVICE 37 cd DISPATCHER

. I ACTION STEP - RECOVERY MANAGER 38 J SITE SUPPORT MANAGER 41 K ACTION STEP - COMMUNICATIONS COORDINATOR EOF 48 l

l

, . . _ _ . - _-. __.__m _ _ . _ _ _ - .. _ = _ _ . . . _ _ _ _ _ . _ _ _ _ _ . _ _ _ _ . _

i' 4

1 l -

I i

i i

l l EP-IP-002 l' Revision 1 '. )

i Page 3 of 57 1 1

l l

l ATTACHMENT PAGE 1 .

1 L ACTION STEP - RADIATICN SUPPORT MANAGER 50 l i '

i M ACTION STE? - TECHNICIAL SUPCCRT MANAGER 51 ,

i N ACTION STEP - GENERAL OFFICE SUPPORT MANAGER 52 l

i- 0 ACTION STEP - ENGINEERING SUPPORT LEADER 53 '

)

P INCI:ENT FCRM(FCRM EP-IP-C02-1) 54  ;

l RADICLCGICAL A53E55 MENT FORM (FORM EP-IP-002-2) 55 1 O

i i

f s

lO l'

I i  :

f f I

i f l

1

(

4 1

1 l

t

  • eau l'

i l

t --

1 i

-O

4 wJ EP-IP-002 Revision 1 .'

Page 4 of 57 EMERGENCY MANAGEMENT NOTIFICATICNS 1.0 PURPOSE 1.1 The ,7urpose of this procedure is to:

1.1.1 Inform SSES anc PP&L Management of the E.?argency.

1.1.2 Inform offsite emergency respense organi:sti:ns.

1.1.3 In:tiate as:repriate eme gency a:-i:ns :: s'.;;or emergen:y assessment /manageneat/miti;a-ita.

2.3 SCOPE Provide instruction which sill : lace One plant and Outside Organt:st'qns in

/~~') -

a state of readiness.

C/

3.0 REFE;E'.CES 3.1 NURE3-C654, Planning 3:andards anc Eva'aa:f n Criteria 3.2 NUREG-0696, Functional Criteria for Emergency Response Facilities 3.3 NUREG - 0731 Guidelines for Utility Management Structure and Technical Resources, Sept. 1980. 5.

.I l

3.4 SSES Emergency Plan 3.5 EP-IP-033 - Dose Assessment and Protective Actions 3.6 EP-IP-001, Emergency Classification 3.7 EP-IP-007, Personnel Assenbly and Accountability 3.3 EP-IP-018, Emergency CALL-IN and Communications ,'

3.9 EP-IP-021, Site Emergency Evacuation --

3.10 EP-IP-030, Activation of the EOF

,-w, 3.11 EP-IP-032, General Office Activation U

n

A V

EP-IP-002 Revision 1 '.

Page 5 of 57 4.0 RESPCNSIBILITIES 4.1 It is the responsibility of the SHIFT SUPERVISOR te assume the role of

~~

EMERGENCY DIRECTOR, implement this crocedure, activate accropriate emergency teams if any of the Energency Action Levels exist and make public protection action recermendations if required.

4.2 It is the resconsibility of the CCMMUNICATICNS C00RDINATOR-CR-TSC, to notify onsite anc offsite personnel, agencies ana organi:ations as specitied in this procedure.

4.3 It is tne res:0nsibil'ty of tne PChER DISPATCHER to notify eff-si te personnel as specifisc in this crececure.

4.4 It is the rescensibility of the LEHIGH SERVICE CENTER SERVICES DISPATCHER to notify off-si t e eersonnel as specified in this precedure.

4.5 It is tre res:cr.sibili.y of SEC4JRITY CCCiDINATCT. to cordinate pd persennel 1:c urtseility and provide ac:ess and tra#fic control necessary to succor: emergen:y c nditions.

4.c It is tne responsibitity of the RADIATICN MOTECTICN CCCRDINATOR to c:mmunicate with CER/BRP raciological cersonnel regarcing aff site assessment and protective action recommendations until relieved of this responsibility by the EOF.

l 4.7 It is the responsibility of the TECHNICAL SUPPORT COORDINATOR to l communicate with CER/BRP technical personnel regarding plant specifics until relieved of this responsibility by the EOF.

l 4.8 It is the responsibility of the CENTRAL DIVISION SERVICE DISPATCHER to call in OFF-SITE EMERGENCY MONITORING TEAMS.

l 4.9 It is the responsibility of the RECOVERY MANAGER to staff the EOF l

during a SITE or GENERAL EMERGENCY and take over responsibility for overall emergency management from the TSC.

4.10 It is the responsibility of the SITE SUPPORT MANAGER to manage communications and data flow internal to the EOF, between the EOF and all other emergency facilities and between the EOF and off-site c

. agencies.

4.11:I* is the responsibility of the COMMUNICATIONS COORDINATOR-EOF to notify off-site agencies and organizations as specified in this l

p/

N procedure.

4.12 It is the responsibility of the RADIATION SUPPORT MANAGER to communicate with DER /BRP radiological personnel regarding off-site assessment and protective action recommendations.

-l

\

l

/~T ,

%_) 1 EP-IP-002

  • Revision 1 '.

Page 6 of 57 4.13 It is the responsibility of the TECHNICAL SUPPORT MANAGER to communicate with DER /BRP technical personnel regarding plant specific

^

problems.

4.14 It is the resocnsibility'of the GENERAL OFFICE SUPPCRT MANAGER to

-activate the Generai Office Nuclear Emergency Supeor: Center (N-495) and to notify Corporate Management and Allegheny Electric of EMERGENCY status.

1.15 It is the responsibility of the ENGINEERING SUP00RT LE.30ER to activate

ne Engineering Suppor: Center (N-55Cb).

5.C CEFINITIO.:S 5.1 EOF - Emergency Operations Facility 5.2 TSC - Technical Suppert Car.ter

(]} -

- 5.3 CSC - Goerations Succort Center 5.4 LSC - Lehign Service Center 5.5 CR - Con:roi Roon 5.6 SCC - Security Control Center 5.7 NRC - Nuclear Regulator Commission 5.8 PEMS - Pennsylvania Emergency Management Agency 5.9 LCCO - Luzerne County Civil Defense 5.10 CEMA - Columbia County Emergency Management Agency 5.11 DER /BRP - Department of Environmental Resources / Bureau of Radiological protection 6.0 INSTRUCTIONS 6.1 Upon Classification into an EMERGENCY per EP-IP-001, the EMERGENCY DIRECTOR will follow the instructions in Attachment A, Action Step, EMERGENCY DIRECTOR.

f-~3

%)

6.2 Upon classification into an EMERGENCY and at the direction of the EMERGENCY DIRECTOR, the COMMUNICATIONS COORDINATOR-CR-TSC will follow the instructions in Attachment 8, Action Step, COMMUNICATIONS CCORDINATOR-CR-TSC.

O EP-IP-002 Revision 1 ".

Page 7 of 57 6.3 Upon notification by the COMMUNICATIONS CCORDINATOR-CR-TSC, the POWER ,

DISPATCHER will follow the instructions in Attachment C, Action Step, .. l POWER DISPATCHER.

6.4 Upon notification by the POWER DISPATCHC', the LSC SERVICES DISPATCHER will follow the instructions in Attachment D, Action Step, LSC SERVICES DISPATCHER.

6.5 At the direction of the EMERGENCY DIRECTCR, the SECURITY CCCRDINATOR will fcilow the instructions in Attachment E, Action Steo, SECURITY CCCRDINATOR.

6.6 After ceing notified of an EMERGENCY, tne RADIATION PROTECTION CCORDINATCR will follow the instructions in Attachment F, Action Step, RADIATION PROTECTION CCORDINATOR.

6.7 Af ter being notified of an EMERGENCY, the TECHNICAL SUPPORT CCCRDINATCR

'O 411 roi,=* =re instrec foes i= ^ :e:hme,: c. 4:=4o, steo. TscsNtca' SUPPORT CCORDINATOR.

6.3 wnen cirectcc, tne CENTRAL DIVISION SERV:CE DIS;ATCHER will follow Instructions in Attachment H, Action Step, CENTRAL DIVISION SERVICE DISPATCHER.

6.9 After being notified of an EMERGENCY, the RECOVERY MANAGER will follow the instructions in ATTACHMENT I, Action Step, REC 3VERY MANAGER.

6.10 Following notificatien of an EMERGENCY requiring i -tivation, the SITE SUPPORT MANAGER will follow the instruction in Attachment J, Action Step, SITE SUPPORT MANAGER.

6.11 At the direction of the SITE SUPPORT MANAGER, the COMMUNICATIONS COORDINATOR-EOF will follow Instructions in Attachment K, Acticn Step-COMMUNICATIONS CCORDINATOR-EOF.

A 6.12 Upon arrival at the EOF, the RADIATION SUPPORT MANAGER will follow the instructions in Attachment L, Action Step, RADIATICN SUPPORT MANGER.

6.13 Upon arrival at the EOF, the TECHNICAL SUPPORT MANAGER will follow the ~

instructions in Attachment M, Action Stap, TECHNICAL SUPPORT MANAGER.

6.14 Upon notification of an EMERGENCY the GENERAL OFFICE SUPPORT MANAGER will follow Instructions in At:schment N, Action Step, GENERAL OFFICE SUPPORT MANAGER.

.Q 6.15 Upon notification of a SITE or GENERAL EMERGENCY or EOF activation, the ENGINEERING SUPPORT LEADER will follow Instrue.tions on Attachment 0, Action Step, ENGINEERING SUPPORT LEADER.

. 1 Attachment A EP-IP-002 ."

Revision 1

'Page 8 of 57 ACTION STEP EMERGENCY DIRECTOR y

PRIMARY NOTIFICATION AND ACTIVATION NOTE: THE EMERGENCY DIRECTOR / SHIFT SUPERVISCR MAY CMIT SPECIFIC STEPS THAT ARE NOT NECESSARY. STEPS NEED NOT~EE .:ERFORMED IN CROER.

A.1.0 The EMERGENCY CIRECT:R will:

A.1.1 Cocumen Emergency classification, time and date 11:the Control R:om Log that .the Emergency was ceclared.

A.1.2 SHIFT SUPERVISOR anncences :: CCNTRCL RCCM PERSCNNEL "I have assumed responsibility as the EMERGENCY OIRECTOR."

d(^s A.1.3 10:oint and ins ruct a COMMUNCIATICNS CCC93 NATOR-CR-TSC to notify plant personnel of the EMERGENCY. Announcamen:

, s:ecified in E.1.1/E.1.2.

l NCTE: The SHIFT SUPERVISOR / EMERGENCY DIRECTOR nas 3 parallel steps.

l 1. Offsite Agency Notification

2. Cembat Emergency
3. Notify Internal Management A.1.4 0FF-SITE AGENCY NOTIFICATION NOTE: MUST BE INITIATED IMMEDIATELY FOLLOWING CLASSIFICATION OF EMERGENCY.

l A.1.4.1 Complete Incident Form EP-IP-002-1. ,

A.1.4.2 Instruct the COMMUNICATICNS CCORDINATOR-CR-TSC to report the information obtained in A.1.4.1 to the following c:

agencies.

b U(

Page 1 of 8

O a

Attachment A EP-IP-002 '.

Revision 1 Page 9 of 57

(, INITIAL NOTIFICATICN ONLY UNUSUAL SITE GENERAL EVENT ALERT EMERGENCY EMERGENCY PEMA P EMA PEMA  ?EMA LCCD LCCD LCCD PEMA A.1.2.3 Ncti fy tr.e SUPERINTENCENT C.: FLANT or his designee per E3-I?-C!S.

A.1.a.4 Instruct CCMMUNICATION CCCROINATOR-CR-TSC to transmi-infor ation octained in A.1.4.1 to NRC.

A.1.5 CCMEAT EMERGENCY f') A.1.E.1 If off-site effluen (gasecus or liquid) elease is ex:ected, noti fy H. 3 anc CHEMIST 3.Y TECHNICIANS to recor: :o Control R :m.

A.1.5.2 Ac;otn: and direct CSC CCORDINATOR to establish CSC.

A.1.5.3 In event of ALERT, SITE or GENERAL EMERGENCY or if the situation otherwise warrants, direct the COMMUNICATICNS COORDINATOR-CR-TSC to initiate TSC staffing.

A.1.5.4 In event of SITE or GENERAL EMER'GENCY or at the direction of the RECOVERY MANAGER, direct the COMMUNICATIONS CCORDINATOR-CR-TSC to initiate EOF staffing.

A.1.5.5 Determine that public protection Action Required in accordance with EP-IP-003, Dose Assessment and Protective Actions.

l

  • A.1.6 NOTIFY INTERNAL MANAGEMENT ,

A.1.6.1 The COMMUNICATIONS COORDINATOR-CR-TSC will notify the --

POWER DISPATCHER and instruct him te contact PEC0VERY MANAGER.

A.1.6.2 The COMMUNICATIONS CCORDINATOR-CR-TSC will notify the

! p(_). PUBLIC INFORMATION MANAGER.

i 1

Page 2 of 8 i

L _. -

l s

I l

l

! l l

Attachment A I E?-IP-002 '. l Revision 1 l Page 10 of 57 1

NOTE: THE EMERGENCY DIRECTOR MUST APPROVE ALL PRESS RELEASES UNTIL RELIEVED OF THIS RESPONSIBILITY BY EOF PERSONNEL.

A.1.7 Perform the folicwing based on Classification:

SITE &

UNUSUAL GENERAL RESPCNSIEILITY EVENT ALERT EMERGENCY SEIURIT/ ';/A Ac:centa:flity  :::entability C:CR2INATCR 53-IP-C07 EP-IP-007 SECURITY N/A N/A Eiacuats un-C ORC-INATOR necessary personnel-EP-I?-0E1 and-clock Town-

..O%- . .shio Road.

T-119. Block anc es:a::lisn ac:ess con-trol to all inc: ming roads at site Boundary.

a >l a ,

COMMUNICATIONS Call-In-Off- Call-In-Off- Call-In-Off-COORDINATOR Jite Teams & Site Teams & Site Teams &

EOF SET-UP EOF SET-UP EOF SUPPORT FOREMAN. (EP- FOREMAN. (EP- MANAGER and IP-018) IP-018) STAFF (EP-IP-018)

SECURITY Unlock EOF and Unlock ECF and ' Unlock EOF CCORDINATOR establish ac- establish ac- and estat,lish cess control ces control access con- c j trol ADMINISTRATIVE Deliver Vehic- Deliver Vehic- Deliver i e C00RDINATOR les to EOF

  • 1es to EOF" Vehicles to

\ EOF Page 3 of 8

O Attachment A

'E?-IP-002  :

Revision 1 Page 11 of 57

  • CALL IN OF OFF-SITE. EMERGENCY MONITORING TEAMS IS ONLY REOUIRED AT THE DIRECTICM OF THE RACIATION PROTECTION C00RDINATCR OR EMERGENCY DIRECTOR.

A.1.3 In the event of off-site effluent (gaseous or if cuid) release, complete Radiological Assessmen Form E?-IP-002-2 and ins ruct RADICLCGICAL PROTECTION CCORDINATOR

(; referable)/CCMMUNICATIONS COORDINATOR (alternate) to c catr.ica a infor.a:icn to CER/ER? anc NRC.

A.1.9 Ensure tea: recuired notifications nave ceen made.

TSC AND ECF PERSCNNEL OFF-SITE AGE?:CIES PUELIC IN;GRVATION MANAGER RECCsERY . MANAGER A.;.10 When concitions change significant'y, return to E?-I?-GJ1'anc cetermine .whether to reclassi fy 'to EMERGENCY.

A.1.11 During static conditions (no change in classification) perform periodic communications / updates 'per A.3.

1

'~

c

/*\

U r

Page 4 of 8

ts Attachment A .

