ML20033B605
| ML20033B605 | |
| Person / Time | |
|---|---|
| Site: | La Crosse File:Dairyland Power Cooperative icon.png |
| Issue date: | 11/27/1981 |
| From: | Eisenhut D Office of Nuclear Reactor Regulation |
| To: | Linder F DAIRYLAND POWER COOPERATIVE |
| References | |
| TASK-***, TASK-RR LSO5-81-11-081, LSO5-81-11-81, NUDOCS 8112010564 | |
| Download: ML20033B605 (6) | |
Text
_
^
November 27, 1981 Decket No. 50 409 WK 4
LSas-81 11-081 es
~ %,h.
I (o
e!'
.ld
- p.
2=
D 1981= "78-
],,,EC1 Mr. Trank Linder General Manager co.wam Dairyland Power Cooperative
\\g^
8, 2615 East Avenue South 4\\
Lacrosse, Wisconsin 54601
Dear !!r. Linder:
SUBJECT:
SEP REDIRECTION AND TOPIC COMPLETION SCliEDULES -
LACROSSE By letter dated,1uly 7,1981, the staff indicated a concern regarding the success of the redirected SEP program. Our concern wae based on. the quantity of licensee topic assessments raceived versus that which was promised by June 30, 1981, and the quality of those topic assessments.
In that letter we requested a neeting with licensee canage ent to 'issure that the owners are providing sufficient rasources to support SEP redirection and to assure that licensee topic safety analysis reports (SARs) would be co-pleted according to proposed schedules. At that recting the staff requested that each licensee provide their schedules, if different from the staff's proposed schedules, for the completion and subnittal of the remaining SEP topic SARs for their facilities.
t Your letter dated August 19, 1981, provided your schedules. However, as of November 13, 1991, we have received only 4 of the 22 SARs scheduled. Enclosure 1 is a graph (fron f UREG-0485, SEP Status Sumary Peport) of your actual submittals by tenth and your scheduled sub-ittals. Enclosure 2 is the sinilar oraph for all SEP licensees. As shown by these enclosures, sientficant delays are occurring and a substantial effort on your part 1.
equired to rinimize further delay. Based on your perfarnance in meeting schedutes, we cannot assume that tbo remaining topic SARs will be completed and submitted as pronised.
Therefore, we are requesting that your senior canagement attend a neeting with other SEP ifcensee senior management and NFC senior management planned for Decenber 17, 1991, at which the performance, proaram schedules and rajor nile-stones to co~pletion of the Integreted Plant Safety Assessment for each of the SEP plants will be discussed.
W Y k N : $ ( N ).s a
- oe previous yellow for additional corfdIWL$tfiths,.
Ss/,
IS$:DL D:DL G ihas DEisenhut p g g gy[gy}
11/p/81 11/ /81 hDft b
ol$$$$9 Darrell G. Eisenhut, Director P
PDR Division of Licensing omes)
.. Enc.Mura;..J.S... state.1.
SEP8j[)L,,
SEPB:DL ORB #5:PM JhS#5:BC suauwe>
GCwa1ina,;.dk*,hR,u,sseli
- Uh
)[ruNh i[
.. [...
".$..$..$.......y...........f.$..".[
..$.$.S.$..........
.II(l9{81 11/19[,F' 'jy[M",
IVjjyf omy NAC FORM 318 (10-80) NACM 024a OFFICIAL RECORD COPY usc. m m i_ m.u.
- Your letter dated August 19, 1981, provided your schedules. However, as of November 13, 1981, we have received only 4 of the 22 SARs scheduled. is a graph (from NUREG-0485, SEP Status Summary Report) of your actual submittals by month and your scheduled submittals. Enclosure 2 is the similar graph for all SEP licensees. As shown by these enclosures, significant delays are occurring and a substantial effort on your part is required to minimize further delay. Based on your performance in meeting schedules, we cannot assume that the remaining topic SARs will be completed and submitted as promised.
Therefore, we are requesting that your senior management attend a meeting with other SEP licensee senior management and NRC senior management planned for Decenber 17, 1981, at which the performance, program senedules and major milestones to completion of the Integrated Plant Safety Assessment for each of the SEP plants will be discussed.
Sincerely, Darrell G. Eisenhut, Director Division of Licensing
Enclosure:
l As stated l
l cc w/ enclosure:
See next page 1
I l
See previous concurrence sheet oma>
CURNAadE )
omy nac ronu sia 0o-8o3 nncu 024a OFFICIAL RECORD COPY urea mi-me a--,_,_..
Doci:et No. 50-4M LS05 Mr. Frank Linder General Manager Dairyland Power Coooerative 2615 East Avenue South Lacrosse, Wisconsin 54601
Dear Mr. Linder:
SUBJECT:
SEP REDIRECTIO!! AHD TOPIC CDPPLETIOH SCHEDULES -
LACROSSE By letter dated July 7,1981 the staff indicated a concern regarding the success of the redirected SEP program. Our concern was based on the quantity of licensee topic assessrents received versus that which was promised by June 30,1981 and the quality of those topic assessments.
In that letter we requested a necting with licensee canagenent to assure that the owners are providing sufficient resources to support SEP redirection and to assure that licensee topic safety analysis reports (SARs) would be coapleted according to proposed schedules. At that neeting the staff requested that each licensee provide their schedules, if different from the staff's proposed schedules, for the completion and subnittal of the remaining SEP topic SARs for their facilities.
