ML20042F264
| ML20042F264 | |
| Person / Time | |
|---|---|
| Site: | Perry |
| Issue date: | 05/04/1990 |
| From: | Hannon J Office of Nuclear Reactor Regulation |
| To: | |
| Shared Package | |
| ML20042F265 | List: |
| References | |
| NUDOCS 9005080067 | |
| Download: ML20042F264 (5) | |
Text
.
83q* ugg'o UNITED $TATES ri NUCLE AR REGULATORY COMMISSION i,
Al WASHINGTON, D. C. 20555
\\,
/
- ...+
THE CLEVELAND ELECTRIC ILLUMINATING COMPANY ET AL.
5 DOCKET NO. 50-440 s
PERRY NUCLEAR _ POWER PLANT, UNIT NO. 1 AMENDMENT TO FACILITY OPERATING LICENSE Amendment No. 28 License No NPF-58 1.
The Nuclear Regulatory Comission (the Comission) has found that:
A.
The application for amendment by The Cleveland Electric Illuminating Company, Duquesne Light Company, Ohio Edison Company, Pennsylvania Power Company, and Toledo Edison Company (the licensees) dated March 16, 1990 complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Comission's rules and regulations set forth in 10 CFR Chapter I; B.
The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Comission; C.
Thereisreasonableassurance(i)thattheactivitiesauthorizedby this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Comission's regulations; D.
The issuance of this amendment will not be inimical to the comon defense and security or to the he61th and safety of the public; and' E.
The issuance of this amendment is in accordance with 10 CFR Part 51 of the Comission's regulations and all applicable requirements have been satisfied.
2.
Accordingly, the license is amended by changes to the Technical Specifi-cations as indicated in the attachment to this license amendment, and paragraph 2.C.(2) of Facility Operating License No. NPF-58 is hereby amended to read as follows:
hh bhh hhh 40 p
l 2
i (2) Technical Specifications r
The Technical Specifications ccntained in Appendix A and the Environ-mental Protection Plan contained in Appendix B, as revised through Amendment No. 28 are hereby incorporated into this license.
The Cleveland Electric Illuminating Company shall operate the facility in'
-accordance with the Technical Specifications and the Environmental Protection Plan.
3.
This license amendment is effective as of its date of issuance.
FOR THE NUCLEAR REGULATORY COMMISSION NGL
. n N. Hannon, Director Project Directorate III-3 Division of Reactor Projects - III, IV, Y and Special Projects Office of Nuclear Reactor Regulation
Attachment:
Changes to the Technical Specifications Date of Issuance:
May 4, 1990 m
v e
ATTACHMENT TO LICENSE AMENDMENT NO. 28 FACILITY OPERATING LICENSE NO. NPF-58 DOCKET NO. 50-440 Replace the following ) ages of the Appendix "A" Technical Specifications with the attached pages. T1e revised pages are identified by Amendment number and contain vertical lines indicating the area of change. The changed pages are overleaf pages to each other and therefore maintain document completeness.
Remove Insert 3/4 3-19 3/4 3-1g 3/4 3-20 3/4 3-20
TABLE 3.3.2-2 (Continued) 2 ISOLATION ACTUATION INSTRUMENTATION SETPOINTS
~
N ALLOWABLE TRIP FUNCTION TRIP SETPOINT VALUE E
M 5.
REACTOR CORE ISOLATION COOLING SYSTEM ISOLATION a
a.
RCIC Steam Line Flow - High 1 290" H 0**
1 298.5" H 0**
2 2
b.
RCIC Steam Supply Pressure - Low
> 60 psig
> 55 psig c.
RCIC Turbine Exhaust Diaphragm Pressure - High 1 10 psig 1 20 psig d.
RCIC Equipment Room Ambient Temperature - High
< 143.4*F
< 145.9 F w
e.
RCIC Equipment Room a Temperature - High
< 95.9 F
< 97.2'F l
f.
Main Steam Line Tunnel Ambient Temperature - High 1 154.4 F 1 158.9'F g.
Main Steam Line Tunnel A Temperature - High
< 103.6'F
< 107.4*F E
h.
Main Steam Line Tunnel Temperature
,8-Timer 1 29 minutes 1 30 minutes s"
i.
RHR Equipment Room Ambient Temperature - High
< 157.4'F
< 159.9'F o
?
j.
RHR Equipnent Room y
a Temperature - High 1 50.65'F 1 52.4*F 5
k.
RCIC Steam Flow High Timer 3 seconds i t i 13 seconds 3 seconds i t i 13 seconds 1.
Drywell Pressure - High 1 1.68 psig i 1.88 psig m.
Manual Initiation NA NA
=,
TABLE 3.3.2-2 (Continued) f!
ISOLATION ACTUATION INSTRUMENTATION SETPOINTS ALLOWABLE TRIP FUNCTION TRIP SETPOINT VALUE c:5 6.
RHR SYSTEM ISOLA 1 ION a.
RHR Equipment Area Ambient Temperature - High
< 157.4*F
< 159.9'F b.
RHR Equipment Area a Temperature -
High
< 50.65'F
< 52.4'F c.
RHR/RCIC Steam Line Flow - High 5.105" H 0**
yL 114" H 0**
2 2
d.
Reactor Vessel Water Level - Low u,
];
Level 3
> 177.7 inches *
> 177.1 inches w',
e.
Reactor Vessel (RHR Cut-in Permissive) Pressure - High 5,135 psig
- 3.150 psig c) f.
Drywell Pressure - High 5,1.68 psig 3L 1.88 psig g.
Manual Initiation NA NA 6"
k
- See Bases Figure B 3/4 3-1.
@f
- Initial setpoint.
Final setpoint to be determined during startup test program. Any required change to this setpoint shall be submitted to the Commission within 90 days of test canpletion.
5
,-e-
.a
' -.~---
s g
__,a.__
~........ --
-