EP-IP-002 .

Revision 1 Page,12 of 57 A.2.0 . UPGRADING EMERGENCY CLASSIFICATION Perform those steps for the aporopriate classificatten which are presently controlled by EMERGEllCY DIRECTCR.

TO TO TO SITE GENERAL ALERT EMERGENCY EMERGENCY-A.2.1 Announce Re- Anncunce Re- Anecunce Re-classifica:'on clas si f t :stice c?issi'fcat'On to Control Recm to C:ntrol Recm  :: Control Rcem and TSC persen- and TSC persen- and TSC persen-nel nei nel A.2.2 Cocument Re- Oc ment Re-C' - Cccument Re-classi ficati r., class!#ica icn, classification, Oate and Time Cate and. Time Date anc Time Cor:le:e Inci- C pie:e Inci- C plete Inci-A.2.3 NCTE: cen: corm E3- cent Form EP- cen: ::rm E?-

MUST 5E IN- IP-002-1 IP-002-1 IP-GC2-1 ITIATED IN- Notify:

MEDIATELY Nctify: Notify:

DER /ERP DER /BRP CER/BRP FOLLOWING RECLASSIFI-CATION SUPT. OF SUPT. OF PEMA PLANT OR PLANT OR DESIGNEE DESIGNEE LCCD NRC NRC CEMA SUPT. OF PLANT OR DESIGNEE NRC c A.2.4 Return to Step Return to Step Return to Step A.1.5 and redo A.1.5 and redo A.1.5 and redo all steos all steos all steos

( -

A Daige 5 of 8

.O Attachment A .

- EP-IP-002 -

Revision 1 .

Page 13 of 57 A.3.0 STATIC CONDITION - INFORMATION UPDATE A.3.1 INCICENT UPDATE MATRIX NOTIFIER CRGANIZATICN SITE &

TO EE UNUSUAL GENERAL NOTIFIED EVENT ALERT EMERGENCY GER/ERP TECH Tecn Scopert SAME Coorcina or UMTIL NRC EMERGENCY E.ergency Ofrec or RELIEVED DIRECTOR REC. MGR. Emerger.cy CY AS Director EOF

({])

^

3.0. SUPPCRT S:TUAT:CN Rs:overy MANAGER Manager DICTATE 5 PUBLIC INFORM- Emergency ATICN MANAGER Cirector ENGINEERING Tech. Support SUPPORT LEADER Coordinator EMERGENCY Not Not DIRECTOR Applicable Applicable For record purposes and incident reconstruction, all incident update information is to be recorded on an Incident Form, EP-IP-002-1, prior to transmission.

Incident update information must be aoproved by either EMERGENCY DIRECTOR,*

SITE SUPPORT MANAGER or RECOVERY MANAGER prior to transmission. ,

Incident uodate information should be transmitted approximately every 30 c:

minutes or after any significant event (excluding reclassification which is governed by separate procedure).

i O' "" 't't5"" d '" "r'* ' ' '"" S" c''c " ar*'*rr'd

! individual. Individual listed in lowest classification has the responsibility for notification until relieved.

Page 6 of 8

Y

\ ..

,s 4

i O

l Attachment A-' .

i EP-IP-002 .

! Revision 1 Page 14 of 57 L

" NOTIFIER" listed in matrix need not perform the updata himself but is l . .

i responsible for seeing that it is accomplished. -

i ,

l If EOF activated, the EMERGENCY DIRECTOR will keep the GENERAL GFFICE

SUPPCRT MAttAGER acoraised of EVERGENCY status until relieved of
nis

! function by EOF personnel.

i i

i

{

i

?

i-i 1

e i

f 1

d k

i

. O i

d a

l Page 7 of 8 1

Attachment A '

EP-IP-002 Revision 1 Page 15 of 57 A.3."2 RACIOLCGICAL ASSESSMENT UPDATE MATRIX (ONLY REQUIRED IN EVENT OF GASEGUS OR LICUID EFFLUENT RELEASE)

NOTIFIER CRGANIZATICN SITE &

TO EE LNUSUAL GENERAL NOTI:IED EVENT ALERT EMERGENCY OER/ERP RAD Emargency Radiation SAME Di-ector P otection C:ortica::t dNTIL

'a C Ere gency E.a gency RELIE',ED Direct:r Cirector EY REC. M.GR. Emergency Emergency Direc or Od-actor ECF x_- G.O. SUP.CRT Rec:very Re::/ery MANAGER Manager Marager EMERGENCY Health Radiation CIRECTCR Physics ?rc ection Tecnnician Coordinator For recorc purposes and incident reconstructions, all status upcate information is to be recorced on the Radiological Assessment Form, EP-IP-002-2, prior to transmission.

Radiological Assessment status update information must be approvd by either EMERGENCY DIRECTOR, RADIATION PROTECTION C00RDINATOR OR RADIATION SUPPORT MANAGER prior to transmission.

Radiological Assessment status update information should be transmittad acoroximately every 30 minutes or after any significant change in effluent release status.

" NOTIFIER" listed in Matrix for any given classification is preferred individual. Individual listed in lowest classification has the responsibility for notification tatil relieved

" NOTIFIER" listed in Matrix need not perform the update himself but is responsible for seeing that it is accomplished.

(~

(_) If EOF activated, the EMERGENCY DIRECTOR will keep the GENERAL OFFICE SUPPORT MANAGER appraised of EMERGENCY status until relieved of this function by EOF personnel .

Page 8 cf 8 1

P O

Attachment S EP-IP-002 ".

Revision 1 Page 16 of 57

, ACTION STEP COMMUNICATICNS COORDINATOR - CA - TSC Ch eck.

INITIAL - NOTIFICATICN 5.1.0 The CCM.Y.UNICATICNS CCCR3!NATOR will:

B.1.1 For an UNUS' J AL EVENT: Announce over the FA System:

"A ten-i:9 all ersonnel, an '!NUS'JAL EVENT has :een ceclared. Ocera-icns. Health Physics and Chemistry en-snif: cersonnel reper; t: :ne OPERATICNS SUP?CRT CENTER".

Re: eat above anncuncamen: twice.

k_s) . E.1.2 :or an ALERT, SITE or GENERAL E."ERGENC:

u. :s s .u:n :.-. s.... utr.:;,vs

,.._ _.. ._.........._x._.

a. . . _vi::  :.u:aut s:ux.s..;u .-v.:a

.  :.s...

UN.-ASITAEILITY OF ANY ASSEMELY AREA CR ASSEMELY RCUTE.

E.1.2.1 Activate the site siren for personnel *-

accountability (EP-IP-007), and, announce over the PA System:

li

" Attention'all personnel, a EMERGENCY has been declared. All on-call emergency personnel report to your emergency duty station. All other personnel, report to your assembly area."

Repeat above annocncement twice.

3.1.' At the direction of the EMERGENCY DIRECTOR notify

[ OFF-SITE AGENCIES as listed under initial notific% tion and transmit the information on Incident Form EP-IP-002-1. c:

NOTE: NOTIFICATICNS MUST BE INITIATED IMMEDIATELY FOLLCWING CLASSIFICATION OF EMERGENCY.

5 n 4

\_/ ,

Page 1 of 15

1 Attachment B EP-IP-002 .'

Revision 1 Page 17 of.57 INITIAL NOTIFICATI_ON UNUSUAL SITE GENERAL EVENT ALERT EMERGENCY EMERGENCY PEMA DEMA PEMA PEMA (ho: line") (ho- line') (hoc line') (ho: line")

~

LCCO LCCD LCCD ---LCCD (hot line) --- (hot line) (hot line) (hot line) l NRC --- 1RC .NRC --- CEMA L --- ( ho- l i n e ) (no- line) (he- line) (hot li e)

NRC (hoc line)

' Use hot itne from 3 a.m. o a p.m. only. At ::.'ar times use E.1.4 :n event af ALERT, 3 TE cr GENERAL E'iE;5ENCY cr at

he cirectf an of the EMERGESCY 0:RECTCR, call in TSC pers nnel.

NORMAL WCRK HOURS - TSC call-in i

B.1.4.1 Call switchboard operator (dial . and instruct operator to notify on-call TSC f

personnel.

OFF NORMAL HOURS - TSC call-in B.1.4.2 Notify Security Control Center (Ext.- _-

of TSC activation.

B.1.4.3 Initiate paging of on-call personnel.

B.1.5 In event of UNUSUAL EVENT or ALERT contact PCWER '

OISPATCHER using Hot Line or G.O. Ext. -

to advise him of the emergency classification '1, and instruct him to notify the RECOVERY MANAGER.

. 8.1.6 Notify the PUBLIC INFORMaT. ION MANAGER using Hot s Line or extension ,or- -and

~

transmit the information on the~ Incident Form EP-IP-002-1.

P4ge 2 of 15 ,

(m v

)

Attachment 3 EP-IP-002 .

Revision 1 Page 18 of 57 3.1.7 In event of SITE or GENERAL EMERGENCY or at the direction of the EMERGENCY DIRECTOR, call-in EOF persennel.

3.1.7.1 Refer : Section E.5.1 for ECF C.3LL *N curing normal working hours.

3.1.7.2 Refer :: Section B.6.2 frr EOF CALL-In during off normal nours.

3.1.0 31:e Vacua:'On

,vi:: un:.a a . . .- -:y:,

-ca. ( c.s w..n

..,sa iv .sLritat N-u t.

EVACUAT*.CN.

3.1.8.1 In the event of a SITE or GENERAL EMER5ENCY, y . c - v<- -

, .~..-. .. . -:.~..o..-i. ...v.:...om.. . a r, : . ,. z. , .a u,3 ,. ) .i

(-s' ') - SCC CCN~RCLLER (al arnate) to initia e eva::_a:i:n f a:: nca-essantial :ersonnel per

[ E?-I:-C21. 1: achment C, Acti:n 5:ec

i. C mm.nica-icns C:ordinat: .

=_ .1 . .: . c, .sL.e. . , ;/. . .. . e .:...n.ee y . 4. n t .. 4. ., .. e n.i. .- c. o.n

.s.e .6 . . 3 ..

blocking of Township Road T-419.

S.1.9 At the direction of the RACIATION PROTECTION CCORDINATOR or the EMERGENCY DIRECTOR, call-in OFF-SITE EMERGENCY MONITORING TEAMS as follows:

B.1.9.1 Refer to Section B.7.1, for 0FF-SITE TEAM call-in during normal work hours.

S.1.9.2 Refer to Section B.7.2, for OFF-SITE TEAM call-in during off normal hours.

r>

\ }

v l Page 3 of 15 i

1

~

O Attachment B .

EP-IP-002 .

Revision 1 Page 19 of 57 B.2.0 STATIC CONDITION - INFORMATION UPDATE S.2.1 INCICENT UPDATE MATRIC NOTIFIER CPGANIZATION SITE &

TO BE UNUSUAL GENERAL 1

NOTIFIED EVENT ALERT EMERGENCY OER/BRP TECH Tecn. Scopert SAME Coordinater UNTIL NRC E'dERGENCY Eme gency Direc or RELIEVED OIRECTOR REC. MGR. Emergency EY AS Director EOF n 3.0. SUPPCRT SITUATICN iaccve ry

, V M: NAGER Man ;er CICTATES OUELIC INFORM- Emergency ATICN MANAGER Direct:r ENGINEERING Tech. Su:oort SUPPORT LEADER Coordinator EMERGENCY Not Not DIRECTOR Applicable Applicable For record purposes and incident reconstruction, all incident update information is to be recorded on an Incident Form, EP-IP-002-1, prior to transmission.

Incident update information must be approved by the EMERGENCY _ DIRECTOR, prior to transmission.

Incident update information should be transmitted approximately every 30 minutes or after any significant event (excluaing reciassificatiqn which is governed by separate procedure).

" NOTIFIER" listed in Matrix for any given classification is preferred individual. Individual listed in lowest classification has the responsibility for notification until relieved.

i i

1 Page 4 of 15

i-

\.

i

. Attachment 3 EP-IP-002 '.

, Revision 1 l Page 20 of 57 i " NOTIFIER" listed in matrix need not perform the update himself but is

responsible for seeing that it is accomg'ished.

~

i i

If EOF activated, thp EMERGENCY 0: RECTOR will keep the GENERAL 0FFICE SUPPORT MA!!AGER aceraised of EMERGENCY status une.fi relieved of this function by EOF personnel.

4 N

i I

!'O i-l i

i

. l l l l-  %  !

'l ,

l l O. ~.

^l

~

Page 5 of 15 '

I

- . _ . . _ _ _ _ _ . . . . _ _ _ _ . _ . . . _ _ _ _ _ . _ . _ - _ . . - _ . - _ - , _ . . . _ . _ _ . . . . . _ _ _ . _ - . - _ _ . - _ _ ~ _ _ _

O Attachment.B' '

EP-IP-002 .

Revision 1 Page 21 of 57 B.2.2 RADIOLOGICAL ASSESSMENT UPDATE MATRIX (CNLY REQUIRE 0 IN EVENT OF GASEOUS OR LIQUID EFFLUENT RELEASE)

NOTIFIER ORGANIZATION SITE &

1 TO BE UNUSUAL GENERAL

NOTIFIED EVENT ALERT EMERGENCY OER/3RP 150 Emergency Ractation SAME Director Protection Coorcinator UNTIL NRC Emergency Emergency. RELIE'!EO

. Director Oi-actor EY REC. fiGR. Emergency Emergency Ofrector Director EOF 1

G.O. SUPPCRT iec:very Rec:ve ry 0- MANAGER Managar Mana;er EMERGENCY 6eal:n Racia-icn GIRECTCR hysics Protectico

'e c.9e i ci an Ccorcinator For record purposes and incicent reconstrue. f on, all status ucdate 4 information is to be recodred on the Radiological Assessment Form, EP-IP-002-2, prior to transmission.

Radiological Assessment status update information must be approved by either EMERGENCY DIRECTOR, RADIATION PROTECTION COORDINATOR prior to transmission.

Radiological Assessment status update .information should be transmitted approximately every 30 minutes or after any significant change in effluent release status.

i

" NOTIFIER" listed in Matrix for any given classification is preferred individual. Individual listed in lowest classification has the
  • responsibility for notification until received. ,

" NOTIFIER" listed in Matrix need not perform the update himself but is c responsible for seeing that it is accomplished.

If EOF activated, the EMERGENCY DIRECTOR will keep the GENERAL OFFICE - ,

~

SUPPORT MANAGER appraised of EMERGENCY status until relieved of this

_j function by EOF personnel.

1 T

Page 6 of 15

-w r^^m7 * * +wq,e ay-m.- , .-

4 %._ y , y _ .. w *ga, w --eW 7

O Attachment B EP-IP-002 '.

Revision 1 Page 22 of 57 ACTION STEP COMMUNICATIONS CCORDINATOR - CR - TSC Check UFGRADE TO ALERT 1 S.3.0 The CCMMUNICATICNS CCCRDINATOR will:

2.3.1 For an ALERT:

NOTE: CHECK WITH EVERGEiCY DIREITCR REGARCI';G CTENTIA-2..-AEITIEILITV CF ANY ASIEME_Y AREA CR ASSEMELY RCUTE.

E.3.1.1 Activate -he site siren for personnel p- ac:cuntacility (EP-I?-C07 (atta:rment E and i I), an , announce over tre ?.1 System:

O I i

\_/ TSC HAVE CCh ;0L RCCM PERFORM T-IS STE?.

1.

t0TE:

"A:tentica all personnel, an ALERT has been ceclared. All on-call ere ;en:y oersenrel repor to your emergency cuty s ation. All other personnel, recor; to your asseccly area."

Repeat above announcement.

{ 1.

B.3.2 At the direction cf the EMERGENCY DIRECTOR notify 8

[ OFF-SITE AGENCIES as listed below and transmit the information on the Incident Form EP-IP-002-1.

