Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20028G901 + (ML20028G901)
- NLS9000368, Forwards Fitness-for-Duty Program Performance Data for Jan-June 1990.Util Provided Addl Info to NRC Re Panel of Drugs Included in Testing Program.Info Re Cutoff Levels for Benzodiazepine in Ltr Incorrect + (ML20028G904)
- ML20028G905 + (ML20028G905)
- B13625, Forwards Response to NRC Request for Addl Info Re 900825 Application for Amend to License DPR-61 Re ESFAS Instrumentation,As Agreed to During 900828 Discussion W/Nrc + (ML20028G906)
- ML20028G907 + (ML20028G907)
- ML20028G909 + (ML20028G909)
- 05000425/LER-1990-011-02, :on 900830,containment Ventilation Isolation Occurred.Caused by Failure of Random Access Memory (RAM) Circuit Board in Data Processing Module.Failed RAM Board Replaced & Returned to Vendor for Analysis + (ML20028G913)
- 05000254/LER-1990-018-01, :on 900829,plant Outside Design Spec for Electrical Separation Criteria for Two Redundant Safety Sys. Caused by Inadequate Engineering Review During Leads Installation + (ML20028G914)
- 05000456/LER-1990-015-02, :on 900827,auxiliary Bldg Vent Stack Grab Sample Missed.Caused by Personnel Error & Deficient Work Practices.Training Provided,Program Modified & Station Reviewing Nonroutine Surveillance Process + (ML20028G915)
- ML20028G916 + (ML20028G916)
- 05000285/LER-1990-021, :on 900829,inadvertent Reactor Protective Sys Actuation Occurred While Operator Changed Power Source. Caused by Operator Not Following Proper Procedures.Operator Counseled + (ML20028G917)
- 05000440/LER-1990-020, :on 900831,maint Activities on Control Room Emergency Recirculation Sys Resulted in Tech Spec Violation & Compromise of Safety Sys.Caused by Program Deficiency. Maint Acitivities & Insp Being Revised + (ML20028G918)
- 05000482/LER-1990-020, :on 900827,portable Sump Pump Installed W/Pump Discharge Directed to Storm Drains,Bypassing Turbine Bldg Drain Monitor LE-RE-59.Caused by Lack of Communication Between Involved Groups + (ML20028G919)
- 05000327/LER-1990-020, :on 900829,ventilation Sys Inoperable Due to Train B Diesel Generator Out of Svc.Caused by Stuck Microswitch Contacts on Pressure Switch 0-PS-311-172. Pressure Switch Adjusted & Returned to Svc + (ML20028G920)
- 05000382/LER-1990-012-01, :on 900825,reactor Tripped Due to Lightning Strike.Station Mod Request Issued to Provide Uninterruptable Power Source for Steam Bypass Control Sys + (ML20028G921)
- 05000352/LER-1990-017-01, :on 900828,ESF Actuation of Primary Containment & Reactor Vessel Isolation Control Sys Occurred.Caused by Technician Inadvertently Shorting Power Supply During Installation of Test Jack.Blown Fuse Replaced + (ML20028G922)
- ML20028G924 + (ML20028G924)
- ML20028G925 + (ML20028G925)
- ML20028G926 + (ML20028G926)
- ML20028G927 + (ML20028G927)
- ML20028G928 + (ML20028G928)
- ML20028G930 + (ML20028G930)
- ML20028G932 + (ML20028G932)
- ML20028G933 + (ML20028G933)
- ML20028G935 + (ML20028G935)
- ML20028G936 + (ML20028G936)
- ML20028G937 + (ML20028G937)
- ML20028G938 + (ML20028G938)
- ML20028G940 + (ML20028G940)
- ML20028G941 + (ML20028G941)
- 05000336/LER-1990-012-02, :on 900827,automatic Reactor Trip Occurred During Bypass Switch Operations.Caused by Operator Error. Procedure Sp 2601D Revised to Incorporate Separate Section on Performing Calibrs + (ML20028G942)
- ML20028G943 + (ML20028G943)
- ML20028G946 + (ML20028G946)
- ML20028G947 + (ML20028G947)
- ML20028G949 + (ML20028G949)
- ML20028G953 + (ML20028G953)
- 05000445/LER-1990-026, :on 900828,surveillance Missed Due to Inadequate Procedural Requirements.Caused by Inadequate Manual Surveillance Scheduling Methods.Station Procedures Revised + (ML20028G955)
- 05000369/LER-1990-025-01, :on 900827,Unit 1 Shut Down Because of Unidentified RCS Leakage Exceeding Tech Spec Limits.Caused by Equipment Failure.Procedure AP/1/A/5500/10 Implemented. Valve 1NC-33 Will Be Repacked at Next Outage + (ML20028G956)
- ML20028G957 + (ML20028G957)
- ML20028G958 + (ML20028G958)
- ML20028G960 + (ML20028G960)
- ML20028G962 + (ML20028G962)
- 05000382/LER-1990-013-01, :on 900903,unsampled Gas Released from Gaseous Waste Mgt Sys.Caused by Internal Leakage Past Discharge Isolation Valves.Administrative Controls in Place to Ensure That Gas Decay Tanks Sampled Prior to Release + (ML20028G963)
- ML20028G964 + (ML20028G964)
- ML20028G965 + (ML20028G965)
- ML20028G966 + (ML20028G966)
- ML20028G970 + (ML20028G970)
- ML20028G971 + (ML20028G971)
- ML20028G972 + (ML20028G972)
- 05000293/LER-1989-036, :on 891122,determined That HPCI Sys Inoperable Due to Inoperable Gland Seal Condenser Blower Motor.Caused by age-related Wear of Motor.Blower Motor Replaced & Blower Tested W/Satisfactory Results + (ML20028G973)
- ML20028G976 + (ML20028G976)