Forwards Revised Replacement Pages for IE Mgt Appraisal Insp Rept 50-295/81-04 on 810420-0515
ML20033B590
Person / Time
Site: Zion File:ZionSolutions icon.png
Issue date: 08/17/1981
From: Moseley N
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE)
To: Reed C
COMMONWEALTH EDISON CO.
Shared Package
ML20033B591 List:
References
NUDOCS 8112010549
Download: ML20033B590 (4)


See also: IR 05000295/1981004

Text

_,

,.

._

_

yy

grs ;

sg

ym

w,

g

-

' {y{ '

g

43

Q

g

sf

i

Y

'

y

o.

O

gn

(y

%

.

AUG 171981

Docket tio. 50-295

4

I9

g)%

ro

^'

$[ f3

9

% F

.

Commonwealth Edison Company

  1. yN3 pr

ATTN: Mr. Cordell Reed

-

'N %I$biron08/A 'f

Vice President

- "' '- %

l

P. O. Box 767

Chicago, Illinois 60690

Q

j

  1. .dQL[$

Gentlemen:

Subject: Revisions for Management Appraisal 50-295/81-04(PAS) Dated

August 11, 1981

Enclosed are revised replacement pages for the above referenced management

faspection report. These revised pages have also bean incorporated into the

other distribution copies.

We regret any inconvenience this may have caused.

Sincerely,

Nonnan C. Moseley, Director

Division of Program Development

and Appraisal

Office of Inspection and Enforcement.

Enclosures:

As stated

cc w/encls:

Senior Resident Inspector

Aff

MA 0

  • * Y

Ndil 1,4f

g

Distribution :

g8(

/gst

mod /feg

f

IE File

gg,

pg

f,,,g

M8 [8'#f

H

hman cy

f

JGPartlow cy

JMTaylor cy

NCMoseley cy

8112010549 a10s17

PAB Rdg

3

gDRADOCK05000g

,0p,gp ,,, ,,,D ; P DA.:

omcc) PAB:

, E ,,

PAB:PDA:I

.,,,,,,

................, ,,

, ,,,, ,, , ,,,,,,

,, ... . .

...

,

,

,

S * ^=r> RHe,1,,, ma,n,:pl .J.G,Pa r,t),0.w. ,

,,W# u.M.,,,

. . . . CMo s,e,,9y,, ,

,

,,,, , , , ,,,,,,,,

, ,,,,,,, ,,,, , ,

,,, , . . . . - , ,

  • * * > 8l!.0.l.8' .. .

. 0 ,! 8 '. ,...

. ,8.I. . b.8 ' . . .

80$l81... .

8l

. .."""."." "

" " -

- " "

" " " " " " " -

.

" " "8o-329 eu

.nac ronu ais ,io.soinacu o24o

OFFICIAL RFCORD COPY

r

-

.

.

-

.

-

Appendix A

.

Executive Summary

A team of five NRC inspectors from the Performance Appraisal Section conducted

an announced inspection at the Zion Station.and Commonwealth Edison Company

Offices during April 20 - May 15, 1981.

Management controls in ten areas were

inspected. Nine areas were considered average and one area was considered to be

above average.

A sumary of the results of the inspection is given below.

Committee Activities:

Average (Section 2).

Both the onsite and offsite

review and investigative groups were composed of qualified and capable

individuals.

The number of available participants and the practice of evenly #

-

distributing review items enhanced the quality of the review effort.

The

principal weaknesses were the lack of a requirement to document the significant

items discussed or evaluated during the review process, the lack of provisions

for documenting minority opinions or differing viewpoints, and the failure to

routinely review QA audit reports.

Quality Assurance Audits:

A.erage

(Section 3).

The independent auditing oy

offsil.e teams of the same areas audited by the onsite audit staff was a posi-

tive indication of the licensee's commitment to quality assurance. Management

supported the quality assurance function, and employees accepted QC and QA

activities and requirements.

Weaknesses included the lack of formal documen-

tation of the effectiveness of various program elements audited, the lack of

effective trending of audit findings, and the lack of a formal retraining

program for auditors.

Design Changes and Modifications: Average

(Section 4).

An effective program

for the control of facility design changes and modifications had been estab-

lished and implemented. Significant weaknesses were the lack of external

design interface controls and the lack of a system for correcting generic

design deficiencies.