NOTE: NOTIFICATION MUST BE INITIATED IMMEDIATELY FOLLOWING CLASSIFICATION OF EMERGENCY.

NRC (Hot Line)

B.3.2.1 Verify that CER/BRP has been notified b?,-

radiological staff.

B.3.3 Call-in TSC personnel. '9 NCRMAL WORK HOURS B.3.3.1 Call switchboard operator (dial "0") and

(~')

instruct operator to notify on-call TSC personnel.

l Page 7 of 15 .

N o

Attachment 8 EP-IP-002 '.

Revision 1 Page 23 of 57 0FF NORMAL HOURS 3.3.3.2 Notify Security Centrol Canter (Ext. *-

o

'f TSC activati:n.

3.3.3.3 Initiate caging of an-call personnel.

3.3.4 Contact the ?CWER OISPATCHER using Hot Line or G 3. --

~.

ext. . . ...,

.o advisa and instruct him to notir.y

-he IECO'!ERY M.1 NAGER.

3.3.5 No-ify :ne ?L'ELIC :3.::iMAT:CN v2.s GERasfgha: Line .

or extansion . . _ de G. O. ex ansion 1173 and transmit tne information an ne Incfdant F rm EP-IP-002-1.

s 3.3.6 At the directian of .he EME'GENCY DIRECTOR, call-in 1 EC: persennel.

3.3.5.1 Refer to ;&c icn.5.6.1, ice ECF CAu'.-:.1 during ermal working nours.

S.3.6.2 Refer to Sec ion S.5.2, for EOF CAI L-IN during of f normal hours.

B.3.7 At the direct'on of the RADIATION PROTECTION COORDINATOR or EMERGENCY DIRECTOR, call-in OFF-SITE EMERGENCY MONITORING TEAMS as follows:

f.

B.3.7.1 Refer to section 8//.1, for OFF-SITE TEAM CALL-IN during normal work hours.

B.3.7.2 Refer to Section 8.7.2, for OFF-SITE TEAM CALL-IN during off normal hours.

'N t

Page 8 of 15 wn,,,...,,.,,,,

s-Attachment 8 EP-IP-002 .'

Revision 1 Page 24 of 57 ACTION STEP CCMMUNICATIONS CCORDINATOR - CR - TSC Check UPGRA;DE TO SITE EMERGENCY 3.1.0 The CCV.MUNICATICNS CCCRCINATCR will:

S.4.1 For a SITE EMERGENCY:

.L i : -.- .... .. ..- .. ,,I L*T-.,- --- , - . . , - . . -

Lat..s dan- : .ta c;c.L .. 3

. -- a t;-mu t . -.u ".. .-

, i t . ., - .. .r., L

. , .y .. . .~ s ,. y e...-

.  ::.y:u,.y..-. s ..a m:: ur, --.y RCUTE.

3.1.1.1 Ac-ivate :ne site stren for :ersennel at::untacility (E?-IP-CG7 '.::ac men s 3 anc F' I), ano, announce over -he ?A Sjstem:

r s. ,,,

.s T: :

i

'y ,

i f

. . . - .', . , , .56.. 3~.- 4

. c, : a-. ,3.,.

. . . . ..n.:

"A tent'en ali personnel, a SITE EMERGENCY nas been ceclared. All on-call ecercency

ersen el recor: o your emergency duty s a: ton. All other personnel, report to your assemoly area."

Repeat above announcement.

8.4.2 At the direction of the EMERGENCY OIRECTOR notify

[,' OFF-SITE AGENCIES as listed below and transmit the information on Incident Form EP-IP-002-1 to:

NOTE:

NOTIFICATION MUST BE INITIATED IMMEDIATELY

! FOLLOWING CLASSIFICATION OF EMERGENCY.

l l HRC (Hot Line) i B.A.2.1 Verify that CER/BRP has been notified by radiological staff.

B.4.3 Call-in TSC personnel.

NCRMAL WORK HOURS

(~T B.4.3.1 Call switchboard operator (dial "0") and

'u >

instruct operator to notify on-call TSC Page 9 of 15

s i

Attachment 8 EP-IP-C02 '.

-Revision 1 Page 25 of 57 -

personnel.

OFF NORMAL HOURS

^

3.4.3.2 No:ify Security Con:rol center (Ex:. .of TSC activation.

S.4.3.3 Initiate ; aging of on-call personnel.

3.4.4 Nctify the PUBLIC INFORp,1ATION MANAGER ustra Ho,t. Line er extansi:n f yr G.C. axtensi n. in:

-a n s.mi :he 1,fiFiation an :5e Inci:ent ;6?m E?-IP-002-1.

B.4.5 Call-in EOF personnel.

3.4.5.1 Refer :: Sectic, 3.5.1, for ECF CALL-IM caring norma! wo-k hours.

3.2.5.2 Refer :s iaction 3.5.2, ~ far ECF CALL-IN  ; ring of f normal nc.rs.

3.4.5 5!:a-Evacuatici NOTE: CHECK WITH' EMERGENCY DIRECTOR PRICR TO INITIATING -

EVACUATION.

B.4.6.1 In the event of SITE or GENERAL EMERGENCY, notify the SECURITY COORDINATOR (Preferable)/

SCC CONTROLLER (alternate) to initiate evacuation of all non-essential personnel per

- (( EP-IP-021, attachment C.

I B.4.6.2. Notify the SECURITY COORDINATOR to initiate blocking of Township Road T-419.

)

l Page 10 of 15

. ~ ,

s. .

I.

t q

At achment B '

.EF-IP-C02 .

Revision 1 Page 26 cf 57 ACTION STEP COMMUNICATION COORDINATOR - CR - TSC Check t

UPGRACE TC GENERAL EMERGENCY B.5.0 The CC."MUNICATIONS CCCRD:NATCR will:

3.5.1 For a GENERAL EMERGENCY:

b,V, ' - s F b .**, . - . . . .,#. a. ' .7

.TC O. t .,._,. ...l 6,.- --,1 . Ok ' .- 4 % L- J.M,-...b. -, , - , . , . . . ,

3.* T '-.:6 0..l.9-

...u== -q e...

L. .

4.;...-

. . ... -....i.

. y . .%,. g 4., . . .42:1 :_/ .

s.,. . . , .- : : .: f.

- n-

.~ s :- .

3.5.1.1 Activa a -he site si-en f:r :ersonnel a::auntacili y (EF-:?-C07, a :a:n eats 3'and I). anc. ann ence :ver tha OA Sys:a.r.:

.).

I5C hAVE CChiiCL RCCM PERFOR:4 inIS STE?.

(NCTE:

"At antion all cersonnal a GENERAL EMERGENCY has :een declared. All cr-cali emergency perscnnel report to your arargency cuty s ta t f o r. . All other personnel, reper:= to your as;ambly area."

Repeat above announcement.

,,8.5.2 At the direction of the EMERGENCY OIRECTOR, notify OcF-SITE AGENCIES as listed below and transmit the information or. Incident Form EP-IP-002-1 to:

NOTE: NOTIFICATION MUST BE INITIATED IMMEDIATELY FOLLOWING CLASSIFICATION OF EMERGENCY.

PEMA (hot line") .

LCCD (hot line)

CEMA (hot line)

NRC (hot line)

' ' N ._ "

  • 8 a.m. to 4 p.m. only - all other times cali ,, ,,-

( ~}

8.5.2.1 Verify that CER/BRP has been notified by Page 11 of 15

Attachment B ~

EP-I?-002 .

Revision 1 Page 27 of 57 radiological staff.

B.5.3 Call-in TSC personnel.

NCRMAL WCRK HCURS 3.5.3.1 Call swit:nboard operator (dial "G") acd instruct cperator to notify on-call T5C personnel.

OF: NCRMAL " CURS

_ 5.5.3.2 Natify security Con:roi Cantar (Ex:. ~o f TSC activation. ~

B.S.3.3 Initta e paging of on-call personnel.

B.5.4 Notify the PUBL*C INFOR.YATION . MANAGER using Hot Line

~

or extension- ' ar'G.O. ax ensfen

~

and transmit ne information n :ne Incicen: Form E?-IP-CO2 .'.

B.5.5 Call-in EOF personnel.

B.5.5.1 Refer to .Sec f on B.6.1, for EOF CALL-IN during normal work hours.

B.S.5.2 Refer to Section B.6.2, for EOF CALL-IN during off normal hours.

B.S.6 Site Evacuation NOTE: CHECX WITH EMERGENCY DIRECTOR PRIOR TO INITIATING EVACUATION.

4 B.5.6.1 In the event of SITE or GENERAL EMERGENCY, notify the SECURITY CCCRDINATOR (Preferable),

SCC CONTROLLER (alternate) to initiate

  • evacuation of all nonessential personnel,per EP-IP-021. .i B.S.6.2 Notify the SECURITY CCORDINATOR to initiate blocking of Township Road T-419.

)

Page 12 of 15

O Attachment S '

EP-IP-002 .

Revision 1 .

Page 23 of 57 B.6 1 EOF CALL _IN B.6.1 NORMAL WORK HOURS - EOF call-in 3.6.1.1 Call switchboard operator (dtal "0") and instruct coerator :o notify on-call EOF SUPPCRT MANAGER anc STAFF.

B.6.1.2 Contact PCWER DISPATCHER using Hot Line or G.O. ext :o advise him of emergency classifica:1orr arc instre:: him to notify the RE!2VEi'r VANAGER anc :a in t:t ate E:? ar.d General Cf' ice persennel call-ic :nru LEFIGH '

SERVICE CENTER SERVICE DISPATCHER.

~~ 3.6.1.3 Instrue: CENTRAL DIVISION SERVICE DISPATCHER (72-137-233) to call in 5 CF:-SITE EMERGENCY MONITCRING TEAMS. Give CISPATCHER call ba:t s, tels: hone num:er to acknowiec;e :Jmale: ion J of cai;-in.

3.6.I.4 Instruct ACMINISTRATIVE CCCROINATOR to deliver EMERGENCY vehicles to the EOF.

S.6.1.5 Instruct the' SECURITY CCORDINATOR to provide access control to EOF.

B.6.2 0FF NORMAL HOURS - EOF call-in.

8  ;-

}

B.6.2.1 Notify SECURITY CONTROL CENTER (Ext. , of EOF activation.

8.6.2.2 Initiate paging of EOF SUPPORT MANAGER and l

STAFF.

8.6.2.3 Contact PCWER DISPATCHER using Hot Line or G.O. ext. :o advise him of j emergency classitication and instruct hfm to notify the RECOVERY MANAGER and to initiate EOF and General Office personnel call-in thru ' * ~

LEHIGH SERVICE CENTER SERVICE DISPATCHER.

8.6.2.4 Instruct CENTRAL DIVISION SERVICE DISPATCHER (72-187-383) to call-in '5 0FF-SITE EMERGENCY MONITORING TEAMS. Give DISPATCHER call back

()

telephone number to acknowledge completion of call-in.

l Page 13 of 15 l

l l

L

t j .-

fh i Attachment B EP-IP-002 .'

I . Revision 1

Page 29'of.57'-

1 1

4. -

B.6.2.5 Instruct ADMINISTRATIVE CCORDINATOR to deliver emergency. vehicles to the EOF.

i-

!- S.6.2.5 Instruct SECURITY CCCRDINATGR to unlock the.

EOF and provide access control.

i i

s .-

VO 1

g, 1~

i i

t.

5.

t i

i

!O t, -

4 i

l Page 14 of 15 i

+ P

  • ~ , , w,.ww,--ne,m-,,-,,-~- ...-,-,,vm-,_.n,. me__-_ - -

1 Attachment 8 EP-IP-002. ~. .

Revision 1 Page3.0 of 57 H

8.7.0

{GFF-SITEEMERGENCYMONITORINGTEAMCALL-IN 8.7.1 NORMAL WORK HOURS - 0FF-SITE TEAM CALL-IN 8.7.1.1 Call switch'coard operator -(dial "0") and instruct cperator to notify on-call EOF SET-UP .:CREMAN.

B.7.1.2 Instruct CENTRAL DIVISION SERVICE DISPATCHER (72-187-333) to call in 5 0FF-SITE EMERGENCY MCNITCRING TEAMS. Give DISPATCHER call back talephene numcer to acknowledge c:mpletion of call-in.

8.7.1.3 Instruct ADMINISTRATIVE CCCRCINATOR to deliver EMERGENCY vehicles to the EOF.

8.7.1.4 Instruct the SECURITY C00RINATOR to provide access control to EOF.

8.7.2 0F.: NORMAL HCURS - CF.:-SITE TE44 CALL-IN 8.7.2.1 Notify SECURITY CChTROL CENTER (Ext af ECF SET-UP FOREMAN call-in.

8.7.2.2 Initiate paging of. EOF SET-UP FOREMAN.

8.7.2.3 Instruct CENTRAL OIVISION SERVICE DISPATCHER (72-187-383) to call-in 5 0FF-SITE EMERGENCY MONITORING TEAMS. Give DISPATCHER call back telephone numoer to acknowledge completion-of call-in.

B.7.2.4 Instruct ADMINISTRATIVE COORDINATOR to deliver emergency vehicles-to the EOF.

B.7.2.5 Instruct SECURITY COORDINATUR to unlock EOF and provide access control.

  • c:

3 Page 15 of 15 4

, s

-a

)

Attachment C E?-IP-C02 '.

Revision 1 Page 31 of 57 ACTION STEP POWER DISPATCHER ,

Check C.1.0 At the direction of the COMMUNICATIONS CCORCINATOR, the POWER OISPATCHER will:

C.1.1 Notify RECOVERY MANAGER.

Telechone the on-call RECOVERY MANAGER, Idy'se h'.?. of emergency classificati . and cirect him to call the EMERGENCY C: RECTOR.

If the RECOVERY MANAGER cannot be c:n actec by phone, activate the encoder-tc page h'm.

~

If c:ntact still canr.ct be aace, :alaphone an alternate RECCVERY MANAGER.

NOTE: NAMES THE 0'4CNE NUMBERS .aRE IN THE CN-CALL LIST dhICH IS LCCATED IN THE PC.vER ^ONTRCL CENTER.

C.1.2 Activa a ECF and General Office personnel call-in.

Call the LEHIGH SERVICE CENTER SERVICES DISPATCHER on . ind direct.

that he initiate personnel call-in. (These numbers are not for general' distribution or i useage).

NOTE: FOR SITE OR GENERAL EMERGENCY, OFF-SITE PERSONNEL CALL-IN IS TO 8E AUTOMATICALLY INITIATED.

()

Page 1 of I f

i I

s Attachment 0 EP-IP-002 Revision 1 Page 32 of 57 ACTION STEP LEHIGH SERVICE CENTER SERVICE DISPATCHER Check t

0.1.0 At the direction of the PC'.vER DISPATCHER, the LEHIGH SERVICE CENTER SERVICE DISPATCHER will initiate call-in of E2F and General Cffice personnel.

NOR. VAL WCRX HOURS Call ':.:' ear Decar:r.ect .acministratfor en

- ~~a .nc inform thec :na EC.: activattan

s tn progress.

Activate the pagers fer ECF pers:.,nel.

C F.: NORMAL WOURS Activate the :acers for EOF personnel.

(

Ensure cali s cegin ::=ing in:c.phe.ca re::r:er.

If no calls c:me ir.:o phone recorder, call the CN-CALL SITE SUPPORT MANAGER.

If the GN-CALL SITE SUPPORT MANAGER does not arrive at the LSC within 20 minutes of pager activation, call the ON-CALL SITE SUPPORT MANAGER.

If the GN-CALL SITE SUPPOR' GER cannot be reached, call the alternate. I one is contacted.

NOTE: NAMES AND PHONE NUMBERS ARE AVAILABLE IN THE ON-CALL LIST WHICH IS AVAILABLE IN THE LSC TROUBLE ROOM.