Your letter dated August 19, 1981 provided your schedules. However, as of November
- 13. 1981 we have received only 4 of the 22 SARs scheduled. Enclosure 1 is a graph (from NUREG-0485, SEP Status Sumnary Report) of your actual subnittals by month and your scheduled sutmittals. Enclosure 2 is the similar graph for all SEP licensees. As shown by these enclosures, significant delays are occurring and a substantial effort on your part is required to mininize further delay. Based on your perfomance in neeting schedules, we cannot assume that the renaining topic SARs will be conpleted and submitted as promised.
Therefore, we are requesting that your senior nanagenent attend a neeting with other SEP licensee senior management and HRC senior panagement planned for Decenber 17, 1981 to discuss your performance, program schedules and major milestones to completion of Lacrosse Integrated Plant Safety Assessent.
Si ncerely.
AD:SA:DL D:DL Glainas DFisenhut 11/ /81 11/ /81 Darrell G. Eisenhut, Director niv4einn nf f 4 ecnc 4 rm
_M
.....@.M........
.. 1........ $..
OFFhCE >.EWCIMIt.#f..
AT..st'A.t'F4......
WRussell
..RCaruso DCrutchfield
..... /.a na:dk GCv sua m e>
..w.........
.cc..wLenc.1ns.tte:.... 5.e.e.nu.t.M/g/81,
., g,',', \\...........
.11/,0zit,,,.1]L.,.g.),
1,11...,j.g).,,,,
om>
enc ronu m oo.w nncu oua OFFICIAL RECORD COPY usom nu-m*o
Mr. Frank Linder' cc Fritz Schubert, Esquire U. S. Environmental Protection Staff Attorney Agency Dairy 1and Power Cooperative Federal Activities Branch 2615 East Avenue South Region V Office La Crosse, Wisconsin 54601 ATTN: Regional Radiation Representative
~
230 South Dearbora Street O. S. Heistand, Jr., Esquire Chicago, Illinois 60604 Morgan, Lewis & Bockius 180C M Street, N. W.
Mr. John H. Buck Washington, D. C.
20036 Atomic Safety and Licensing Appeal Board U. S. Nuclear Regulatory Commission Mr. R. E. Shimshak Washington, D. C.
20555 La Crosse Boiling Water Reactor Dairyland Power Cooperative Dr. Lawrence R. Quarles P. O. Box 135 Kendal at Longwood, Apt. 51 Genoa, Wisconsin 54632 Kenneth Square, Pennsylvania 19348
_ Ms. Anne K. Morse Charles Bechhoefer, Esq., Chairman Coulee Region Energy Coalition Atomic Safety and Licensing Board P. O. Box 1583 U. S. Nuclear Regulatory Connission La Crorse, Wisconsin 54601 Washington, D. C.
20555 La C, osse Public Library Dr. George C. Ar.derson,
800 Main Street Department of Oceanography Le. Crosse, Wisconsin 54601 University of Washington Seattle, Washington 98195 U. S. Nuclear Regulatory Ccamission Resident Inspectors Office Mr. Ralph S. Decker Rural Route #1, Box 276 Route 4, Box 1900 Genoa, Wisconsin 54632 Cambridge, Maryland 21613 Town Chairman Thomas S. Moore Tcwn of Ganoa Atomic Safety and Licensing Appeal Scard Route 1 U. S. Nuclear Regulatory Commission GenBa, Wisconsin 54632.
Washington, D. C.
20555 Chairman, Public Service Connission Mr. George R. Nygaard of Wisconsin Coulee Region Energy Coalition Hill rarns State Office Building 2307 East Avenue Madison, Wisconsin 53702 Lacrosse, Wisconsin 54601 Alan S. Rosenthal, Esq., Chairman Atomic Safety and Licensing Appeal Board U. S. Nuclear Regulatory Commission Washington, D. C.'
20555 Mr. Frederick Milton Olsen, III 609 North lith Street Lacrosse, Wisconsin 54601
~
1 n
~
t t
~
J e
O 03 M
tJ O
03 i
YAM 0
O 3
R P
i A
O 03 i
R A
S M
L O
0 A
3 B
T i
FE T
I O
0 M
3 N
Bc A
US e
J S
s H
S0 T
a M
O 03 M
F i
E u
E C
E
[
S
'6 03 NE e
N C
M
/
I 4
9 2
L T
i CO 5
5 1
0 1
[
e P
ES 4
5 6
1 1
[
i G
/
7 3
8 4
S t
L e
J t
ATT I
1 I
1 1
1 B
S M
I
.I tJ 5
8 g
M 5
1 1
t l
t l
e a
e a
g u
g u
r t
r t
a c
a c
T A
T A
E V
H I
T L
T T
E A
G U
N A
R T
O L
T A
M U
A C
M R
U E
C P
>l l
r adsvAtuu 7s o
e s.
LICENSEE TCPIC SUBMITTALS T:w.rc.m EDITTES M
1
~
1
/-
t?S is.1
/
m 1
[
- = L
/
/
I
,1
~/
F l
sa 7
/
/
s ys
- J.
E' SEP CCT eCY lEll JAN Ft3 nWt APit NAT AM AA.
anco a
Target 2
31 1 65 l 26 20 27 4
5 4
0 0
1 0
PER MONTH Ac* ual 2
21 5 l 37 Target 2
, 33 98 124 1A4 171 175 183 187 187 137 188 18s,
Actual 2
23 28 65
,-e-..-.,
-,, _.. ~,
,.,--.,,v...
_4...,w__
-m,.
., _ _ -. - - -.., --... - -, -