Maintenance:

Average (Section 5).

A maintenance program had been implemented,

and all maintenance was required to be controlled and documented by the use of

maintenance work requests.

Weaknesses included the lack of control cf vendor

technical manuals, the lack of a formalized preventive maintenance program,

and inadequacies in the work request system to keep shift personnel apprised

of 7.3intenance activies.

Plant Operations:

Average

(Section 6).

An effective program had been imple-

mented for the operation of the Zion station.

Personnel interviewed were

knowledgeable of their responsibilities, exhibited good morale, and had a

positive attitude toward plant safety.

Significant weaknesses included

inadequacies in the control of jumpers and lifted leads and the lack of a

method to ensure that all records, identified as being maintained in active

working files, were eventually transferred to Central Files.

Corrective Action System: Above Average (Section 7).

A corrective action program

had been implemented.

Responsibilities were well defined for tracking and

closecut of identified problems.

Corrective action was timely.

Significant

weaknesses were the lack of a trending program, particularly for equipment

failures and malfunctions, and the lack of a comprehensive listing of

standards and guides to which the licensee was committed.

,

-

m

-

.

.

.

t

.

'

Inspection Summary

Inspection on April 20 - May 1 and May 11-15, 1981 (Report No. 50-295/81-4 (PAS))

Areas In3pected:

A special, announced inspection was performed of the licensee's

management controls over-selected licensed activities.

The inspection (by

five NRC inspectors) involved 515 inspector-hours onsite and at the corporate

office.

Results:

The licensee's management controls for. ten areas were reviewed, and

conclusions were drawn in each area based on observations presented in this

'

report.

The conclusions are presented as above average, average, or below

average as .follows:

Section 2, Committee Activities - Average

Section 3, Quality Assurance Audits - average

Section 4, Design Changes and Modifications - average

_

Section 5, Maintenance - average

Section 6, Plant Operations - average

Section 7, Corrective Action Systems - above average

Section 8, Licensed Training - average, Non-Licensed Training - average

Section 9, Procurement - average

Section 10, Physical Protection - average

Additionally, a number of observations were presented to the Region III Senior

Resident Inspector as potential enforcement findings for. followup as appro-

priate. These observations were also discussed with the licensee during

meetings on May 1 and 15, 1981.

.

t

.

,

a

w,,,

-

,w-

., ,-- -

,

s. , . - - . , . -, - .

,.

.-,e

-,

---

r-

-

e

-2-

-

.

.

.

.

DETAILS

I.

Inspection Scope and Objectives

The objective of the inspection was to evaluate the management control

systems which have been established in support of licensed activities.

The results will provide input to the NRC evaluation of licensees from a

national perspective.

The inspection effort covered licensed activities in selected functional

In each of the functional areas the inspectors reviewed written

c

areas.

policies, procedures, and instructions; interviewed selected personnel;

and reviewed selected. records and documents to determine whether:

.

The licensee had written policies, procedures, or instructions to

a.

provide management controls in the subject areas;

.

The policies, procedures, and instructions of (a) above were

b.

adequate to ensure compliance with the regulatory requirements;

The licensee personnel who had responsibilities in the subject areas

c.

were adequately qualified, trained, and retrained to perform their

responsibilities;

The individuals assigned responsibilities in the subject area under-

d.

' stood their responsibilities; and

The requirements of the subject area had been implemented to achieve

compliance, and activities sampled had been appropriately documented.

e.

The specific findings in each area are presented as observations which are

inspection findings that the inspectors believe to be of sufficient signi-

ficance to be considered in the subsequent evaluation of the licensee's

The observations include perceived strengths and

management performance.

weaknesses in the licensee's management controls that may not have specific

regulatory requirements or guidance.

Where appearing, these are identified in

the report by a "S" or "W" in parentheses.

The observations provide the basis for drawing conclusions in each inspected

The conclusions are presented as Above Average, Average, or

functional area.

Below Average, and represent the team's evaluation of the licensee's management

controls in each area.

Some of the observations identified as weaknesses are potential enforcement

These observations were discussed with the licensee and presented

,

findings.

l

to the Region III Senior Resident Inspector.

The followup of these items will

be performed by the IE Regional Office.

2.

Committee Activities _

The objective of this portion of the inspection was to evaluate the

adequacy of the licencee's management controls associated with their

offsite and onsite reiiew activities.