I i

C f

l Page 1 of 1

( ~

t l

wi _,y

_ _- 5.- .w 0

a Attachment E EP-IP-002  :

~

Revision 1 Page 33 of 57 ACTION STEP SECURITY COORDINATOR Check E.1.0 The SECURITY COCRDINATCR will instruct the SCC CONTROLLER to:

E.1.1 Upon notification by tne COMMUNICATIONS COORDINATOR-CR-TSC of TSC or EGF personnel call-in:

Estaclisn a listing of ersonne! resconding

0 call-in.

Cemeare actual resoondees to on-call list.

If any en-call pers:nnel do no escenc witnin ten (10) -inutes, attempt o contact by telechone. If unsucces s'ul, :ali -he

< ]k- a :erna es until one is reacneo.

NOTE: NAMES AND ;hCNE NUMEERS ARE AVAILaELE IN THE-CN-CALL LIST '.vdICH IS AVAILAELE IN THE SCC.

l Transfer alternate call-in functica to ADMINISTRATIVE COORDINATOR.

~

E.1.2 At the direction of the COMMUNICATIONS COORDINATOR-CP.-

TSC to block Township Road T-419; notify State Police (Hot Line) to implement same.

E.2.0 The SECURITY COORDINATOR will:

f l E.2.1 At the direction of the COMMUNICATIONS COORDINATOR, dispatch a SECURITY OFFICER to unlock EOF and l establish access control.

l E.2.2 At the direction of the COMMUNICATIONS COORDINATOR-CR-TSC evacuate the site of unnecessary personnel (EP-IP-021).

~~

' E.2.3 For SITE or GENERAL EMERGENCY - direct SCC CONTROLLER to notify State Police to block Township Road I-419.

l E.2.4 Black and establish access control to all incoming l

n roads at site boundary (only PP&L employees allowed to U cross unless otherwise authorized by EMERGENCY DIRECTOR or RECOVERY MANAGER).

l of 2

I O

Attachmer.t E EP-IP-CC2  :

Revision 1 Page 34 of 57 E.2.5 Coordinate and act as liason with outside law

.nforcement agencies.

5.2.5 When directed, Orovide access control and traffic centrol for off-site PP&L locacions.

e O

E 2

l e

fu l U ,

l 2 of 2 I

b-s Attachment F EP-IP-002  :

Revision 1 Page 35 of 57 ACTION STEP RADIATION PROTECTICN CCORDINATOR CHECX F.1.0 The <ADIATICN PROTECT *CN CCCRCINATCR will:

F.1.1 Contique dose projecticas and off-site envie:rmental assessmen: until fun:t' ens are assumed by F.ADIAT:CN SUPPORT MANAGER.

4

. 1..e

.  ?. :. :3.e 4ia -

.g r. 3-.4,/

.. 34. . 3 . . s. ., s. .s , .. 4.

...- . 3 I vm :. :. t.r. :. :ve:c.:.

. . . . . . .. . v.

MCt4*7CR*NG 72AM5 are recuestec. cetify CC.VMUN* CATIONS

CRCINATCR-CR 5C :: erform :na te: essa 3 *c:t:n stets neeced to a:tivate teams.
1. 3

. Previce anc direct N-5ITE RACIATICN MCNITORING PERSONNEL for effluert release assessment.

(} F.1.1 'il cu: acc a:: cove Radiological Assessmen Orm E?-I?-C02-NOTE: This :Orm incluces a pr:tective action ree: menda-1:n.

if no actt:n is re:uirec, sta e "NCNE" t, 3::rc:riate seace.

F.1.5 Maintain communications with and transmit information on Radiological Assessment Form EP-IP-002-2 to OER/SRP radiological personnel until relieved of the rnsponsibility j by the RADIATION SUPPORT MANAGER.

1 F.1.6 Distribute Radiological Assessment Form, EP-IP-002-2, to EMERGENCY DIRECTOR.

F.1.7 IF unable to contact DER /9RP, uti: - cLternate means of c3mmunications per EP-IP-018.

c I .

O Page 1 of 1

Attachment G E?-IP-C02 l Revision 1 Page 36 of 57-ACTION STEP TECHNICAL SUPPORT COORDINATOR Check G.1.C The TECHNICAL SUPPORT CCORDINATOR will:

G.1.1 . Maintain :: munications with CER/ERP technica! persennel regarding plant specifics until relieved of tnis responsibility by the ASSISTANT TECHNICAL SUPPORT MANAGER.

-- G.1.2 Provide anc cirect CN-SITE CHEMISTRY SAMPLING ?E.iSCt.'NEL for li;uic and gasecus efficen: reiesse assesiaen:.

G.1.3 Ucon notifica:fon that :ne GENERAL OF.: ICE EMERGENCY FACILITIES have baen activated direct all requests for engineer _ing assistance to :he ENGINEERING .5UP?CRT LEACER (Ext. (Until the estaoiisneen; of the EC.C Technical <

3 Support Fun: tion. -

d.1.1 Fulioning estabi t snnant of the EC.: Tec.nni:21 Sua:cr:

?cnc:fon, direct all requests for engineering assistance to, ;l the ECF.

1 1

[

l l

i i .

j Page 1 of 1 ,

l

_,_ - _ _ . ~. ,. . _ -

+

3 ,

p .

i Attachment H EP-IP-002 .

Revision 1
Page 37 of 57 ,

7 ACTION STEP ENTRAL DIVISION SERVICE DISPATJHER ,

Check t

i H.1.0 At the direction of the CCMMUNICATIGNS CCCRDINATOR, the CENTRAL DI'/ISICN SERVICE DISPATCHER will:

H.1.1 Call-in the required numcer of GFF-SITE EMERGENCY i

. MONITORING TEAMS. Two cecc!e per team.

yv-rc

. r. nm e i .:.2.3 :. :.s.... e +,c. ..a.-: . s. .. ..:t:.,.  : . _ u._i L-i s4 r. e.__ .. ... _ r .1 . : i

.4 j;.n

. . :: L_: . 4 ;. .:. .. .::

.. 47cu:- - -a.; .m.. :: r. . : .

H.1.2 Notify the CCMMUNICATICNS CCCRDINATOR cf ::::lett:n of 3

team activation.

[ .

(~'

i l

O Page 1 of 1 I- , , ,_ , , . . . . , , .,,-.-,-_.-..-;_,.,,..

i.

At+.achment I EP-IP-002 .'

Revision 1 Page 38 of 57 ACTION STEP RECOVERY MANAGER Check i I.1.0 The RECOVERY MANAGER will:

I.1.1 Af ter ba'er.netified, call -he EMERGENCY 0: RECT:R at S5ES t. j and discuss -he extent of the emergency c:ndition.

I.1.2 Na-ify -ha EC.: staff as f:ll:.vs:

NCRMAL '4C?X :-CLRS I.1.2.1 Cirect the GE!.ERAL C.:: ICE 3bP20RT MANAGER ta con:act the Geae al Offica On-call anc primary emer;ency arl;ers and on-cali s affs anc. have -hem pr:caa- : N-c95.

I.1.2.2 3r'or o EC: activatten, hele periccic u; dates with tne trer;sr.cy Organization.

CF NCRMAL MCLRS Uoon nctification of an UNUSUAL EVENT or ALERT classification:

I.l.2.3 Attempt to contact the on-call GENERAL OFFICE SUPPORi MANAGER and have him in turn attempt to contact the on-call EOF managers and staff to notify them of a potential activation.

NOTE: PERFORMANCE OF THIS STEP IS NOT MANDATORY. IT IS STRICTLY ANTICIPATORY IN NATURE.

I.1.3 EOF activation NORMAL WORK HOURS ,

UMUSUAi EVENT or ALERT ,_

I.1.3.1 If span discussion with EMERGENCY DIRECTOR the RECOVERY MANAGER decides to activate the EOF, instruct the EMERGENCY DIRECTOR TO INITIATE SAME.

.)

Page 1 of 3 C

s %

Attachment.I

Revision 1 Page 39 of 57 SITE or GENERAL EMERGENCY I.1.3.2 EOF automatically activated by EMERGENCY DIRECTOR.

I.1.3.3 Conduct a final briefing of EOF emargency managers a.cd staff in N-49~

NOTE:. IF THE RECOVERY MANAGER HAS NOT ERIEFED THE EMERGENCY ORGANIZATIGN WITHIN 15 MINUTES OF EOF ACTIVATION, THE GENERAL OFFICE SUPPORT MANAGER WILL CONCUCT 1h5 ERIEFING AND OISPATCH THE EMERGENCY ORGANIZATION TO THE SITE.

I.1.3.4 Procesc to EOF.

CFF NORMAL HC'JRS UNUSUAL EVENT cc ALERT 1- -

I.1.3-5

~

. If ucon discussion with EMERGEMCY DIRECTOR the RECOVERY MANAGER cec 1ces to activata the EGF, instruct the EMERGENCY GIRECTCR to inittite same.

SITE or GENERAL EMERGENCY I.1.3.6 EOF automatically activated by EMERGENCY DIRECTOR.

I.1.3.7 Call POWER DISPATCHER v . ,- to veri fy initiation of EOF personnel ~ call-in. ,,

.I NOTE: IF POWER DISPATCHER HAS NOT INITIATED CALL-IN, INSTRUCT HIM TO 00 50 ANO TO CONTACT EMERGENCY DIRECTOR AND VERIFY CALL-IN OF EOF SUPPORT MANAGER AND STAFF.

I.1.3.8 Proceed to EOF.

I.1.3.9 Prepare to and formally relieve EOF SUPPORT MANAGER per 4

EP-IP-030. .

I.1.3.10 Prepars to and formally relieve the EMERGENCY DIRECTOR of those emergency management responsibilities not ~~

already transferred to the EOF SUPPORT MANAGER.

I.1.3.11 Maintain consistency of understanding and direction

< through use of conference calls between TSC, EOF and k>] General Office. If NRC or OER/BRP are present in EOF, have them participate in conference calls.

Page 2 of 3 ,

O Attachmer.: I -

EP-IP-002 l Revision 1 Page 40 of 57 I.1.3.12 Determine the Public Protective Actions required in

)ccordancewithEP-IP-033,DoseAssessmentand Protective Actions.

I.2.0 UPGRADING I.2.1 In the event of an uograce to a SITE or GENERAL EMERGENCY, direct the SITE SUPPCR~ MANAGER to perform tne 3 eps in Attacnment J.3.

.p .

G N

(a, Page 3 of 3

e.

l Attach:nent J '

, __EP-IP-002 .

Revision 1 Page 41 of 57 ACTICN STEP-i SITE SUPPORT MANAGER

l. J.1.0 Upon notificatice of an EMERGENCY, the SITE SUPPORT MANAGFR will:

I NORMAL WORK HOURS i

J.1.1 Report to N-495 for briefing.

J.1.2 Ucen EOF sctivation, report to EOF.

CF: NCP. MAL HC'.'RS I-1 J.1.3 U:en receiving EOF activation page. re::or: :o LSC TROUELE RCCM and verify ECF MANAGER / STAFF response to call-in per EP-IP-013.

4 J.1.4 P. aper: :o EGF. -

i i

i i

4 i

4

'Page 1 of 7 l

d Attachment J EP-IP-002 '.

Revision 1 Page 42 of 57 J.2.0 Upon arrival at EOF take over responsibility for information management, including:

J.2.1 Maintaining communicstions link with GENERAL OFFICE SUPFCRT MANAGER.

J.2.2 Maintaining communications link witn PUBLIC :NFORMAT!CN MANAGED.

J.2.3 Reviewing all crocosed press releases for accuracy and sec re REC'VERY MANAGER a:;roval pr'Or to release. !n his abseace or unavailacility, aut.ori:e re' esse.

J.2.4 Pericci: ally u; dating all ECF cersennel regarcing pian; anc radiological status and emergency nanageman activities.

p) i v

J.2.5 Initiation of T5C/ECF c:nference calls.

J.2.6 Main:2ini.,g a leg of all ac:fvi tes.

J.2.7 Periccically u: dating the NRC agencies as to plan:

status ( see J.a.0).

J.2.3 Maintaining a history of all released information, scecifically, press releases, Inciden Forms (E?-IP-002-

1) and Radiological Assessment Forms (EP-IP-002-2).

l Note, information released by the Control Room or TSC l

should be obtained on a "Not-to-Interfere-Sasis".

l l

r e

/~h i I  ;

<j l

Page 2 of 7 l

l

\.

(,- )

v Attachment J EP-IP-002  :

Reviron 1 Page 43 of 57 J.3.0 UPGRADING EMERGENCY CLAcSIFICATION J.3.1 Only perform those action steps for which the ECF has formally assumed control. ,

TO TO SITE EMERGENCY GENERAL EMERGENCY Announce reciassi- Announce reclass-fication to EOF ificatien to ECF

ers: re!, *.ne :e-3:rnel, r3 MER2ENCY OIREC- EME GE';CY CIREC-TCR and the Gen- T:s a.,c ne len-eral Office eral Office Occument raclassi- Occu. ment reclass-fication, ca:e anc ificatfor. ca:e (J )- time. and ti.e.

NCTE: Cemciete incicent uccole a incicent MUST EE INITIA- far E?-IP-00ZG1 farm E?-I?-CC2-1 EO IMMEDIATELY FCLLC%ING RE-CLASSI:ICATICN NCTIFY: NOTIFY:

DER /BRP DER /BRP NRC PEMS r LCCD l .:

l CEMA t

NRC i

l J.3.2 Notify the PUBLIC INFORMATICN MANAGER.

J.3.3 Disseminate informatic. J~.m Incident Form EP-IP-Cp2-1: to RECOVERY MANAGER, TECH.<ICAL SUPPORT MANAGER, RADIATION SUPPORT MANAGER, GENERAL OFFICE SUPPORT MANAGER AND EMERGENCY __

DIRECTOR.

l J.3.4 In the event of an off-site effluent (gaseous or liquid) release, complete Radiological Assessment Form EP-IP-C02-2

/\-^J, and disseminate information to NRC, RECOVERY MANAGER, TECHNICAL SUPPORT MANAGER, GENERAL OFFICE SUPPORT MANAGER ANO l

EMERGENCY DIRECTOR.

Page 3 of 7

n 0

\

V Attachment J EP-IP-002 .

Revision 1 Page 44 of 57 J.3.5 Ensure that required notifications have been made.

EOF PERSONNEL E. Ey NCO.,1b 3, b,.------lM0*wAVM CF:-SITE AGENCIES PUELIC INFCRMATICN MANAGER

=~.v.

.~....M .=..=

u.2.6 inen ::nci icns enarge s';nificant'y. -e: urn :: E?-:?-0]; and determine whe:ner :: raci a ssify :.ne EMERGENCY.

J.3.7 Ouring s atic condit'ocs (no change in classifica.icn) cerform ;erioc' communica icns/ updates :er A::acnman: J.4 gs

\s (3

V Page 4 of 7

(v\

Attachment J EP-IP-002 .

, Revision 1 Page 45 of 57 J.4.0 STATIC CONDITION - INFORMATICN Up0 ATE, J.A.1 INCIDENT UPDATE MATRIC NOTIFIER ORGANIEATION FITE &

TO EE UNUSUAL GENERAL NOTIFIED EVENT ALERT E'ERGENCY DE?./SRP TECH Tecn. Support Tecn Suoport Coordinator Manager NRC EMER3E';CY Ene gency Site 5;oport Di-ector Manager DIRECTCR REC. MGR. E.T.e rge n cy Site Suopert AS Director Manager G.O. 5"PPCRT SITUATION Recove y Site Scac:r

() - MANAGER Mar.ager Mcn:;:r DICTATES PL'E_IC INFORM- Emergency Site Su:p:-:

ATICN MANAGER Director Manager ENGINEERING Tech. Succort Tech Supoort SUPPORT LEADER Coordinator Manager EMERGENCY No: Not Site Support DIRECTOR Applicable Applicable Macage'

.I For record purposes and incident reconstructions, all incident update information is to be recorded on an Incident Form, E?-IP-002-1, prior to transmission.

