ML20070V645

From kanterella
Jump to navigation Jump to search
Forwards Public Version of Rev 1 to Emergency Plan Implementing Procedure EP-IP-002, Emergency Mgt Notifications & Rev 0 to EP-IP-102, Surveillance Testing of Emergency Communications Equipment
ML20070V645
Person / Time
Site: Susquehanna  
Issue date: 01/28/1983
From:
PENNSYLVANIA POWER & LIGHT CO.
To: Schwencer A
NRC
Shared Package
ML17139B352 List:
References
NUDOCS 8302170490
Download: ML20070V645 (1)


Text

.

~

SUSQUEHANNA SES RECORDS MANAGEMENT SYSTEM CONTROLLED DOCUMENT TRANSMITTAL 1/28/83 To:

Al Schwencer Washington D.C.

( 8 Sets )

/

From:

O Supervisor - Records Systems and Procedures, N-4 O Supervisor - Nuclear Records System - GO, N-3 3 Supervisor - Nuclear Records System - SSES Attached are the following new or revised documents:

(When document is procedure, include manual title)

EP-IP PROCEDURE CONTROLLED MANUALS EP Table of Contents Eff. Date 1/20/83, Rev. 8 EP Forms Index Eff. Date 1/20/83, Rev. 4 EP-7f-002,Re;, 1 Er'-IP-102,Rev, 0 Discard / void the following superseded documents:

(RETURN THE FOLLOWING SUPERSEDED DOCUMENTS)

. RETURN TO:

Pennsylvania Power and Light Co.

Document Control Center ATTN: Supv. of Nuclear Records P.O. Box 467 Berwick, PA 18603

/T fPlaase. sign and return,

e. copy of this form within ten working days to

, sender to acknowledge receiptp.,

By signing the Return-Receipt, the addressee attests that the documents received agree with the above listing, that all superseded documents have been destroyed / voided, that the documents have been incorporated into the proper files, and that the appropriate personnel have been made aware of.the changes.

8302170490 830215 PDR ADOCK 05000387 F

PDR l

f

.Str:*r:

?.r