Forwards IE Insp Rept 50-267/81-23 on 811013-16.No Noncompliance Noted
ML20033B559
Person / Time
Site: Fort Saint Vrain Xcel Energy icon.png
Issue date: 11/10/1981
From: Seidle W
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Lee O
PUBLIC SERVICE CO. OF COLORADO
Shared Package
ML20033B560 List:
References
NUDOCS 8112010522
Download: ML20033B559 (2)


See also: IR 05000267/1981023

Text

,

-

November 10, 1981

In Reply Refer To:

3

RIV

g

Docket: 50-267/Rpt. 81-23

,

,

\\

Public Service Carpany of Colorado

E

B093 0 ggg W ;10'

'

f

ATTN: Mr. O. R. Lee, Vice President

( "4%

'

Electric Production

\\

//

9

Post Office Box 840

Denver, Colorado 80201

.

Gentlemen:

This refers to the inspection conducted by Mr. J. P. Jaudon of our stat'f

during the period October 13-16,1981, of activities authorized by NRC

Facility Operating License DPR-34 for the Fort St. Vrain Nuclear Generating

Station, and to the discussion of our findings with Messrs. E. Hill and

J. U. Gahm and other members of your staff at the conclusion of the inspec-

tion.

Areas exmined during the inspection and our findings are discussed in the

enciased inspection report. Within these areas, the inspection consisged of

selective examination of procedures and representative records, interviews

with personnel, and observations by the inspector.

Within the scope of the inspection, no violations or deviatic,ns were identi-

fied.

One new unresolved item is discussed in paragraph 4 of the enclosed report.

We have also examined actions you have taken with mgard to previously

identified inspection findings. The status of these items is identified in

paragraph 2 of the enclosed report.

In accordance with 10 CFR 2.790 of the Canadssion's mgulations, a copy of

this letter and the enclosed inspection mport will be placed in the NRC's

Public Document Room. If this report contains any infomation that you

believe to be exempt from disclosure under 10 CFR 9.S(a)(4), it is necessary

that you (a) notify this office by telephone within 10 days from the date of

this letter of your intention to file a request for withholding; and (b) sub-

mit within 25 days from the date of this letter a written application to this

'

office to withhold such information. If your receipt of this letter has been

i

delayed such that less than seven days am available for your review, please ,

notify this office promptly so that a new due date mgy be established.

J

[j / h'fl

8112010522 811110

PDR ADOCK 05000267

G

PDR

e

OFFICE

JU

.STS

.

. .PSd

..

. . . RR B. .

h.....EIB.

.IES

-

.

qDD- IV..~

su=~a th[' "11'/3781'"

.

P3audon/nh REHall

TWes

an

'

"..Ti){}[ni"

WCSeid e

JEGjliardo

l

llins

GLMads

N h ~81.. ~ . lh/b1

"ijjf./81

,y

' '1T/T7B1'

'Yi/4,"/sj"

1

~/

. . . .

-~~~

....~ .. ..

... .. . ... .

.. ... .........

... ...... ..

[

NRC FORM 318 (10-80) NRCM O240

OFFICIAL RECORD COPY

g

C

,

Public Service Company of

Colorado

-2-

November 10, 1981

Consistent with Section 2.790(b)(1), any such application must be accompanied

by an affidavit executed by the owner of the information which identifies the

document or part sought to be withheld, and which contains a full statement of

the reasons on the basis which it is claimed that the information should be

withheld from public disclosure. This section further requims the statement

to addmss with specificity the considerations listed in 10 CFR 2.790(b)(4).

The information sought to be withheld shall be incorporated as far as possible

into a separate part of the affidavit.

If we do not hear from you in this

m9ard within the specified periods noted above, the report will be placed in

the Public Document Room.

Should you have any questions concerning this inspection, we will be pleased

to discuss them with you.

Sincemly,

    • Original SIS"N W

W. C. SEIDLE'

W. C. Seidle, Chief

Engineering Inspection Branch

Enclosure:

Appendix - IE Inspection Report 50-267/81-23

cc: w/ enclosure

Fort St. Vrain Nuclear Generating Station

ATTN:

D. W. Warembourg, Manager

Nuclear Production

Post Office Box 368

Platteville, Colorado 80601

J. W. Gahm, Quality Assurance Manager

(sameaddress)

bec to DMD for dist. /N##/

bec dist. by RIV //v##/

BC

NRR/DHFS

Colorado State Dept. of Health

.

PM

NRR/0LB

RRI - Fort St. Vrain

!

AE0D

RAD ASMT BR

ELD

RESEARCH

IE FILE

LPDR

IE/RPRIB

NSIC

NRC PDR

NTIS

.

"'c5>

. .. .. .. ... .

.

. .. .. .

.

.

.

.

.

.

..

. .

. . . . . . . .

'*""*"'>

.. . . ..... . .

..

. . . .

.

.

.

.

..

..

.

....

..

. .. .... .

  • * * >

..... ....... ...

.. . . ....... .

. .. ......

. .

..

. . . .....

.. .... ..

. . . . . . . . . .

. . . .....

( NRC FORM 318 410 30 9 NRCM O2 40