Incident update information must be approved by either EMERGENCY DIRECTOR, SITE SUPPORT MANAGER or RECOVERY MANAGER prior to transmission.

Incident update information shoulc be transmitted approximately every 30 minutes or after any significant event (excluding reclassificatio'n which is governed by separate procedure). ,_

" NOTIFIER" listed in Matrix for any given classification is preferred individual. Individual listed in lowest classification has the

~, responsibility for notification until relieved.

(\_'/

Page 5 of 7

f)'\

v Attachment J EP-IP-002 .'

Revision 1 Page 46 of 57

" NOTIFIER" listed in matrix need not perform the update himself but is responsible for seeing that it is accomplished.

I;' ECF activated, -he EMERGENCY DIRECTCR will keec the GENERAL CFFICE SUPPCRT MANAGER aporai sed of E'4ERGE.NCY status un-il relieved cf :ni s function by ECF persennel.

s I

l l

l l

l l

l l

l

  • O l

Page'6 of 7 l

1 l

U Attachment J EP-IP-002  :

Revision 1 Page 47 of 57 i

J.5.0 RADIOLOGICAL ASSESSMENT UPDATE MATRIX (CNLY REQUIRED IN EVENT OF GASECUS OR LICUID EFFLUENT RELEASE)

NOTIFIER CRGANIZATICN SI E &

TO EE UNuscAL GE:4ERAL NOTIFIED EVE' ' ALERT EVERGENCY CER,3RP RA0 _wr gency Racia-ion Raciation Ofrector Protection Succor:

Coordinator Manager NRC EMER3E?.C7 E e gency Site Su:: ort

i-e: :- C' rect:r v ana;er REC. M3R. Eme gency Emergency Site Scoport Director Cirector Manager rN G.O. SUP:CR- Rec:very Recove y Site Suo; -:

\~ > MANAGER v anager Manager Manager E"ERGENCY Healtn Radia.':- S' 3 5;;;;r:

CIRECTOR P ysics Protecti:n Manager Tecnnician Coordinator For recora purposes and inciden reconstruction, all status update information is to be recorded on the Radiological Assessment Form, EP-IP-002-2, prior to transmisson.

Radiological Assessment status update information must be approved by either I

84ERGENCY DIRECTOR, RADIATION PROTECTION COORDINATOR OR RADIATION SUPPORT l MANAGER prior to transmission.

Radiological Assessment status update information should be transmitted approximately every 30 minutes or after any significant change in effluent release status.

" NOTIFIER" listed in Matrix for any given classification is preferred l

individual. Individual listed in lowest classification has the .

  • responsibility for notification until relieved.

" NOTIFIER" listed in Matrix need not perform the update himself but is --

responsible for seeing that it is accomplished.

l ,3 If EOF activated, the EMERGENCY DIRECTOR will keep the GENERAL OFFICE i

(_) SUPPORT MANAGER appraised of EMERGENCY status until relieved of this function by EOF personnel.

l l

Page 7 of 7

3 .

Attachment K cP.

- P_n.0%

o -

Revision 1-Page 48 of 57 ACTION STEP CCMMUNICATIONS COORDINATOR - E0F CFeck UPGRADE TO SITE EMERGENCY K.1.1 A the dire:-f en of t.,e S*TE SUFFORT MANAGER. not'fy 0.:.:-5ITE AGENCIES as Isi ed and transmit the informaticn on Incident Form E?-IP-002-1 to:

.'.RC (H;- Line)

X.1.1.1 Verify -hat CER. ERP nas been n -ifisc by raciclegical s aff.

X.1.7 At -he dire::' n af :he RACIATICN SUP CRT ANAGER, call 'n

.::.3.1:. .  :-. . . :.. . . . v. ..:.. . .. .. .r . .s~~aun. 3u -. _.. ,3. - a ., .r... . .,,, s ,.

a - d <. . a. ...s.i. e..

.s... .i . r.s : e . s t . . 2 . ... .a:3..

., -. . .:. . r an. ........4 _ . . ,:. v. _. .r. .. ... i. .s._ :.. _ o .-

- :_--.: :v: ..:

. 3 ,,

4..

. . 2.a.a,.4.

. . ... ... ..t. ... .. _ .. 3 . . . . v. 9...---- ..-. . . 3 1. . .

\ TEAMS. Give OI5?ATCd.ER call back telecnone number.to i acknowiecge cc cle: ion of call-in.

r.

n - - -- a i K.i.2.2

. .rnstruct n.u .u.tNIa-iaAiiVc tsu- n u;NATOR to deliver additional EMERGENCY vehicles to the EOF. . if required.

t

.)

/

e Pa9e 1 of 2 .

t w-i - *

\=

Attachment K EP-IP-002  :

Revision 1 Page 49 of 57

/

ACTION STEP COMMUNICATIONS COORDINATOR - EOF Check ,

UPGRADE TO GENERAL EMERGENCY K.2.0 The CCMMUNICATIONS CCORDINATOR will:

K.2.1 At the direction of the SITE SUPPORT MANAGER notify 0FF-SITE-AGENCIES is lis ad and transmit -Me inf:rmation en I. c' an-Form E?-I?-002-1 o:

PEMA (hot line')

LCCD (not line)

) CEMA (h t line)- -

NRC (hot line)

K.2.2 Verify nat CER/ERP has been notif tad by radiological s aff.

  • 3 a.m. to a p.m. cnly - all other times call ,

! K.2.3 At the direction of the RADIATION SUPPORT MANAGER, call-in additional 0FF-SITE EMERENCY MONITORING TEAMS as follows:

K.2.3.1 Instruct CENTRAL OIVISION SERVICE DISPATCHER s

. to call in additional 0FF-SITE EMERGENCY MONITORING TEAMS. Give OISPATCHER call back telephone number to acknowledge completion of call-in.

K.2.3.2 Instruct ADMINISTRATIVE COORDINATOR to deliver additional EMERGENCY vehicles to the EOF, if required.

( )

Page 2 of 2

(n)

$v f

Attachment L E?-IP-002  :

Revision 1 Page 50 of 57 ACTION STEP RADIATION SUPPORT MANAGER c-_ck y....--

L . 3. 0 -.ine ne .. i .m

. . .u ,3. tuil a-.dr,POR : . -me:x will:

L.1.1 It. a c.u , t,. c n a l u -s.ii: ,-- . : ., ..CY .yc..u. . v,.,,;. .L . , .y 5 a r e n e e d e s. ,

y-,c-cy

. . . 2 instruct tne CCMMUNICAT*CNS CCLRDINATOR to perform the necessary ac-icas to activate cesirec numcer of eams.

....2  : 2. ; <. 2. ..c

.. ., 2 : - --: -.s.

. . , - v :. . :u ::.

_ . ., e. .<..-.,.1.i4..,.

. . . . a e. ,s ,. ..,,

-e 1.e. .a . -2. .. .,

.::. .: .- . :. :v:: :: ..- ,. v.. -..-,...:

_.. .-  ::v...

a ..4.,n ,,.,.

. . ....c.. ~. . 4.., .

s 3 , ~ ..,.....

... . . . - 4 .. ..>. .,......3

. . , : . . :s . .: .

..,a,,.,. a.e

. 3..a- . .: .. .

.. -,..a..

s... .. ,

e

._ :_ . . . c. o. r , u.. 4..:..e .,2 2., ...... .. ea..s ,

.,.<,.s

. . . . . ,.,.,. :o_. i: n...a.

O

( -).

- i. . ,. . 4 m - .,..... 4. , ,. ., .._. a. ..4.

3-4.at ::.2es>....

.c.. :_.:_. .:-

C32-2, transmi: :ce:; e:ec i: m c 5. iE Suf ?~RT ?'A. NAGER.

NOTE: This f:rm incluces a ore ac 've Action Recc.T~endation, if no i

,-.4..,.... j 3 r. .,, o. s. , 2. .s. s..

... ... 2 n o,u o. :-" < . c. a-... . r . c r ' .- . =. s~

i . ara..

l 1

i l

I 1

I

( ,s/ e

-%s/

l Page 1 of 1

t J

(

4 I 2

4 to .

t

' Attachment M -

[

e_.3 .'P-002 . .,

1- Revision 1 '

i Page 51 of 57 t 4

i 1

1 ACTION STEP ~

TECHNICAL SUPPORT MANAGER l

M.1.0- Tw..e i :.c..o.a,. CAL. c'e. . :r. x i v. ..pp. .C.:R .a .i

. . i .l . .-

z

. t 4 M.1.1 Assume es;cnsibility for cc:munications wi-h CE;. Ei?

i tectn1:ai' ersonnel regarcing O'an: s;:eci f f c s '":- .. a  ;

AS.e 7.s-,i .-i4 4 ---. . .i r. c.A L s. .ur.

g n. a- . 9<. ; .in, u- , . .

:cn.

4

M.1.2 As sure res
ces'bi'ity for c:-_unica:1:qs .,' n - i E'IC-:' EER'.'!G I

, a u , . .-... ,:...,. .:n .c:-

ne ,::... r,,,e>....,,,2-.s.  : : 4 . .~

. # ..- u :3 .

i-L M.1.3 Transmit inf: matten :n Incican- 2e:cc: F0-5 E -::-C02-1 :: >-

. n. :.x.,

.. n,.: wn2., .......

....,.. g .3 . . y. .c . .:. :. .. ::

. r. gt. c.. .nar....

. 2....,

c::c,iatec form c : .r.: s--i- c r .-cn i a.

.v.- n -u : R .

4

?

O' 1

t

't 6

O -

+

Page 1 of 1

, . _ , _ . _ . . . _ . _ . , _ , . _ . _ . . _ . . , ~ _ . _ . _ _ _ _ _ _ _ _ _

s

~

Attachment N EP-IP-002 .

Revision 1 Page 52 of 57 ACTION STEP GENERAL OFFICE SUPPORT MANAGER Check N.1.0 After ceing notified of an EMERGENCY, -he GENERAL OFFICE SUP?0RT

~

MANAGER will:

NCRMAL WCRK HCURS.

N.1.1 Ste-t fy the Geners' 03fice On-call and p-t ary emergea:y managers arc nei- sta#fs a : 'cs cuc :ner. ::.asse cie '- N-435. ,.

N.l.2 C0cedicate cericcic ucca as (by the RECC','ERY MANA3ER) on the s:a us cf tr.e EMERGENCY.

ii.l.3 ists:!'s5 trans:cc:atten a--ange-ents for gererai :'#':e e.rerjency mana;ers anc s.affs.

N.1.4 U:ca. EOF ac: 4 vation. activate :na GENERAL OFFICE NLC'_ EAR EMER5 ENC SCP;CRT CENTER er E?-:?-032 anc c:n ac any general ofce ECF persannel inat nave no respancad.

N.1.5 If the EOF is activated, and the RECOVERY MANAGER has not reportad to N-495 within 15 minutes, conduct a final briefing for general office EOF personnel before they depart for the site.

O__FF-Ho urs N.1.6 At the direction of the RECOVERY MANAGER, attempt 'to contact the on-call general office and site EOF managers and sta#f to notify them of a potential future EOF activation. Report results to RECOVERY MANAGER.

N.I.7 Upon activation of the EOF, activate th. GENERAL OFFICE

  • NUCLEAR EMERGENCY SUPPORT CENTER per E?-IP-032.

~~

N.l.8 Notify TECHNICAL SUPPORT CCORDINATOR (Ext. _ f when GENERAL OFFICE NUCLEAR EMERCENCY SUPPORT CENTER and Genaral Office Engineering Support Origanization are fully activated. .

6 Page 1 of 1

  • O Attachment 0

ACTION STEP ENGINEERING SUPPORT LEADER 0.1.0 After being notified of a SITE or GENERAL EMERGENCY cr E0. ac-tva:icn, the EN3INEERING SUP:0RT LEACER.will ac-!vate the gederal office engineering IJ:: Cort Organi ation per EP-IP-932.

0.1.1 '4 hen the General Office Engineerir.g Su:::crt Organi:2:icn is fully activated, no-ffy GENERAL OF.: ICE SU:?CRT MANAGER.

O A

,i t

Page 1 of 1

t CCNTROL NO.

Attachment P  :

PENNSYLVANIA POWEA 1 LIGHT EP-IP-002 TIME SUSQUEHANNA SES Revision 1 TRANSMITTED INCIDENT FORM Page 54 of 57 A. The INCIDENT was declared as a(n)

Uusual Site General Eent Alert Energency Emergency at en / / .

T u:e Cay Mon n fear

3. DESCRIPTION:

What Hacpenec:

Catse:uer:es:

O- ^=-4ca:

Curren 5:a.us:

t (A?PCVED) 50 or RM or SSM C. NOTIFICATIONS: (What notifications have been made.)

PEMA* NRC*

(Contact) (Time) (Resident) ,.(Time)

LCCD* NRC" (Contact) (Time) (Betnesda) (Time)

CE W. OTHER" (Contact) (Time) (Contact) (Time)

LICENSE MGT." ,

  • Note name of information recipient and time called D. -PRESS RELEASE: Has a press release been made or planned? Yes/No This is of the Pennsylvania Power & light Q E.

Name/ Title Company. Please READ BACK this information to assure accuracy.

FORM EP-IP-002-1, Revision 1, Page 1 of 1

\,

CONTROL NO.

TIME TRANSMITTED Attachment Q .

EP-IP-002 Revision 1 Page 55 of 57 PENNSYLVANIA PGWER & LIGHT ,

SUSQUEHANNA SES RADIOLCGICAL ASSESSMENT FORM i

~t The INCICENT was dec!arad as a (n) t Unusual Site General Even: Alert Emergency Emergency at (2) on (3) / /

(~' e) (:ay) J':-tc) (fair)

The fo!!cwin; is assess e : frf:ena:':n:

(?) Wind cirec:4:n is f*:m a a s ee: Of(5) pn.

(6) The sta'aility class casec on a

/~T (C. 2. i Oc 3)

V (7) :em: era:uce sifferential of  :.5Cm.

(3) The-e is (is nc) ;-ecipi:stien in ene f:rm af (rain, snew, mis )

(9) The current assessac cose rate cased on (Ping Data), (Field Measurements) taken at are:

(Time)

Location: Emer. Plan.

Boundary 2 miles 5 miles 10 miles Whole body dose rate (mrem /hr.)

Thyroid dose rate (mrem /hr.)

(10) The projected dores at assuming current (future time of day) -

release rate are:

Location: Emerg. Plan.

Boundary 2 miles 5 miles 10 miles i

Whole body dose (mrem)

I t'

(~-)/ Thyroid dose (mrem)

FORM EP-IP-002-2, Revision 1, Page 1 of 3

G V

CONTROL NO. .

TIME TRANSMITTED Attachment 0 .

EP-IP-002 Revision 1 Page 56 of 57 are: '..

(11) The integrated doses as of - _ime or_ day) i Location: Emero. Plan.

E undary 2 miles 5 -iles 10 miles Whole bacy dose (mrem)

Thyroid cose (crem)

(.2) he ?-::s:-t /e A:tt:n ac::, mecca-ian is based On (reason)

, (13) is-ima:es of any off-site surface Radicactise C:ntamination (2 M).

_) ' (la) Emergen:y A:ticas I c'evented Onsite. ~

(e.g., ivacua-icn)

(15) Recuest for assis ance f-:: Oucside organi:1-icns. *es___ No (16) 3rognosir of Worsening 2; termina-ion of event.

1 1

,. (17) Remarks: (conditions onsite, casualties, etc.)

t l

(APPROVED ED or RPC or RSM)

FORM EP-IP-002-2, Revision 1, Page 2 of 3 l

l l

v ~ ,, - - - - - -

e CONTROL NO. .

