Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20042F233 + (ML20042F233)
- ML20042F234 + (ML20042F234)
- ML20042F235 + (ML20042F235)
- ML20042F238 + (ML20042F238)
- IR 05000416/1990006 + (ML20042F240)
- JAFP-90-0358, 1989 Radiological Environ Surveillance Rept,Jan-Dec 1989 + (ML20042F242)
- ML20042F243 + (ML20042F243)
- IR 05000382/1990006 + (ML20042F245)
- ML20042F246 + (ML20042F246)
- ML20042F247 + (ML20042F247)
- ML20042F249 + (ML20042F249)
- ML20042F251 + (ML20042F251)
- ML20042F252 + (ML20042F252)
- ML20042F253 + (ML20042F253)
- ML20042F254 + (ML20042F254)
- ML20042F255 + (ML20042F255)
- ML20042F259 + (ML20042F259)
- ML20042F261 + (ML20042F261)
- 0CAN049013, 1989 Annual Environ Radiological Monitoring Rept + (ML20042F262)
- ML20042F263 + (ML20042F263)
- ML20042F264 + (ML20042F264)
- ML20042F266 + (ML20042F266)
- ML20042F268 + (ML20042F268)
- 1CAN049007, Provides Exam Schedules for Reactor Coolant Pumps a & B in Revised Inservice Insp Program Plan.Insps Scheduled for Refueling Outages 1R10 & 1R12 for Pump a Exams & Refueling Outages 1R10,1R12 & 1R14 for Pump B Exams + (ML20042F270)
- ML20042F272 + (ML20042F272)
- ML20042F274 + (ML20042F274)
- ML20042F276 + (ML20042F276)
- ML20042F278 + (ML20042F278)
- 05000346/LER-1990-006, :on 900403,station Experienced Safety Features Actuation Sys Levels 1 Through 5 Actuation.Caused by Contact W/Breaker Switch HAAE2 in High Voltage Switchgear Room 2. Meetings Held W/Craft Personnel + (ML20042F279)
- ML20042F280 + (ML20042F280)
- 05000346/LER-1990-007, :on 900403,inadvertent,inconsequential Safety Features Actuation Signal Occured While Defueled.Caused by Incidental Contact W/Monitor in Containment.Temporary Barriers Built Around Monitors + (ML20042F281)
- NLS9000184, Clarifies Initiating Conditions Listed in Re Review of 890919 Rev 11 to Plant Emergency Plan.Gaseous Release Emergency Action Level Established as High Alarm on Effluent Monitor + (ML20042F282)
- ML20042F283 + (ML20042F283)
- TXX-9015, Supplemental Response to Generic Ltr 90-01, Request for Voluntary Participation in NRC Regulatory Impact Survey + (ML20042F285)
- ML20042F286 + (ML20042F286)
- ML20042F290 + (ML20042F290)
- ML20042F291 + (ML20042F291)
- ML20042F292 + (ML20042F292)
- ML20042F293 + (ML20042F293)
- 05000311/LER-1990-012, :on 900403,radiation Monitoring Sys Plant Vent Radioactive Noble Gas Monitor 2R41C Lost Power Resulting in Isolation in Containment purge/pressure-vacuum Relief Sys. Cause Not Determined + (ML20042F296)
- ML20042F299 + (ML20042F299)
- IR 05000458/1990009 + (ML20042F301)
- ML20042F302 + (ML20042F302)
- ML20042F303 + (ML20042F303)
- TXX-9016, Provides Revised Response to Generic Ltr 88-17 Re Loss of DHR + (ML20042F305)
- ML20042F306 + (ML20042F306)
- IR 05000267/1990005 + (ML20042F307)
- PNO-I-90-037, on 900428,power Ascension Program Torsional Test of Main turbine-generator Completed.Normal Plant Shutdown Accomplished on 900428.Temporary Mods to Shift Resonance Peak Expected to Take 4 to 6 Wks + (ML20042F308)
- ML20042F309 + (ML20042F309)
- ML20042F311 + (ML20042F311)
- IR 05000482/1990019 + (ML20042F313)