Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20033B531 + (ML20033B531)
- ML20033B532 + (ML20033B532)
- ML20033B533 + (ML20033B533)
- ML20033B534 + (ML20033B534)
- 05000247/LER-1981-023-03, /03L-0:on 811014,perturbation in Secondary Blowdown Piping Associated W/Steam Generator 21 Resulted in Failure of Bolts Between Strut Assembly & Base of Snubber 46-SR-3.Cause Due to Water Hammer.Bolts & Snubber Replaced + (ML20033B537)
- ML20033B538 + (ML20033B538)
- ML20033B539 + (ML20033B539)
- ML20033B540 + (ML20033B540)
- ML20033B542 + (ML20033B542)
- 05000272/LER-1981-100, Forwards LER 81-100/03L-0.Detailed Event Analysis Encl + (ML20033B543)
- 05000247/LER-1981-024-03, /03L-0:on 811014,snubber 70-SR-13 on Pressurizer Relief Line & Bergen Patterson Hydraulic Snubber Hssa 3 Shaft Found Broken.Caused by Transverse Impact Load on Snubber Piston Rod.Snubber Replaced & Rod Analyzed + (ML20033B546)
- ML20033B547 + (ML20033B547)
- ML20033B548 + (ML20033B548)
- ML20033B549 + (ML20033B549)
- ML20033B550 + (ML20033B550)
- ML20033B551 + (ML20033B551)
- 05000272/LER-1981-100-03, /03L-0:on 811019,during Startup Preparation, Neutron Level & Startup Rate Meters for Intermediate Range Nuclear Instrumentation Channel 1 Were Spiking from 0 to Full Scale.Caused by Failed Power Supply + (ML20033B552)
- ML20033B553 + (ML20033B553)
- ML20033B554 + (ML20033B554)
- ML20033B555 + (ML20033B555)
- ML20033B556 + (ML20033B556)
- 05000272/LER-1981-099, Forwards LER 81-099/03L-0.Detailed Event Analysis Encl + (ML20033B557)
- ML20033B559 + (ML20033B559)
- IR 05000267/1981023 + (ML20033B563)
- ML20033B564 + (ML20033B564)
- 05000334/LER-1981-093, Forwards LER 81-093/03L-0 + (ML20033B567)
- 05000272/LER-1981-101, Forwards LER 81-101/03L-0.Detailed Event Analysis Encl + (ML20033B569)
- 05000272/LER-1981-099-03, /03L-0:on 811022,containment Fan Coil Unit 12 Was Indicating Low Flow in Low Speed Mode.Caused by Flow Transmitter Plugged W/Silt.Transmitter Blown Down & Tested Satisfactorily + (ML20033B571)
- ML20033B572 + (ML20033B572)
- 05000272/LER-1981-101-03, /03L-0:on 811021,while Cycling Pressurizer Auxiliary Spray Line Isolation Valve 1CV75 During Surveillance,Pressure in Pressurizer Dropped Below 2205 Psia.Caused by Incorrect Valve Liftoff Pressure Setting + (ML20033B573)
- 05000334/LER-1981-093-03, /03L-0:on 811017,during Battery 1 Quarterly Surveillance Test,Cells 6 & 55 Indicated Voltage Decreased Below Level Allowed by Tech Specs.Engineering re-evaluation Requested.Cells Replaced + (ML20033B574)
- 05000311/LER-1981-110, Forwards LER 81-110/03L-0.Detailed Event Analysis Encl + (ML20033B577)
- IR 05000333/1981021 + (ML20033B579)
- 05000245/LER-1981-029, Forwards LER 81-029/03L-1.Detailed Event Analysis Encl + (ML20033B581)
- 05000220/LER-1981-048, Forwards LER 81-048/03L-0 + (ML20033B583)
- 05000311/LER-1981-110-03, /03L-0:on 811026,while Attempting to Place Containment Fan Coil Units 21 & 23 in Low Speed Accident Mode,Units Declared Inoperable Due to Low Flow Indication. Caused by Silt in Transmitter Sensing Lines + (ML20033B585)
- 05000245/LER-1981-029-03, /03L-1:on 810908,while Performing Reactor low-low Water Level Functional & Calibr Test,Switch 263-73B Found Sticking.Cause Unknown.Switch Cycled & Recalibr + (ML20033B586)
- 05000220/LER-1981-048-03, /03L-0:on 811019,during Normal Operation,Liquid Poison Pump 11 Was Removed from Svc.Prior to Removal,Pump 12 Was Run to Prove Operability.Pump Removed for Scheduled Maint of Packing + (ML20033B588)
- JAFP-81-1270, Responds to NRC Re Violations Noted in IE Insp Rept 50-333/81-21.Corrective Actions:Monitoring of Diesel Generator Door Monitoring Sys Completed on 811022 + (ML20033B589)
- ML20033B590 + (ML20033B590)
- ML20033B592 + (ML20033B592)
- ML20033B593 + (ML20033B593)
- 05000272/LER-1981-096, Forwards LER 81-096/01T-0.Detailed Event Analysis Encl + (ML20033B594)
- 05000311/LER-1981-111, Forwards LER 81-111/03L-0.Detailed Event Analysis Encl + (ML20033B596)
- IR 05000334/1981020 + (ML20033B598)
- ML20033B600 + (ML20033B600)
- 05000272/LER-1981-096-01, /01T-0:on 811107,during Insp,Svc Water Discovered Leaking from Containment Fan Coil Units 11 & 15.Cause Not Stated.Leak on Unit 15 Repaired W/Belzona Metal Filler. Coil on Unit 11 Isolated by Installing Blank Flange Insert + (ML20033B602)
- ML20033B603 + (ML20033B603)
- 05000311/LER-1981-111-03, /03L-0:on 811022,during Boration Process, Pressurizer Pressure Dropped Below DNB Parameter for 5 Minutes.Caused by Injection of Excessive Amount of Boron in Rcs.Personnel Counseled Re Correct Procedure + (ML20033B604)
- ML20033B605 + (ML20033B605)
- ML20033B608 + (ML20033B608)