TIME TRANSMITTED Attachment Q .

EP-IP-002-Revision 1 i

Page 57 of.57 1 This is (17) 3'18)

(Name) (Emergency Organization i Title) of the Pennsylvania 2 0ee and Light Cemeany. This notification aas made at (~.9) Or (20) / / :o (i'me) cay M:n n Year i

l-(21) (22) .

Name Title

1aase REA. EG ri s 'sformation to assure 20
uracy.

,i 4

f l

u 6

O FORM EP-IP-002-2, Revision 1, Page 3 of 3 i

y p , , - , - . , - - . . - , - - - . . , -

, - , , - - - . - - , , . , ,,,,,m, ,,_~n,.m , _ , - _ , , - - + , , , - , , - - , , - - . - _ ~ -, -

P

,t .

(d) x .

PROCEDURE CCVER SHEET ,

PENNSYLVANIA PGWER & LIGHT CO.

SUSQUEHANNA STEAM ELECTRIC STATION SURVEILLANCE TESTING OF EMERGENCY EP-IP-102 CCMMUNICATICNS EQUIPMENT Revision 0 Page 1 of 32 l Ef fective Date /- #d-PS ' Expiration Date /-44-f5 R..i.. _ . 0.t. i I

("h CDNTROLLED I

Prepared by N N . ben. h ,-h Date Tf( 62 Reviewed by /M ;8 4)M Date //e4/u PORC Review Required

  • Yas ( No ( )

Approved by i ic Date I b $1-- -

SectionAiead ~J ' '

  • PORC Meeting Hu.mter 88- CC[0 Date //7[83 l ~

As% Date /**/8-83 l o Superintencent of Plan-  :

U FORM A0-QA-101-1, Rev. ' Page 1 of 1

%J EP-IP-102 Revision 0 .

Page 2 of 32 TABLE OF CONTENTS

~

SECT!ON PAGE 1.0 :URPCSE 3 2.0 SCCPE 3

3.0 REFERENCES

3 a.0 RESPONSIBILITIES 3 5.0 DEFINITICNS 4 6.0 INSTRUCTICNS 6 O

's J 7.0 RECOR05 '. 3 ATTACFYENTS ATTAC:-MENT pAGE A Emergency Operation > Facility Hotlines to State and 20 Local Agencies B Emergency Operations Facility Hotlines to the Nuclear 21 Regulatory Commission C Emergency Operations Facility Hotlines to PP&L 22 Emergency Facilities l

0 Control Room and Technical Support Center Hotlines 23 to State and Local Agencies E Control Room and Tecnnical Supoort Center Hotlines 25 to the Nuclear Regulatory Commission ,

F Operations Support Center, Control Room and 26 Technical Support Center Hotlines to PP&L Emergency Facilities

/"N,

(__) G Emergency Radios 23 H Offsite Agency Emergency Contact List 30

b,,~

EP-IP-102 Revision 0 ~.

Page 3 of 32 L 1.0 PURPOSE The purpose of this procedure is to provide the means of maintaining a functional emergency communciations system at all times.

g .,

2.0 SCCPE This procedure defines the frequency and method of surveillance testing of '

emergency communications equioment and the division of responsibilities for performing and documenting these surveillance tests.

3.0 REFERENCES

3.1 NUREG-065a/FE.MA REP-1 Criteria for Preparation and Evaluation of

, Radioicgical Emergency Resconse Plans and Preparecness in Sucport of ,

Nuclear Power Plants

\ 3.2 10CFR50 Aopendix E 3.3 EP-IP-101 Inventory, Insoection, Operational Testing and Calibra:'on of Emergency E;uipment and Su;olies

\

3.4 Susquehanna SES Emergency Plan l 4.0 RESPONSIBILITIES .

l l

l 4.1 Nuclear Administration, under the direction of the Manager - Nuclear Administration, is responsible for:

4.1.1 Ensuring the performance of a weekly functional test of non-station pagers per this procedure.

4.1.2 Documenting any deficiencies noted during non-station pager testing and forwarding a copy of these deficiencies to the SNEP. ,

l 4.2 Nuclear Emergency Planning, under the direction of the Supervisor - --

l Nuclear Emergency Planning, is responsible for:

l f_

4.2.1 Developing a formal hotline rotation testing schedule which

(,s) rotates testing initiation locations from one facility to another.

l 4.2.2 Ensuring the existence of a functional emergency communications system per the overall scope of this procedure.

l

\

(*

  • U)

EP-IP-102 Revision 0  :

Page 4 of 32 4.2.3 Verifying and cocumenting the operation of emergency communication equipment during Health Physics drills and Full Scale Exercises per this precedure.

' t 4.2.4 Ensuring the performance of operational tests of emergency communication ecuipment per this procedure.

4.2.5 Maintaining records of all operational tests of emergency ccmmunicatiens equipment performed.

4.2.5 'lerifying :ne accuracy of all phone numcers listec in tne E.e gency Tele:rone Cirect y an c cuarterly casts.

4.2.7 Reviewing results cf all coeratienal tests cf emergancy communicati:ns equipment to ensura that icentified ceficiencies are corrected in a timely manner.

A

-- J.2.3 Com:leticn arc submittal of all PVIS ?M Wertlists under ne otract resscnsiciitty of hecisar Esergency Fianning per n;s procedu-e 4.3 0: era 1cns. unce- the di ection of tne Supe-visor of C erations, is res:ensicle for:

4.3.1 Ensuring the performance of operational tests of Centrol Room and Tecnnical Support Center emergency communication equipment per this procedure.

4.3.2 Maintaining records of all operational tests of emergency communications equipment performed by Operations by completing Attachments 0 and E when required and forwarding them to the SNEP.

4.3.3 Completion and submittal of all PMIS PM Worklists under the direct responsibility of Operations per this procedure.

5.0 DEFINITIONS ,

~~

5.1 NRC-ENS

Nuclear Regulatory Commission - Emergency Notification System

5.2 NRC-HPN

Nuclear Regulatory Commissinn - Health Physics Network (n/ 5.3 PEMA: Pennsylvania Emergency Management Agency 5.4 DER /BRP: Department of Environmental Resources / Bureau of Rao.u. ion Protection i

5.5 LCCO: Lu: erne County Civil Defense 2 .

_ __ -----__--_u

' (~%

V EP-IP-102 Revision 0 Page 5 of,32 5.6 CEMA: Columbia County Emergency Management Agency 5.7 CSC: Operations Suoport Center 5.3 TSC - Tecnnical Sucport Center 5.9 ECF - Emergency Operations Facility 5.10 SNEP - Supervisor - Nuclear Emergency Planning 5.11 E.D. - Emergency Cirect:r 5.12 Rec. Mgr- - Recovery Manager 5.13 Communication E;ui: ment: Any of the racio frecuency ecuipment used ic-communicatiens between the emergency suoport facilities and discatched g emergency teams or any of ne tele:none lines hotlines pagers, or s,,/ public address systems usec for emergency cc.mmur.f cations anc n:t'#icati:ns.

5.13.'. F :l'ce - 1 pric-ity access v:fca :: muni:ati:n l'nk 41.h act matic signaling esta:lished cetween :ne various eme gency su::ce: facilities and off-site agencies.

5.13.2 Portable radio - A bana held, two way VHF radio used by the on-site monitoring team to communicate with the Control Rocm, T.S.C. , or E.O.F. or a hand held UHF radio usec by various

. in-clant emergency teams to. communicate with the Control Room I

or T.S.C.

5.13.3 Mobile Radio - A two way VHF mobile. radio installed in any of the emergency off-site monitoring vehicles or the Health Physics Van for communication with the Control Room, T.S.C.,

or E.O.F.

l 5.13.1 Page System - A communication system consisting of a paging encoder, which contains tone generating and control equipment, a radio transmitter installation, and a pocket size paging receiver used to locate key personnel ,on and off-l site.

l 5.14 PMIS - Plant Maintenance Information System is a c:mputer based system intended to assist in the scheduling, tracking, and historical

()

i retention of work activities performed at Susquehanna SES.

5.15 PM Worklist - A method of preventative maintenance activity control which is a working document listing work activities or tasks to perform that do not affect system operability. This document is generated weekly and mailed from the PMIS center to each responsible section.

t

. e EP-IP-102 Revision 0  :

Page 6 of 32 5.16 Emergency Telephone Directory - A listing of emergency telephone nucoers which incluces hotlines, PASX extensions and commercial telephone numbers in tne various PP&L emergency res=onse facilities and an offsite agency contact list incarncrating Offsite tele hone numbers for NRC notification, sta e and local emergency management centers, hosoitals, fire companies, ambulance associations, state colice and c:ner telephone numoers from the Emergency Plan Imolementing ?-Ocecures and Le:.ers of Agreement.

6.0 INSTRUC !CNS 6.1 Nuclear kmini s ra:'an

6.1.1 Perfcr

a periodic functicnal tes . of all n n-sta:f =n pagers.

a. Cete iine a credesignatac time for testing once a week 7m 2-d announce :nis time to all ;ersonnel d :n a non-O stati0n Ca;er.
b. Cirect tne Lenigh Service Cen ar anc System C erating 0;we- U-t.O'. Center :: a; ','a:e a'l 1;r-station : agers 3: :ne are:esignated .ime.
c. 00cumen any probiems or ceficiencies that are noted during :nis tes and forward a cc y of these deficiencies to the SNEP.

6.2 Nuclear Emergency Planning h NOTE: A testing schedule will be established by Nuclear Emergency Planning to rotate the hotline testing initiatio- location from the Control Room, TSC and EOF. All hotline tests initiated from the Control Room and TSC will be performed by Operations. All hotline tests initiated from the EOF will be performed by Nuclear Emergency Planning. Only one hntline from the Susq"ehanna SES to each offsite agency must be checked per monthly or quarterly test.

6.2.1 Establish a formal rotation testing schedule to r tate the hotline testing initiation locations from the control room, ~

TSC, and EOF.

6.2.2 Conduct a monthly c mmunication drill to verify two way (o),

operation of the Emergency Operations Facility hotlines to State and local government agencies, as required by the monthly rotation testing schedule. Document the test using

/ttachment A.

p\

EP-IP-102 Revision 0 .'

Page 7 of 32

a. Prior to the drill, develop a simulated scenario message to be delivered to the desired agency use the Incident Form EP-IP-002-1, Rev. O, as a model. The drill message shculd include information concerning emergency-classification, time, date, a brief descri::ica of the incident, c:nsequences, recuirac actions, and current status.

NOTE: Scenario deve10cment will be cocrdinated between Nuclear Emergency Plann'a; ard C;erati:ns to ense e :na: f:rmat anc c:nnents are :cesisten in all : munica:1:n crills.

b. Inform ::erations of :ne time frame duria; wnich the-crill will be perfcrmed anc reques; cha: cersonnel in tne control ecom and TSC not answer the CER/IRP hotline

/~5 or the CEVA otline curing :ni s time f-ame. It is (l suggested : a: a qc e be taped a these chones wi:n the abc.e c'ce:;i:ns.

. Eick ue :ne receiser Of the OEMA h0:line :n:ne that is senaculeC 00 Oe testec.
d. When party answers verify that y0u have contactec the correct agency and say "This is the Susquehanna Steam Electric Station Emergency Operations Facility. We are conducting a communication drill. The following message is si ulated. This is.only a drill ." Deliver the pre-developed drill message. End the message with, "I repeat, this is only a drill."

l l e. Request party to read back the information to ensure the l content of the message has been understood.

l f. Request party to call you back on that hotline to varify j that the hotline will ring at SSES when the call is initiated from pEMA. Verify adequate clarity and volume of call-back transmission. *

g. If two way communication is clear and of adequate volume C with no other deficiencies and the drill message was read back accurately, sign off that the hotline communication to that agency was satisfactorily tested g-)g

(_ on Attachment A.

h. Record any deficiencies noted in the appropriate column on Attachment A.

l L

I i V

E3-IP-102 Revision 0  :

Page 3 of 32

i. P4ck up the receiver of the LCCD hotline phone that is seneculed to be testec and repeat steps 6.2.2.d thru 6.2.2.h of this precedure.
j. Allow sufficient -ime for PEMA to centact CER/ERP and relay the crill message. Answer CEP./ERP nc-line when it rings a ne p5cne sene:uiec :: de :estec and retuest CER/ERP to read cack :ne es sage -hey receive: from PEMA.
k. :sf:-m CER ER? :na y:u a'll call :.nem bac.; :n :na-ha-lire :: very :na: :na :ncre .vi'? c'ng a: tre'r 1cca:':r when :r.e :1.. 4 ,'-fa sc fr:: SIES. !ar'fy acequate :'ari:y and .cleme of call-ca:A ransmission.
1. If :wo way c:mmur.ication with CEReERP is clear and of

,-ss aceauate valune wi:n nn ::rer ce'i 'encies anc :ne drill

('~) message was reac bac( a::urately, sign off that the c:- e ::- uni:a ':  : :ER.E; -as sa. ' sfact: 'ly estec' :n At a rment A.

m. Recor: any cefi:ienc'es ia tre a::re:r'a e column On A :acrmen: A.
n. Allow sufficient time for PEMA to c:ntact CEMA and relay the drill message. Answer CEMA hotline when it rings at the phone scheduled to be tested and request CEMA to read back the message they received from PEMA.
o. Inform CEMA that you will call them back on that hotline to verify that the phone will ring at their location when the call is initiated from SSES. Verify adequate clarity and volume of call-back transmission.
p. If two way communication with CEMA is clear and of adequate volume with no otner deficiencies and the drill message was read back accurately, sign off that the hotline communication to CEMA was satisfactorily tested on Attachment A.
q. Record any deficiencies in the appropriate column of Attachment A.

I~)

\

r

r. Inform ~ operations that the communication drill has been completed.
s. Complete and forward Attachment A to the SNEP.

a

  • (} .

EP-IP-102 Revisica 0 ~.

Page 9 of 32

t. Fill out the PMIS PM Worklist for Attachment A and return it to the PMIS center. ..
u. File At:achment A after it has been reviewed by the SNE?.

NOTE: These ho: lines will be used curing Health Physics crills anc Pull Scale exercises. A separate monthly communicati:n drill will not be recui ed for :ne month during wh'cn a Heal n Physics crill or full scale exer:ise

'-* . :eec ::ccuctec. Times arc ca:es cr ali c:P9' mentn'j criils sna ' :e cc rci ated cy Nuclear Emergen:y Planning w1:n :.9e resconsicie Off-site agency. Nuclear Emergency Planning will fill out tP.e . M:S OM Wceklis; for ' t:acrme . A a# ar :na

("N 3

\' cr'ilievercise 20 mun'catien defic'encias have Osen reviewec.

S.2.3 : nduct : cuar arly :: municati:n drill :J verify two way Operation of the Emergency C erations Fac'i':y notlines to ne Nuclear Regulat cy C:mmissicn, as recuirec :y :re quarterly reta:f on testing schedule (Occumen the test using Attacrment 5).

j

a. Prior to the drill, develop a simulated scenario message i

to be delivered to the.NRC. Use the Incident Form EP-IP-002-1, Rev. O, as a model. The drill message should include information concerning emergency classification, j time, date, a brief description of the incident, l

consequences, required actions, and current status.

l l NOTE: Scenario development will be coordinated between Nuclear Emergency Planning and Operations to ensure that format and contents are consistent in all communication drills.

l

b. Inform operations of the time frame during whfch the ~~

! drill will be performed and request that personnel in the control roon. and TSC not answer the NRC hotline l during this time frame. It is suggested that a note be

! (~'g taped to the phone with the above directions.

