ML20028G958

From kanterella
Jump to navigation Jump to search
Notice of Issuance of Amend 47 to License NPF-62.Amend Revises Tech Specs to Remove Requirement for Isolation of Containment Monitoring & Process Sampling Sys Upon Containment Bldg Exhaust High Radiation Signal
ML20028G958
Person / Time
Site: Clinton 
Issue date: 09/25/1990
From: Hannon J
Office of Nuclear Reactor Regulation
To:
Shared Package
ML20028G954 List:
References
NUDOCS 9010040271
Download: ML20028G958 (2)


Text

I i

+

7590-01 UNITED STATES NUCLEAR REGULATORY COMMISSION ILLINDIS POWER COMPANY. ET A!..

DOCKET NO. 50-461 j

NOTICE OF ISSUANCE OF AMENDMENT TO i

FACILITY OPERATING LICENSE

[

The U.S. Nuclear Regulatory Comission (Comission) has issued Amendment 4

No. 47 to Facility Operating License No. NPF-62, issued to Illinois Power Company and Soyland Power Cooperative, Inc. (the licensee), which revised the Technical Specifications for operation of the Clinton Power Station, Unit No. 1 (thefacility),locatedinDeWittCounty, Illinois. The amendment was effective as of the date of issuance.

This amendment revised the Technical Specifications (TS) to remove the requirementforisolationoftheContainmentMonitoring(CM)andProcess Sampling (PS) Systems upon a Containment Building Exhaust High Radiation signal.

The application for the amendment complies with the standards and requirements of the Atomic Energy Act of 1954 as amended (the Act), and the Comission's rules and regulations. The Comission has made appropriate findings as required by the Act and the Comission's rules and regulations in 10 CFR Chapter 1, which are set forth in the license amendment.

l Notice of Consideration of Issuance of Amendment and Opportunity for Hearing in connection with this action was published in the FEDERAL REGISTER l

9010040271 900925 DR ADOCK 0500 1

a

2 on June 14, 1988 (53 FR 22247).

No request for hearing or petition for leave to intervene was filed following this notice.

For further details with respect to the action see (1) the application i

for amendments dated February 5, 1988 (2) Amendment No. 47 to License No.

NPF-62, (3) the Comission's related Safety Evaluation dated Sept. 25,1990and 1

(4) the Environmental Assessment dated August 6,1990(55FR33192). All of these items are available for public inspection at the Commission's Public

)

Document Room, Gelman Building, 2120 L Street N.W., Washington, D.C., and at the Vespasian Warner Public Library, 120 West Johnson Street, Clinton, Illinois 61727.

A copy of items (2), (3) and (4) may be obtained upon request addressed to the i

U.S. Nuclear Regulatory Cor 'ssion Washington, D.C. 20555, Attention: Director, Division of Reactor Pri

- Ill, IV, V and Special Projects.

Dated at Rockville, doryland this 25th day of September 1990.

i FOR THE NUCLEAR REGULATORY COMMIS510N

/,

/

John M. Hannon, Director Project Directorate 111-3 Division of Reactor Projects - III, IV, Y and Special Projects Office of Nuclear Reactor Regulation l

r.


r-e -

y-..

.