\.)

c. Pick up the receiver of the NRC-ENS hotlines phone that is scheduled to be tested.
d. When party answers verify that you have contacted the NRC and say "This is the Susquehanna Steam Electric

T, O

EP-IP-102 Revision 0  :

Page 10 of 32 Station Emergency Operations Facility. We are c:nducting a ccmmunication crill. The following message is simulated. This is Only a drill." Deliver the pre-developec dnill message. -nc :ne message wi-h, "I repeat, this i s only a drill ."

e. Recuest car y to read b1ck the information to ensure :ne c nten of the message has been uncers coc.

f If two way communica:'on is clear ard of acequate v:lume 4' n : ::ner :e#' ientfes arc :he drfil ressa:e as

-es: Ca:k a::ura.ely. :'; :## tha :ne hotline

rma 'st':-  : :9e '.R: eas sa-:s#2::Orf y tes ec :n A::a:n9eit E.
g. Record any cefi ienc'es n0:sc 'n .he a:pr:priate column on A : rmen: E.

O H. C:c:4 ye : e c: nun':!:':n d '11 by testing S : lice

rm;ni:a ':qs to ?EVA, LCCD. CERJER?, arc CEMA as

',s: ,ctec 'n 6.2 2 o# -h4s :-:cedu e. A se: ara e en r:y ::=munica-icn crile '

~!i not te recui ac f:- :na 7:-:n gr' g wni:n ne cuarterly ::c=Lnicati:n Ori is

erf:-med.
i. Complete and forwarc Attachment 9 to the SNEP.

i

j. Fill out the PMIS PM Worklist for Attachment B and return it to the PMIS center.
k. File Attacnment B after it has been reviewed by the SNEP.

6.2.4 Conduct a semi annual communication drill to verify two-way operation of the Emergency Operations Facility hotlines to other PP&L Emergency Facilities as required by the semi-annual rotation testing schedule. Occument the test using Attachment C.  ;

NOTE: It is suggested that these tests be performed about one cd month prior to Health Physics drills and full scale exercises in order to allow sufficient time for any deficiencies to be corrected before the drill or s, .

exercise.

a. Prior to the drill, establish personnel at every phone to be tested to ensure that a complete test of all

. intend 2d phones can be accomplished.

O EP-IP-102 Revision 0 .

Page 11 of 32

b. Pick up the receiver of a hotline phone that is scheculed to be tested.
c. When arty answers verify that you have contacted the correct facility anc tha: two-way ccmmunication is clear and of acequate volume.
d. Reques: party :c call you back on -ha- hotline. Verify adequate clarity and volume of call-back transmission.
e. I' twc way :; muni:stian is : tear anc of ace;ua a val;me j in bc n tes s anc n: : er de#icienc'es are n :ec sign
  1. f : a :be " :lfis ,as :: erat'Oril en A-ta:" Tin- C.
f. .Re; eat tne above est untii all no ld es have been tes ed as re:uired by the rota-icq testing scnecule.

A g. C alete anc for ard A:ta:nmen: C o :ne SNE:.

( j

h. Fili au: :he PMI5 ;M workiist for A::a:." men C and retu-n i to :."e MIS Center, i File A: ac'- en: C after it has been reviewed by t.ae 3 HEP.

6.2.5 Verify operation of the dedicated ERCS Data Link to the back-up EOF semi-annually.

a. Verify that the data CRT displays in the backup EOF are functional.
b. Fill out the PMIS PM Worklist for the back-up EOF Data Link and return it to the PMIS center.

NOTE: These hotlines will be used during Health Physics drills and Full Scale exercises. A

separate quarterly communication drill will not be required for the quarter duqing which a Health Physics drill or full scale exercise has been conducted. Times and dates for all c

other quarterly drills shall be coordinated by Nuclear Eme";ency Planning with the responsibl iffsite agency. Nuclear Emergency Planning will fill out the PMIS PM Worklist

(~)

'-' for Attachment B after the drill / exercise communication deficiencies have been reviewed.

l l

(G v

)

EP-IP-102 Revision 0  :

Page 12 of 32 6.2.6 Verify two-way operation of VHF console base station, mobile, and portable radios listed en Attachment G, semi-annually.

VHF console base station radios are established in the Control Recm, Technical Su:por Center, and Emergency Operations Facility. Yh.: Mobile radios #se use in off-site moni:oring vehicles are stored at :ne EOF. A portable VM.:

racio is stored in the Heal:q Physics Office.

a. Verify two-wcy operation of VHF console base station, m bile. and :ortable radios curing Heal:n Physic crills anc f; l s: lie exercises.
. I# twc way :eration is sa:'s#1:::ry c.rfng t.'e crill/ exercise, sign off na :ne ra ic communicatica wis satisfac rily testec cn Attacnmen; G.
c. Re::-c any deficiencies notec in :ne a:pr:criate c ';mn

() cc A::acemeq: G.

d. Fill 'u: :ne ? MIS PM Werklist for Attachment G after the
ril' exe ci:e ::- uaica-'er :e##cieacies bate :2er reviewe: anc re:ar, ne PM Wc-d is: :o :ne Pu!S center.
e. File Attachmen: G when 6.2.5 anc 6.2.6 of :his procedure have caen comoleted.

l 6.2.7 Verify operation of the VHF console base station radios in the Control Roem, Technical lEupport Center and the Emergency Operations Facility listed on Attachment G, annually.

f .

! a. Verify operation of the UHF console base station radio

( at the Emergency Operations .:acility during full scale i exercises.

b. If operation is satisfactory during the exercise, sign off that the radio was operational on Attachment G.
c. Fill out the PMIS PM Worklist for Attachment 4 after the exercise communication deficiences have been
  • reviewed and return the PM work list to the PMIS center.
d. File Attachment G when 6.2.5 and 6.2.6 of the procedure i

have been completed.

s-)

l l

t

.~

! /

v EP-IP-102 Revision 0  :

Page 13 of 32 NOTE: A battery management program will be effected by all groups having large nuccers of rechargeable batteries for use in UHF or VHF portable radies. This will ensure that satisf actory battery :erfor .ance :an be expected during use :f por: sole -adies in an emergency.

6.2.E Verify accuracy of all emergency telechene num:ers quarterly.

1. s eri #y :.9a al' tete:ncre rur ers li::ec 'n :ne En9"Je" y Isle:r:Ne Ci*e;;;'y ire' car *e::. 20":a00 all aje"c'es an :*3 C ##-s'!e ije" / ~:a; l ' s: . I".:li'me.":

h and se#i fy tr.at the liste0 lu :e

  • ii UTe" 100 correct.

~

/ 'T b. Ifli cut the Ov~5 PM ..crk'is f:r -he E.e ercy kJ Tele:nene Dira : y a- return it .c tre ;$:5 Center.

6.3 C e-a icns NCTE: A :estinc senecule of e es:2'isnec ty Nu ' ear Emer;ercy

?la r'9g :: ec:2:e :ne no::' e testing in':iatice :::a:!:n frcm :ne Centrol Re:m, T5C and ECF. All n::i'ne tests initiated from the Cor. trol Room and TSC will De performed by Cperations. All hotline tests initiated frcm the EGF will be performed by Nuclear Emergency Planning. Only one hotline from the Susquehanna SES to.each offsite agency must be checked per monthly or quarterly test.

6.3.1 Conduct a monthly communication drill to verify two-way operation of the Control Room and Technical Support Center hotlines to State and local government agencies, as required by the monthly rotation testing schedule. Document the test using Attachment D.

a. Prior to the drill, develop a simulated scenario message to be delivered to the desired agency. Use the Incident Form EP-IP-002-1, Rev. O, as a model . The drill message should include information concerning emergency --

classification, time, date, a brief description of the incident, consecuences, required actions, and current A

status.

-)

NOTE: Scenario development will be coordinated between Nuclear Emergency Planning and Oparations to ensure that format and contents e consistent in all communication drills.

' (~3 v

EP-IP-102 Revision 0  :

Page 14 of 32 t

b. On the date the drill is to be performed, request that personnel in the EOF and TSC not answer the OER/BRP hotline or the CEMA hotline during :nis time frame. It is suggested that a note be ta:ed to these chenes with the a:cve airections.
c. ?ick c: ne receive- cf the OEyA hetiine phone that is scneculed te be testec.
d. When party anseers veri #y tna; ycu have contacted the
0-rect agency and say "Tnis is ne Suscuenanna 5 eam E' ectr #c Sta*ica C:":-O' 50 7 ( ~eCa*ical Su :Or:

2 a " e ) . Se are CO*cu::?"; a c F~unica ' 0 Oril' ~"e 50'l0wi1; message is simula:eC. Icis is cnly a c-ill."

Celiver tne pre-cevel:pec crili message. Enc the messace witn, "I repeat, tnis is Only a crill".

,-~

(~-) e. Re:ues: party ta r$ad cack tre informa:icn to e isure na

rten; cf tne message nas :een .ncers ::c.

f ie:ust: ;1r y :: :21' ycu b3:v.Oc :"at 90 1 :: c : ' 'y

na :ne no-ilne will 'ng a: 5555 wnen .5e call 1s ici-iatec frem PEMA. '!arify acecua a cis-ity anc vcl.ma af ca'.1-cack transmission.
g. If wo way coramunication is clear and of adequate volume with no other deficiencies and the drill message was read back accurately, sign off that the hotline communication to that agency was satisfactorily tested

,. on Attachment O.

et

n. Record any deficiencies noted in appropriate column on Attachment O.
1. Pick up the receiver of the LCCD hotline chune that is scheduled to be tested and repeat steps 6.3.1.d thru 6.3.1.h of this procedure.

J. Allow sufficient time for PEMA to contact DEk/BRP and ~~

relay the drill message. Answer DER /BRP hotline when it rings at.the phone scheduled to be tested and request DER /BRP to read back the message they received from PEMA.

q(-

k. Inform DER /BRP that you will call them back on that hotline to verify that the phone will ring at their location when the call is initiated from SSES. Verify adequate clarity and volume of call back transmission.

4 i v.;

EP-IP-10E Revision 0  :

- Page 15 of 32

1. If two way communication with DER /BRP is clear and of adequate volumt with no other deficiencies and the drill message was read back accurately, sign off that the hotline c:mmunication to OER/ERP 5:as satisfactorily tested en Attachment D.
m. Recerc any :eficiencies in the a:Or :riate ::iumn on Attacreen: C.
n. Allow sufficient time f:r :EVA to contact CEMA ard -elay
ne ceil message. laswer CEMA 10:14 e aban in c'rgs a-tre prone s- eCulec : :s testa and re:Ges: CEMA :

ras: ca:( re sssage :ne) es:e'/sc fr: ;EMA.

o. Inf rm CEVA that you aili cali : em back cn that FO:line to ver'fy t.9a- the ph0ne will r'qg at their iccation when tre cal' is faitiatic -:  :::. '/ = ' #- 2 :- e

((-m ) . , .

c i ar::y anc vol .me O f Ca i :-ca:.< traa-i s s ' en.

_j

p. If two aay ::m.munica-icn wi c ^EMA i s c' ear an: of ars:.2:a .; . ? t,'t-  : :- ar :sf':'s c'es a : -ha :r

messa;e aas -sac cack accurataly, sign :f f tna- ne hetiine c:.- uncia-ion : CE.VA was s:-is#a ::r'ly es:sc on Atta nment 3. .

c. Record any deficiencies in the apor priate column of Attachment D.
r. Inform Nuclear Emergency Planning that a co cunication drill has been complet1d.
s. Complete and forward Attachment 0 to the SNEP.
t. Fill out the PMIS PM Worklist for Attachment 0 and return it to the PMIS center.

NOTE: These hotlines will be used during Health Physics drills and Full Scale exersises. A separate monthly communication dril'1 will not be reauired for the month during which a --

Health Physics drill or full scale exericse has been conducted. Times and dates for all other monthly drills shall be coordinated by Nuclear Emergency Planning with the

( ')

responsible off-site agency. Nuclear Emergency Planning will fill out the PMIS PM Worklist for Attachment 0 after the drill / exercise communication deficiencies have been reviewed.

\

\

\%- i EP-IP-102 Revision 0 .

Page 16 of 32 6.3.2 Conduct a quarterly communication drill to verify two-way operation of the Control Room and Technical Support Center hotlines to the Nuclear Regulatory Commission, as recuired by the cuarterly rotation testing schedule. Document the test using ,:tachment E.

a. Prior to the def!l, : eve ~co a simulatec scenari: message to ce teltverec to :ne cesirec agen:y. 'Jse :ne :n;icen Form EP-IP-002-1, Rev. O, as a model. The drill message should include in#crmation concernin; e ergency
assi f':ati:n, time, ca:e, a be'e f descrf::i r # :ne irci:ent. censecuences. a:;i sc a :d e s, anc :.- en:

sta:;s.

NO E: 5:erario : eve'::~ent will be ::orcinatec ce: ween Nucisar Eme gency Planni g arc

,3 C:e-ations to ensure tra forma anc c:nter s

(_,) are :casis e-: in a:1 c: municat'on :r'lis.

b. On :ne ca:e the dri is :o te cer#c-med, recuest :na:

na-:--aet sa re ECr a: IC -- --r,.e - e 9::-ENS 90: ine curing n's ti e 'rame. It is suggestec ra: a note ce a:ec :: ese Or:nes vi:n tre acc.e :irections.

c. Dick uo the receiver o# the NRC-E.15 hotline pnene that is scheduiec to be tested.
d. When party answers verify that you have contacted the NRC and say, "This is the Susquehanna Steam Electric Station Coatrol Room (or Technical Support Center) w4i are conducting a communication drill. The following message is simulated. This is only a drill." Deliver the pre-developed drill message. End the message with, "I repeat, this is only a drill."
e. Request party to read back he information to ensure the content of the message has 2een understood.
f. If two way communication is clear and of adeq'uate volume with no other deficiencies and the drill message was --

read back accurately, sign off that the hotline communication to the NRC was satisfactorily tested on

/

,_s

\

Attachment E.

's '/

g. Record any deficiencies noted in the appropriate column on Attachment E.

n U

EP-IP-102 Revision 0  :

Page 17 of 32

h. Continue the communication drill by testing hotline communications to PEMA, LCCD, CER/ERP, and CEMA as instructed in 6.3.1 of this procedure. A separate monthly communicati n drill will rot ce required for the mon:n during wr en :ne cuarterly c:mmunicatien drill is d

performec.

i. Comple a and fo-warc Attachment E :: -he $NE?.
f. ill cu the ?YIS OM 'de-kli s- for attachmen: E and re;;rn it ta tre :M~.5 : enter

'~ E:

. ese ::Ii es o'll :+ se: c;r' ; .-ea'--

nysics crills a : ru !i 5ca e exe cises. A si:a-ate cuarterly ::- a-1:a:!cn erfil will r.c T e r'ecuirec for :ne :;arter curing wn':n a r' -si r. Onysi:s dri!' :- fu scale exercise

(_)% "as :een ccad;::sc. T':es an: ca:es #ar ali '

- e- uar:e-ij : i s ea:' :s c::- i a:ec by Nu: lear Emergency Piarning wi.n .e -

, 2. .: . . . : 4.x , . . : _ c. 4, . 2 ..2...,,

y... 23.,

Eme ;ency ?!a-ain; wil! fil' Out tre ? MIS ?M Wc-s'is fc- atta:rmac: E af ar tre ,

cri!L ever:ise c:mmunica-ion ceficiencies have been reviewed.

6.3.3 Conduct a semi-annual communication drili to verify two-way operation of Control Room and Technical Support Center i

hotlines to other PP&L Emergency Facilities as recuired by I the semi-annual rotation testing sdbedule. Occument the test using Attachment F.

NOTE: It is suggested that these tests be performed about one month prior to Health Physics drills and full scale exercises in order to allow sufficient time I for any deficiencies to be corrected befcre the

! drill or exercise.

a. Prior to the drill, establish personnel at every phone to be tested to ensure tha; a complete test of all c:

intended phones can be accomplished.

b. Pick up the receiver of a hotline phone that is

\f- -) scheduled to be tested.

c. When party answers verify that you have contacted the correct facility and that two way commu:ication is clear and of adequate volume.

t I

l L

7'j1 .

EP-IP-102 Revisicn 0  :

Page la of 32

d. Request p,rty to call you back on that hotline. Verify adequate clarity and volume of call-back transmission.
a. If two way communication is clear and of adecuate volume in cate. ests anc 10 other ceficiencies are noted, sign off tha: the betiine was coeraticnal on Attacrment F.
g. Com lete and forwar: A achment F t: :ne S?!E?.
h. Fi!1 Ou: -he PMIS PM workiis: for A::achmen: F and

-s urn i: :: taa :"IS :sc:a .

  • ^E: 'a-- ;i-s - e Ou:;': A:: ess 3;,s a- 2'an-c-F cacios, an: PAEX arc C me-ciai ta'e: ene

res t'Eerwick. S'ickshi ny, alle-::wn exchanges) in -he emergercy facilities will

-s  :: te #: ay testec :n a s:bedulsc basis.

/ % Since nis e:.i;ner; is -sac :n a day :: :ay basis cur' ; NCr5al Clart :: era-i s s

era-icna' serv 4:e avat iasi'ity wi'i :s

'aie--i e: ---: ;- . e 53E5 ::-~.ricat': s ma- :ans ;a :r:gra., arc tele:n e serv':e 1;ree ec s.

1 1

7.0 RECORDS 7.1 The PMIS as outlined in AD-00-540,." Preventive Maintenance System" will provide the method of controlling overall documentation of operational tests and communicat',9n drills performed per this procedure.

7.1.1 The responsible supervisor of each designated grouo will ensure the weekly completion of any PMIS PM Worklists under his responsibility per this procedure and submit them to the PMIS center.

7.1.2 Information regarding ooerational testing and communication drill dates, completion code, and employee performing the task from the PM Worklists will be entered into the computer system by PMIS personnel. This will update the PMIS master ~~

file automatically and the computer will print out the next date for the required activity.

(; 7.1.3 The PMIS center will submit all PM Worklists to the Document Control Center (CCC) to be entered into the microfilm system for permanent record.

i' 1

1 l 'O- -

r t ,

! . -s

/

EP-IP-102 i Revision 0  : -

Page 19 of 32 l 4

l 7.2 Additionally, the SNEP will receive records of- communication ' drills and operational tests of emergency communication equipment from the various ~

responsible groups. The SNEP will review these records to ensure that  !

identified deficiencies are corrected in a timely manner.

I l

8 f

l I

I LO L s t

b i

+

I 5

i f

O I

-+-n...,m-. .n_n----,-.

m

, N-)

Attachment A EP-IP-102 .

Revision 0 Page 20 of 32 Communication Drill Date Emergency Operations Facility Hotlines to State and Local Agencies-Verifiec y (Initials): Ceficiencies Hotline to: (Write NT if not tested) (use back as nec.)

1. LCCD (Rsc. Mgr.)

LCCD (Site Su::c - Mgr. East Desk)

LCCJ (Site Su::c-: M;r. Wes: Jesk)

2. CEMA (Rec. Mgr.)

CEMA (Site Se::ce: Mgr. Eas: Desk)

-)

~

CEVA (Site Suppect Mgr. West Cesk)

3. PEMA (iec. ver.)

PEMA (Site Su:::c: Mgr. Eas: Cesk)

PEMA (Site Support Mgr. West Desk) 4 OE9/SRP Rad (Rec. Mgr.)

DER /BRP Rad (Rad. Mgr.)

5. OER/BRP Technical (Tech. Area)*

Reviewed by

- SNEP v

  • To be tested only during annual Full Scale Exercises f

FORM EP-IP-102-1, Rev. O, Page 1 of 1

I ..

1 i

i.

Attachment 3 EP-IP-102 .

Revision 0 Page 21 of 32 Communication Drill Date Emergency Operations Facility Hetlines to the t[uclear Regulatory Commission Verified by ('nitials): -Deficiencies Ho-line to: W-ite NT if net ested) [yse back as nec.)

1. NRC-ENS (Rec. Mgr.)

NRC-ENS (Si e Sue;cet Mgr.)

NRC-ENS (NRC C:nf i::2)

.iRC--PN lNRC Conf R.,) NT Reviewed by:

i SNEP C

O FORM EP-IP-102-2, Rev. O, Page 1 of 1

1

\ l A

V Attachment C EP-IP-102  :

Revision 0 Page 22 of 32 Ccmmunication Orill Date Emergency Operatij.-i Facility Hotlines to PP&L Emergency Facilities E

t Verified by (Initials): Ceficiencies Hetlice to: (Write NT ff nc: tes ad) (use ba:k as ec.)

1. Can rol R0cm (Rec. Mgr.)
2. Tecnnical 5;;;ce- Cer. er (ie . Vgr.)

Te: .nicai 5.::c - Ce- er (Si a 5;;;;r .

Mgr. Eas :ess)

Tecrr.ica! Sue:Or: Center (Si a S;;:Or

(~)1 Ver. 'ae s- :ss s)

%w/

7e:hni41 SL OOrt " inter (*.Onf 5.;)

3. :ensra' :'#': - 195 (Ra:. M;r.)

General Cfce - 195 (54 e Su:;c ; Mgr.

Eas :e s.s)

General Office - 495 (Site Support Mgr.

We:t Desk)

General Office - 495 (Conf. R '

4 Special Office of the Prest Mgr.)

5. Media Operations Center (Rec. nyr.)

e Reviewed by SNEP 1

O FORM EP-IP-102-3, Rev. O, Page 1 of 1

O)

L Attacnmen: 0 EP-IP-102  :

Revision 0 Page 23 of 32 Communication Drill Date

-dentrol Room and Technical Sucport Center Hotlines to State and Local Agencies A. CCNTROL RCCM HOTLINE 5 Verifisc by (Initiais): Ceficiencias

'o:1*ne to: (W-ite NT ff nc: tested) (use back as nec.)

1. LCCD _

.. c. :.v. .

3. ?EVA 4 CER'ERP - Rad.

(~

\- . . . , - - , _ . . . . _ _ , . . . . . . , _ .

2 . _:_. r._.. .. .- . . L d s - - u m + : u :.~. -_.:..::

'le-ied ty (In':'a's): Ce#':'s :1es

'c:ne to:

( w-i t e .57 i ' e : estec) (use cac( as ec.)

l 1. LCCO (C:nf. Room) l l LCCD (Comm. /rea 1) l

! LCCD (HP Comm. A.ea) l 2. CEMA (Conf. Rm.)

1 CEMA (Comm. Area 1)

CEMA (HP Comm. Area) 2

3. PEMA (Conf. Rm.)

.PEMA (Comm. Area 1)

PEMA (HP Comm. Area)

FORM EP-IP-102-4, Rev. O, Page 1 of 2

O Attachment 0 EP-IP-102  :

Revision 0 Page 21 of 32

4. DER /BRP Rad. (Conf. Rm.)

DER /SRP Rad. (Comm. Area 1)

CER/SRP Rac. (HP Comm. Area)

5. CER/3R? - Tec."nical (Tech Area)"

i I

l

(~)

\~ Reviewec by Reviewed by

( 5_:;  : f .'; s . 5:,E?

1 t

i l

" To be tested only during annual full scale exercises.

l P

'\ )

FORM EP-IP-102-4, Rev. O, Page 2 of 2

F-T Attachment E EP-IP-102 .

Revisten 0 Page 25 of 32 Communication Drill Date Control Recm and Tecnnical Suppor: Center Hotlines to the Nuclear Regulatory Ccemission A. CONTRCL RCCM HOTLINES Veriffe: by (Inittlis): Ceficiencies Ho:line :c: (write NT ff ..c: testaci (use back as rec.)-

1. NRC-ENS

.. .s.:.- <, z

..a... ..

2. -: ,J-- . s- i

__...7,A.: : .. . . . c '_

v:y___. . : :x - a u. .. . .. . ::

(~T Ve-i fisc ty ( ~-i t'ai s): Caf'c'en:fes

%/ '::i'ne to:

(or t e .' T i ' :: :es eci (use back as ec.)

1. '

..RC-ENS (HP 0 mm. Area)

NRC-ENS (NRC Canf, :.n.)

NRC-H?1 (NRC Conf R.) NT i

1 i

. ,e Reviewed by Reviewed by Supv. of Ops SNEP

(

I FORM EP-IP-102-5, Rev. O, Page 1 of 1

r O

8.s i

Attachment F EP-IP-102  :

Ravision 0 Pa.c,e 26 of 32 Communication Orill Date _

Operations Succort Center, Control Room and Technical Supeort Center Hotlines to PP&L Emergency Facilities

.- 0 .,% u.vlLiaC-V F O Tr e 1. ., , .. - .Obr.

, , e nvT

., i

6. c. c41 .n . . v 3 Verifisc by (Initials) Cefic'encies Hotline to: (write NT if not testec) (use ba:'s as nec.1
1. :09 r:1 R:cm
3. CCN'?.CL ?.CCM 'CT' INES O

.arifie: by (I-i:ia's) Ceft:tencies

-:: a ::: ( -4 :s '
. ter st'; f.rs ba:. is ec.)
1. CSC 3 .: ..-
3. ECF l

4 General Office - 495 l

5. Security Control Center l 6. Alternate Security Control Center
7. Power Control Center C. TECHNICAL SUPPORT CENTER HOTLINES l Verified by (Initials): . Deficiencies Hotline to: (write NT if not tested) (us'e back as nec.)
1. Control Room (Conf. Rm.)

(m i

Control Room (Comm. Area la) l Control Room (Comm. Area lb)

Control Room (HP Comm. Area) j FORM EP-IP-102-6, Rev. O, Page 1 of 2

.. - - =. . . .- ..

1 Attachment F  :-

EP-IP-102  :

Revision 0 Page 27 of 32

2. OSC (Cemm. Area la) .

CSC (Cc=m. Area lb)

OSC (HP Comm. Area)

3. EOF (Cenf. Rm.)

EOF (Comm. Area la)

. : c. . .. r.. . .i r =. a- .->

ICF (MP Co =. .irea)

' 1 General Office - 195 (:enf. R=.)

1 '

("$g Ge.ceral Offica - 295 (00:m. Area 1)

\_/

Gaae-al C'# ice - 195 (a? C:,m. :-es) i

.  ::::'ai 0...f:a --
. . a s 'ts (_.D.)

Reviewed by SNEP 4

, FORM EP-IP-102-6, Rev. O, Page 2 of 2

i, O

V Attachment G EP-IP-102  :

Revision 0 Communication Orill Data Page 28 of 32 Emergency Radios

1. VHF Radios i

Ve-ifie: by Ceficiencies A. Dorta:le (Inistais): (use back as nec.)

1. .-eal:n Physics (Cn-site Manf t:r)
3. M0:4'e

.. - s a i t '- :qy s i:s '!:-

2. Cff-stte tear ',s.':!as
a. V2hicle '. (AT:na)

G

.er : e c 1: av:)

. * =f=

l / .

x/  :.

c. Vehf cia 3 (Char'ie)
d. Vent:!e ' (:e':2,
e. 'lehicle 5 (E:n:)

C. Console Base Station

1. Control Room
2. Technical Support Center
3. Emergency Operations Facility
a. Site Suppor Manager's Office
b. Radiological Monitoring Office f) w/

Attachment G EP-IP-102 .

Revision 0 Communication Orill Date Page 29 cf 32

2. UHF RADIO Console Base Sta* ion 1
1. Control Recm
2. Tecnnical Sure:r Center

.3. Emergency Opera:fons Facility (Sita Sup Or- Mgr. Cffica)'

J is /'*wec by

- 5:,E?

i l

i i

i i

1

-O FORM EP-IP-102-7, Rev. O, Page 2 of 2

o

+

Attachment H EP-IP-100  :

Revision 0 Page 30 of 32 OFFSITE AGENCY EMERGENCY CCNTACT LIST Becntel Power Corporation Gene-al Electric Security Con rol Center ,.

EWR Exe-cancy Su;:per: Program s

5e-wick Wespital Mc'-ie c Volunteer ri-e Co.

701 E. 15:n St.  :. 0.-:

Eer.'ct. :A 13603 %i:-1;lueen, P 13553 Eili Ct sen W':1 :s : nan;ac enc of January 1332 u ..,.

C:ur: i:*. s e lil: ..ater P!a:e W. Ma'n 5:. .:'a ta. SA 3:339 E'::- :.;rg. A 1 F.5 ~'

E- ar:e :y les::nse er:er Car Sevis n , , -

DER.'ERP Luzerne Ccunty Civil Cefense P.O. Box 2063 Control Center, Courtnouse Harrisburo.

PA 17120 .

Wilkes Barra PA 18702 r _ .

_. if .

East Berwick Hose Co. No. 2 National Weather Bureau

'~

Sth and Central Ave. -

Berwick, PA 18603 ,

under severe conditions:

Tim Strong- -

Geisinger Medical Center Nescopeck Ambulance Assn..*

Oanville, PA 17822 Warren St.

John I. Skiendrielewski, M.D. Nescopeck, PA 18635 a Emergency Department ,

( L.i a f e F1'i cht . ..

,,,s FORM EP-IP-102-8, Rev. O, Page 1 of 3

l O

(

Attachment H EP-IP-102 .

Revision 0 Page 31 of 32 -

Northwest Area School District Philadelphia Electric Company Environmental Sample Team Mutual Radielegical Suppor: Program-

__ - Northwa(t irai.Hig.iSchool ._ -

Peach Bott:m Atomic Power Station NRC

1. Emergency Notification System Pond Hill-Lily Lake Fire Co.

to NRC 0:erations Center R.O.#1 Lif- Receiver fr m Crsdie Wa;walic:en, PA 13550 . ~"

2. C:m ere'al Telechene System to Lee ard Py:ta, Ores- .

hRC C; era:fons Center (via Ee:nesca Cen ral Offics):

(202)-951-C550

3. Commercial Tele;hene System to Radiation Management Ccrporaticn

<- NRC Cperaticas. Car.ter 35C3 Varke- 3:reet-(via Siiver Scrings Cen ral Office) ?h' acei:nfa, ?A 19'.01 (301)-a27-1056 54 cle araiysis .__

d. Health Physics Network to Weessays 9. M - 5?M ' ,: -

NRC Ccera-4cns Cente- All other '?es-

  • 22 (T:::h-T:na) EMA Pg' 22 (Rotary Oial)
5. Commercial. Telephone System Safety Lign: Corporatien to NRC Ooerator 4150-A Olc Berwick Read (via Bethesda Central Office) Bloomsburo _PA 17815 (301)-492-7000 .-r

~~_.__ -

~

PEMA Salem Township Fire Co. No. 1 P.O. Box 3321 Beach Haven, PA 18601 Harrisburg, PA 17105 Maurice Miller, Fire Chief Dewitt, C. Smith, Jr. Director s Pennsylvania State Police Shickshinny Area Vol. Ambulance Assoc.

Shickshinny Barracks 50 Furnace Street .

P.O. Box 66 Shickshinny, PA 18655 -

Shickshinny, PA 18655 C ' dispatched via PA. <

State Police

~

~

i

(

FORM EP-IP-102-8, Rev. O, Page 2 of 3

~

4

Attachment H EP-IP-102 .

Revisic 0 Page 32 of 32-G. ,

I

! Pennsylvania State Polica Shickshinny Fire Department

. Troop "P" B1 North Main Street Wyer.ing, PA 18641 Shickshinny, PA' ' 15655

~ " " , James J. Bach. Presiden:

~

A I

Susquehanna Biological Laboratory l

(~' , ,

9 i

i i

t -

1 s.

si C

..y -